ELDER CONSTRUCTION, INC. | B= | C | 01/03/2019 | final OK pending other finals | DANE | DANE | | B= | C | 6066960 |
ELDER CONSTRUCTION, INC. | B= | P | 12/20/2018 | final OK pending other finals | DANE | DANE | | B= | P | 6059817 |
ELDER CONSTRUCTION, INC. | BFR | P | 06/26/2018 | new interior light gauge framing OK pending other roughs | DANE | DANE | | BFR | P | 5885902 |
GREINER ELECTRIC, LLC. | E= | C | 07/23/2018 | Electrical complete / | ROB | ROB | | E= | C | 5911196 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/12/2018 | FIRE ALARM INSPECTION: Ceiling rough complete / | ROB | ROB | | E= | C | 5901053 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/12/2018 | FIRE ALARM INSPECTION: Ceiling rough complete / | ROB | ROB | | ER | C | 5901052 |
GREINER ELECTRIC, LLC. | ER | C | 07/12/2018 | Rough in for ceiling complete / | ROB | ROB | | ER | C | 5901049 |
GREINER ELECTRIC, LLC. | ER | P | 06/25/2018 | Rough in for walls ok / | ROB | ROB | | ER | P | 5884154 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 06/25/2018 | FIRE ALARM INSPECTION: Rough in for walls ok---boxes mounted and pipe stubbed / | ROB | ROB | | ER | P | 5884150 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 12/20/2018 | LETTER FROM ENGINEER RECEIVED ADDRESSING RATED WALL AND RETURN AIR PATH RECEIVED, WILL SCAN ONTO PERMIT IN THE MORNING. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6059474 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HSP | P | 11/13/2018 | NEED CLARIFICATION FOR RETURN AIR OPENING CUT IN WALL. HOW WAS THE SIZE DETERMINED, IS THIS WALL A RATED WALL. IS THIS A RETURN AIR PASSAGE BACK TO THE RTU ?THIS WILL REQUIRE A ON SITE INSPECTION AND CONTRACTOR TO MEET INSPECTOR ON SITE . | LIDO | LIDO | | HSP | P | 6023380 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 11/12/2018 | NEED TO CONSULT WITH PREVIOUS INSPECTOR / MAY NEED CONTRACTOR TO MEET INSPECTOR ON SITE . | LIDO | LIDO | | H= | P | 6022794 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 11/12/2018 | RECEIVED TEST AND BALANCE REPORT. ( SEE IMAGES) | LIDO | LIDO | | H= | P | 6022438 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/28/2018 | WHERE IS RETURN AIR PATH BACK TO RTU? SURROUNDING WALLS SHEET ROCKED TO DECK. FLEX AND DIFFUSERS OK. FOR FINAL PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | HD | P | 5888198 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/22/2018 | VAV-330 RELOCATED. NEW SUPPLY AIR OK. OK TO WRAP. NO FLEX AND DIFFUSERS AT THIS TIME. | DUSTINS | DUSTINS | | HD | P | 5883100 |