CONSTRUCTION CONSULTING SOLUTIONS, INC. | B= | C | 05/03/2019 | Final OK / crawl space - AC - no deck | RICHB | RICHB | | B= | C | 6186318 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BTR | C | 02/12/2019 | Underlayment, battens & flashing OK / discussed batten fastening requirements with Contractor | RICHB | RICHB | | BTR | C | 6104750 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BIN | C | 02/12/2019 | Thermal in walls, crawl space & vaulted ceilings OK per plans | RICHB | RICHB | | BIN | C | 6104747 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFR | P | 02/07/2019 | Main level framing OK / still need to glue shims in crawl space - OK to verify at BIN | RICHB | RICHB | | BFR | P | 6100891 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BIN | P | 02/07/2019 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6100207 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 12/11/2018 | Structural fascia framing OK per plans | RICHB | RICHB | | BSP | P | 6048651 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 12/10/2018 | Exterior sheathing OK per plans | RICHB | RICHB | | BSP | P | 6047433 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 11/26/2018 | Engineer observation for foundation and ufer received | RICHB | RICHB | | BSP | P | 6033168 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 11/21/2018 | Portal wall - framing, straps & hold downs OK per plans | RICHB | RICHB | | BSP | P | 6031987 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 11/06/2018 | Floor framing - need to glue shims in beam pockets (OK to inspect at BFR), OK per plans otherwise | RICHB | RICHB | | BSP | P | 6017062 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFD | C | 10/24/2018 | Drain entire (including mechanical area in crawl space) OK / damp proofing OK | RICHB | RICHB | | BFD | C | 6004386 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFT | C | 10/15/2018 | | RICHB | RICHB | | BFT | C | 5995178 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFN | C | 10/15/2018 | Formwork & reinforcement for interior pads and foundation walls OK per plans / ufer observed in West wall | RICHB | RICHB | | BFN | C | 5995175 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFT | P | 10/02/2018 | Formwork & reinforcement for continuous footing OK per plans - still need interior pads inspected / ufer observed at mid-point on West wall | RICHB | RICHB | | BFT | P | 5983211 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 09/28/2018 | Open Hole received - 2400 psf, drain at usable space below grade, floating framing required | RICHB | RICHB | | BSP | P | 5979674 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFN | P | 08/28/2018 | foundation design on file - 2000PSF/ still need to complete BFT / UPDATE- still need to perform inspection | LONNYS | LONNYS | | BFN | P | 5947338 |
GONZALES ELECTRIC, LLC | E= | C | 05/02/2019 | a/c 40 amp breaker, | GARYL | GARYL | | E= | C | 6185556 |
GONZALES ELECTRIC, LLC | E= | R | 05/01/2019 | a/c needs 40 amp max cb, has 45/ cb #37 won't trip with test button, | JOHNN | JOHNN | | E= | R | 6183759 |
GONZALES ELECTRIC, LLC | ER | C | 01/30/2019 | no cen/vac,// jet tub rough in /6 | GARYL | GARYL | | ER | C | 6092891 |
GONZALES ELECTRIC, LLC | ES | C | 01/14/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | JOHNN | JOHNN | | ES | C | 6077743 |
GONZALES ELECTRIC, LLC | ES | R | 01/10/2019 | need ufer. | JOHNN | JOHNN | | ES | R | 6074392 |
BESTWAY PLUMBING, INC | H= | C | 05/02/2019 | corrections made | DAVIDH | DAVIDH | | H= | C | 6185240 |
BESTWAY PLUMBING, INC | H= | P | 05/01/2019 | condensate piping not complete and T&P on 12 gal water heater not to code see 2015 IRC P2804.4 | DAVIDH | DAVIDH | | H= | P | 6184172 |
BESTWAY PLUMBING, INC | H= | R | 03/21/2019 | not ready re-inspection fee will apply next trip if not ready | DAVIDH | DAVIDH | | H= | R | 6139645 |
BESTWAY PLUMBING, INC | H= | P | 03/19/2019 | fireplace vent not complete , water heater vents not trimmed out , can not get to under floor being tiled. re -inspect all | DAVIDH | DAVIDH | | H= | P | 6137140 |
MESA PLUMBING & HEATING INC. | HC | C | 02/06/2019 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6099629 |
MESA PLUMBING & HEATING INC. | HI | C | 02/06/2019 | 10 lb test ok note 2"main line, 2 on demand w/h, 3 fireplaces, and 1 range | DAVIDH | DAVIDH | | HI | C | 6099603 |
MESA PLUMBING & HEATING INC. | HI | R | 02/05/2019 | low test
| DAVIDH | DAVIDH | | HI | R | 6097783 |
BESTWAY PLUMBING, INC | HRR | C | 02/01/2019 | heat pumps | DAVIDH | DAVIDH | | HRR | C | 6095111 |
BESTWAY PLUMBING, INC | HRR | P | 11/14/2018 | under floor ok | DAVIDH | DAVIDH | | HRR | P | 6025452 |
MESA PLUMBING & HEATING INC. | P= | C | 05/01/2019 | No irrigation. | SAMH | SAMH | | P= | C | 6183526 |
MESA PLUMBING & HEATING INC. | PTO | C | 02/05/2019 | Corrections made. | SAMH | SAMH | | PTO | C | 6097386 |
MESA PLUMBING & HEATING INC. | PTO | P | 02/01/2019 | Re-grade tub drain at back master bath. Rest OK. | SAMH | SAMH | | PTO | P | 6094562 |
MESA PLUMBING & HEATING INC. | PTO | R | 01/31/2019 | 2 leaks in DWV, Low test on water, Grade and strap DWV throughout crawl space, need nail protection on cold water at powder bath lav, NOTE; Check mechanical room at final, Need mixing valves at tubs by final. | SAMH | SAMH | | PTO | R | 6093214 |
MESA PLUMBING & HEATING INC. | PB | C | 09/25/2018 | | SHANEN | SHANEN | | PB | C | 5975615 |