PRO WALL SYSTEMS LLC | B= | C | 09/07/2018 | All other required Final inspections are complete. (This is a computer generated result) | DAKOTAB | DAKOTAB | | B= | C | 5957595 |
PRO WALL SYSTEMS LLC | BSP | R | 09/06/2018 | Test and balance report need to be submitted as heating inspection | DAKOTAB | DAKOTAB | | BSP | R | 5956279 |
PRO WALL SYSTEMS LLC | B= | P | 09/05/2018 | Items corrected -- Building final OK pending other finals. Additional Inspections Required (computer generated): MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 5955309 |
PRO WALL SYSTEMS LLC | B= | P | 08/31/2018 | still need accessible bench at accessible dressing room (17" to 19" high by minimum 42" wide by 20" to 24" deep fixed to wall or non-fixed need back on bench with back minimum 18" above seat) Will still need to maintain 60" turning radius with bench in room and will still need a clear floor space positioned for parallel approach at the bench / all other items corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): CROWN SERVICES INC. Plumbing Final Inspection is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5952734 |
PRO WALL SYSTEMS LLC | B= | P | 08/30/2018 | need bench in accessible fitting room (17" to 19" high by minimum 42" wide by 20" to 24" deep fixed to wall or non-fixed need back on bench with back minimum 18" above seat) / need international symbol of accessibility on bathroom sign / need flush handle on open side of toilet / need single action lever handle knob at bathroom -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): CROWN SERVICES INC. Plumbing Final Inspection is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5951621 |
PRO WALL SYSTEMS LLC | BFR | P | 08/03/2018 | new architects design on file for hard lid and new wall heights / hard lids framed OK / all interior light gauge framing OK pending other roughs | DANE | DANE | | BFR | P | 5922877 |
PRO WALL SYSTEMS LLC | BFR | P | 08/02/2018 | design for hard lids does not match as built in field and need new inspection for 6" framing at hard lid / new architects drawing for 8' high walls and design for hard lids on file | DANE | DANE | | BFR | P | 5921495 |
PRO WALL SYSTEMS LLC | BFR | R | 07/26/2018 | uploaded red lined plan for new wall heights does not have a new stamp from the architect. Need newly stamped drawing from the architect showing new wall heights to be spliced into the permit as it is a design change that is effecting all walls inside of the unit. Also need a design for the hard lids that are being installed as that is a design change as well. | DANE | DANE | | BFR | R | 5914423 |
PRO WALL SYSTEMS LLC | BFR | P | 07/25/2018 | plans show walls to be to under side of deck but were all built to 8' tall - need to splice in wall height changes / all interior light gauge framing OK pending other roughs and splice for wall height / discussed accessible elements and single action at west door | DANE | DANE | | BFR | P | 5913740 |
PRO WALL SYSTEMS LLC | BFR | R | 07/19/2018 | not ready for inspection / need to install all plumbing / plans call for all bathroom and dressing room walls to go to roof deck / need detail for hard lids / need to splice in change of wall heights / need to install all grab bar backing | DANE | DANE | | BFR | R | 5908635 |
COPPER SMITH ELECTRIC INC | E= | C | 08/28/2018 | | BRET | BRET | | E= | C | 5948020 |
COPPER SMITH ELECTRIC INC | ES | C | 08/09/2018 | Commercial Service: 200 amp service for 168 need meter set | BRET | BRET | | ES | C | 5929787 |
COPPER SMITH ELECTRIC INC | ER | P | 07/19/2018 | walls | BRET | BRET | | ER | P | 5907969 |
COPPER SMITH ELECTRIC INC | EUG | C | 06/28/2018 | one floor box ok to cover | BRET | BRET | | EUG | C | 5888524 |
MICK HEATING & SHEET METAL CO. | H= | C | 09/07/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL/GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5957594 |
MICK HEATING & SHEET METAL CO. | H= | P | 08/30/2018 | ROOF OK. 2 LB APPROVAL RECEIVED. MECHANICAL/GAS FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5951357 |
MICK HEATING & SHEET METAL CO. | HC | C | 08/21/2018 | OK TO SET 2 LB METER AT THIS ADDRESS | DUSTINS | DUSTINS | | HC | C | 5940518 |
MICK HEATING & SHEET METAL CO. | HI | C | 08/21/2018 | VERIFY GAS ATTACHMENT ADDED TO PERMIT BY FINAL. NEED 2 LB APPROVAL LETTER FROM GAS PROVIDER BY FINAL. 10 LB TEST OK. MEDIUM PRESSURE STICKERS IN PLACE. REGULATOR OK. EXISTING GAS LINE. | DUSTINS | DUSTINS | | HI | C | 5940499 |
MICK HEATING & SHEET METAL CO. | HD | P | 07/24/2018 | SUPPLY AIR TRUNK AND LATERALS OK, OK TO WRAP. RETURN/EXHAUST AIR OK. NO ROOF TODAY. | DUSTINS | DUSTINS | | HD | P | 5912560 |
CROWN SERVICES INC. | P= | C | 08/31/2018 | corrections made, engineers letter for materials and 3 inch drain sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 5952794 |
CROWN SERVICES INC. | P= | P | 08/30/2018 | need engineers letter as previously noted, toilet handle needs to be on the open side, can not reduce piping for water heater pan drain, need to verify closet flange is anchored, need ladder to inspect water heater. | TAYLOR | TAYLOR | | P= | P | 5950773 |
CROWN SERVICES INC. | PTO | P | 07/25/2018 | need to see floor flange anchored, can submit a photo, by final will need to have engineer letter for pex in walls, and all pvc venting will need to be wrapped in plenum, rest ok | JOSEPHD | JOSEPHD | | PTO | P | 5913325 |
CROWN SERVICES INC. | PB | C | 07/02/2018 | need engineers letter for PVC underground and 3 inch drain for mop sink/ drinking fountain by final. | TAYLOR | TAYLOR | | PB | C | 5891023 |
CROWN SERVICES INC. | PB | L | 06/29/2018 | no call ahead number, no lock box code. | TAYLOR | TAYLOR | | PB | L | 5889732 |