WELLS & WEST GENERAL CONTRACTORS, INC. | B= | C | 01/11/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6076345 |
WELLS & WEST GENERAL CONTRACTORS, INC. | B= | P | 08/06/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5925050 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | P | 07/05/2018 | need to attach mechanical permit and have inspections / need to have plumbing inspections / all interior light gauge framing OK pending other roughs / discussed accessible elements | DANE | DANE | | BFR | P | 5893866 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 08/03/2018 | | CRAIG | CRAIG | | E= | C | 5923051 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/27/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5916129 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 07/27/2018 | ceiling ok except in areas with occupancy sensors, power poles and em lighting (not installed at this time), | BRET | BRET | | ER | P | 5916121 |
PROCOM ELECTRICAL SERVICES, INC. | ER | C | 07/27/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5916116 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/27/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5916117 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/19/2018 | FIRE ALARM INSPECTION: FA Complete / | ROB | ROB | | E= | C | 5908301 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/19/2018 | FIRE ALARM INSPECTION: FA rough in complete / | ROB | ROB | | E= | C | 5908293 |
PROCOM ELECTRICAL SERVICES, INC. | ER | C | 07/19/2018 | FIRE ALARM INSPECTION: FA rough in complete / | ROB | ROB | | ER | C | 5908292 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 07/03/2018 | Rough in ok for walls ---- FA is being cut in / Discussed AFCI/GFCI/TR requirements with owner. / Discussed accessibility requirements with contractor / | ROB | ROB | | ER | P | 5893128 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 08/28/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5947456 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/03/2018 | MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5923974 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/27/2018 | ABOVE CEILING DUCT ROUGH OK / SUPPLY AND RETURN GRILL AND REGISTER FINAL CONNECTIONS OK . FOR FINAL NEED THERMOSTATS INSTALLED / 48" OFF FINISHED FLOOR . TEST AND BALANCE REPORT . | LIDO | LIDO | | HD | P | 5916845 |
DRUMMOND PLUMBING LLC | P= | C | 08/06/2018 | Ok. | DANR | DANR | | P= | C | 5924744 |
DRUMMOND PLUMBING LLC | PTO | C | 07/09/2018 | Ok, aav sink. Note: check waste connection 4th floor at final. | DANR | DANR | | PTO | C | 5896288 |
DRUMMOND PLUMBING LLC | PTO | P | 07/06/2018 | not ready | JOSEPHD | JOSEPHD | | PTO | P | 5894842 |