HOMEOWNER | B= | C | 04/18/2019 | 3rd party air leakage test report received on site / Other final inspection corrections complete | JUSTINL | JUSTINL | | B= | C | 6169915 |
HOMEOWNER | B= | R | 04/10/2019 | Provide Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 / Install Code Compliant Address Numbers / install downspouts. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | DALE | DALE | | B= | R | 6161864 |
HOMEOWNER | BIN | C | 12/04/2018 | ESR on file in plan images | LONNYS | LONNYS | | BIN | C | 6041793 |
HOMEOWNER | BIN | P | 11/26/2018 | Spray foam insulation installed per ES report requirements - Homeowner will upload certificate to complete inspection | TIMOTHYS | TIMOTHYS | | BIN | P | 6034092 |
HOMEOWNER | BFR | C | 11/26/2018 | Items corrected | TIMOTHYS | TIMOTHYS | | BFR | C | 6034089 |
HOMEOWNER | BFR | P | 11/15/2018 | TJIs missing H2.5s to top plate west porch cover / TGIs missing H2.5s to beams throughout / remove float blocks / foam and fire block incomplete / reviewed RBC 2017 energy requirements / OK to insulate as long as items are not covered - insulation ES report on file | LONNYS | LONNYS | | BFR | P | 6026243 |
HOMEOWNER | BFT | C | 08/09/2018 | eng. received for 5 piers at front and soils | DALE | DALE | | BFT | C | 5929766 |
HOMEOWNER | BFN | C | 08/09/2018 | soils received | DALE | DALE | | BFN | C | 5929765 |
HOMEOWNER | BFI | C | 07/24/2018 | 2" ridged | DALE | DALE | | BFI | C | 5912761 |
HOMEOWNER | BFN | P | 07/20/2018 | wall ok, will need stamped open hole and soils | DALE | DALE | | BFN | P | 5909780 |
HOMEOWNER | BFN | P | 07/16/2018 | ok from NW corner to SE corner / will need stamped soils | DALE | DALE | | BFN | P | 5903977 |
HOMEOWNER | BFT | P | 07/11/2018 | need soils and opon hole to complete BFT / footer forms and pads OK - ufer observed | LONNYS | LONNYS | | BFT | P | 5899322 |
D & J QUALITY ELECTRIC INC | E= | C | 02/28/2019 | E= OK-----NO A/C----- | GREGM | GREGM | | E= | C | 6120146 |
D & J QUALITY ELECTRIC INC | ES | C | 11/06/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter / new res. | TOMC | TOMC | | ES | C | 6017545 |
D & J QUALITY ELECTRIC INC | ER | C | 11/06/2018 | 3 - #10 , 1- #6 , no mcc , no central vac , slab on grade | TOMC | TOMC | | ER | C | 6017511 |
D & J QUALITY ELECTRIC INC | EUG | C | 11/02/2018 | 2" pvc with 3/w 4/0 al from pole to house ok | CRAIG | CRAIG | | EUG | C | 6014726 |
HOMEOWNER | H= | C | 03/18/2019 | Notes-- Direct vent boiler in floor heat.. Ventilation switch at electrical panel. | JEFFL | JEFFL | | H= | C | 6135737 |
HOMEOWNER | HC | C | 11/14/2018 | RELEASE METER | BILLS | BILLS | | HC | C | 6025407 |
HOMEOWNER | HRR | C | 11/14/2018 | NOTE: DIRECT VENT BOILER, IN FLOOR AND STAPLE UP HYDRONIC HEAT, WHOLE HOUSE VENTILATION IS FROM MAIN LEVEL BATH #2. FAN IS 80 CFM, CONTINUOUS RUN, 12" OF 4" FLEX, SHUT OFF SWITCH WILL BE AT A LABELED BREAKER AT THE MAIN ELECTRIC PANEL | BILLS | BILLS | | HRR | C | 6025401 |
HOMEOWNER | HWP | C | 11/12/2018 | 65 LB TEST OK FOR IN FLOOR RADIANT FOR UPPER LEVEL. | TREVORH | TREVORH | | HWP | C | 6022939 |
HOMEOWNER | HRR | P | 11/12/2018 | Need to do further research on whole house ventilation requirement for Will contact home owner in the morning NOTE; DIRECT VENT BOILER 3- 80 CFM EF, 1- 110 EF. updated comments added 11-13-18 contractor will need to identify the whole house ventilation requirement chosen. along with the indentification and location of the whole house cutoff switch. for next inspection. | TREVORH | TREVORH | | HRR | P | 6022934 |
FOUNTAIN VALLEY MECHANICAL, INC. | HI | C | 11/02/2018 | 10 LB TEST OK , 1 INCH (MEDIUM PRESSURE) , 1 BOILER , 1 BBQ , 1 DRYER | ANDREWP | ANDREWP | | HI | C | 6014800 |
HOMEOWNER | HWP | P | 08/09/2018 | 65LB TEST OK, IN FLOOR RADIANT AND R-10 INSULATION BOARD OK. OK TO COVER PER MECHANICAL | BILLS | BILLS | | HWP | P | 5928790 |
HOMEOWNER | HWP | P | 08/08/2018 | NOT READY. NOTE: HOMEOWNER INSTALLED INSULATION BOARDS WITH THE PRINTING DOWN, HE DOES HAVE ADDITIONAL BOARDS ON SITE TO VERIFY R-VALUES | BILLS | BILLS | | HWP | P | 5927527 |
HOMEOWNER | P= | C | 03/27/2019 | certificate of potable water ok, see images. | TAYLOR | TAYLOR | | P= | C | 6145454 |
HOMEOWNER | P= | P | 03/25/2019 | still need certificate of potable water, rest ok. | TAYLOR | TAYLOR | | P= | P | 6142875 |
HOMEOWNER | P= | P | 03/18/2019 | need the following ( hammer arrestors through out, drain down at pvb, certificate of potable water, grille at aav for washer, 1 inch air gaps at dishwasher drain and mechanical room ), rest ok. | TAYLOR | TAYLOR | | P= | P | 6135198 |
HOMEOWNER | PTO | P | 11/13/2018 | Need plan splice for added bathroom in attic, rest ok, washer aav. | DANR | DANR | | PTO | P | 6024000 |
HOMEOWNER | PTO | P | 11/12/2018 | can not wet vent floor to floor at washer box, need nail protection thru out, need to anchor floor flanges, rest ok note: homeowner stated that attic will have foam insulation for freeze protection at water lines, check connection at well tank, boiler and water heater at final, will need tempering at master tub and access to pump and tempering, aav @ washer box, vent caps on roof, irrigation stub | JOSEPHD | JOSEPHD | | PTO | P | 6023089 |
HOMEOWNER | PWO | C | 10/26/2018 | will need potable water certification by final | JOSEPHD | JOSEPHD | | PWO | C | 6007512 |
HOMEOWNER | PB | C | 08/03/2018 | | JOSEPHD | JOSEPHD | | PB | C | 5923405 |
HOMEOWNER | XBS | T | 11/13/2018 | PAID (REC#1556011) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: finishing attic | SHELLEY | SHELLEY | | XBS | T | 6024399 |