CONSTRUCTION CONSULTING SOLUTIONS, INC. | B= | C | 04/29/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6180930 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | B= | P | 04/26/2019 | . Additional Inspections Required (computer generated): External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524). | NICK | NICK | | B= | P | 6179594 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BIN | C | 04/26/2019 | | NICK | NICK | | BIN | C | 6179593 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFR | C | 04/26/2019 | | NICK | NICK | | BFR | C | 6179578 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BTR | C | 02/04/2019 | Underlayment, battens & flashing OK | RICHB | RICHB | | BTR | C | 6096948 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BIN | P | 01/28/2019 | Shims in crawlspace not glued at this time can check at final / R-19 batt insulation in walls and R-38 batt insulation at attic okay / Draft stop and fire blocking okay | SHAUN | SHAUN | | BIN | P | 6089841 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFR | P | 01/23/2019 | Need loose shims glued in crawl space / need to complete fireblocking & draftstopping in several places / spoke with Contractor onsite about these issues - OK to reinspect at BIN | RICHB | RICHB | | BFR | P | 6085463 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BIN | P | 01/22/2019 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6084452 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BLA | C | 01/03/2019 | Lath OK | RICHB | RICHB | | BLA | C | 6067383 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 10/22/2018 | Portal wall sheathing OK per plans | RICHB | RICHB | | BSP | P | 6002098 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 10/22/2018 | Structural fascia framing OK per plans | RICHB | RICHB | | BSP | P | 6002082 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | R | 10/16/2018 | Portal wall inspection - unable to inspect, sheathing and straps not complete at time of inspection | RICHB | RICHB | | BSP | R | 5995650 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 10/08/2018 | Framing & straps for portal walls OK | RICHB | RICHB | | BSP | P | 5989083 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BSP | P | 10/01/2018 | Framing for first floor (accessible via crawl space) OK pending other Roughs | RICHB | RICHB | | BSP | P | 5981497 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFD | C | 09/06/2018 | Drain of usable space OK / Damp proof OK / Drains to interior sump pit | NICK | NICK | | BFD | C | 5956741 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFN | C | 08/28/2018 | foundation forms and reinforcing OK / interior pads OK / ufer observed | LONNYS | LONNYS | | BFN | C | 5947516 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFN | P | 08/28/2018 | foundation design on file on file - 2000PSF - still need to perform inspection | LONNYS | LONNYS | | BFN | P | 5947344 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFT | C | 08/24/2018 | open hole on file / still need to foundation design for BFN | LONNYS | LONNYS | | BFT | C | 5944512 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFT | P | 08/23/2018 | Need site specific foundation design for file / No interior pads installed at time of inspection / All footings OK per design on file / Poor at own risk / Picked up hard copy of open hole report / #2400psf / Drain usable / Isolate and float / | NICK | NICK | | BFT | P | 5943879 |
GONZALES ELECTRIC, LLC | E= | C | 04/25/2019 | | CRAIGS | CRAIGS | | E= | C | 6177787 |
GONZALES ELECTRIC, LLC | ES | C | 01/15/2019 | Residential Underground: new 200 amp., 3-wire service | GARYL | GARYL | | ES | C | 6078575 |
GONZALES ELECTRIC, LLC | ES | R | 01/14/2019 | Residential Underground: 200 amp,3w, new res, need to close hole on top of meter socket/ Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | JOHNN | JOHNN | | ES | R | 6077747 |
GONZALES ELECTRIC, LLC | ER | C | 01/14/2019 | ufer in crawler,ok | JOHNN | JOHNN | | ER | C | 6077746 |
GONZALES ELECTRIC, LLC | ER | R | 01/11/2019 | need HR'S stubbed out into panel, strap pvc inside wall, ufer has beed cut off, will chip out and connect in crawler. | JOHNN | JOHNN | | ER | R | 6075877 |
BESTWAY PLUMBING, INC | H= | C | 04/19/2019 | note permit secured prior to January 1 2019 inspected 2 on demand water heaters, 1 electric water heater 3 fire places. 3 heat pumps for heating and cooling | DAVIDH | DAVIDH | | H= | C | 6171611 |
BESTWAY PLUMBING, INC | H= | L | 04/16/2019 | cbg drove to home locked | DAVIDH | DAVIDH | | H= | L | 6167824 |
BESTWAY PLUMBING, INC | HC | C | 01/22/2019 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6084393 |
BESTWAY PLUMBING, INC | HRR | C | 01/22/2019 | corrections made | DAVIDH | DAVIDH | | HRR | C | 6084388 |
BESTWAY PLUMBING, INC | HRR | P | 01/17/2019 | dryer vent is too long and need install manual on outside fireplace | DAVIDH | DAVIDH | | HRR | P | 6081303 |
BESTWAY PLUMBING, INC | HRR | P | 01/16/2019 | home address not found ,need to ensure construction debris has not been introduced to the duct system, several floor vents are unprotected, all floor register locations ok. Fire places need to be installed to complete inspection. Bath exhaust ok. at next inspection will verify equipment and venting. | TREVORH | TREVORH | | HRR | P | 6079871 |
MESA PLUMBING & HEATING INC. | HI | C | 01/04/2019 | 10 lb test ok note 3 fireplaces, 2 on demand w/h,1 range | DAVIDH | DAVIDH | | HI | C | 6068765 |
BESTWAY PLUMBING, INC | HRR | R | 11/14/2018 | not ready fireplaces not vented no inspection | DAVIDH | DAVIDH | | HRR | R | 6025453 |
BESTWAY PLUMBING, INC | HRR | P | 10/08/2018 | crawl space duct completed, | TREVORH | TREVORH | | HRR | P | 5988420 |
MESA PLUMBING & HEATING INC. | HI | P | 10/04/2018 | 10 lb test ok note 2" main | DAVIDH | DAVIDH | | HI | P | 5986038 |
MESA PLUMBING & HEATING INC. | P= | C | 04/16/2019 | No Irrigation. | SAMH | SAMH | | P= | C | 6166709 |
MESA PLUMBING & HEATING INC. | PTO | C | 01/04/2019 | Corrections made. Note; Check meter and water heaters at final, VTR (2), No irrigation stub. | SAMH | SAMH | | PTO | C | 6068231 |
MESA PLUMBING & HEATING INC. | PTO | R | 01/03/2019 | No Test on Guest Bath DWV, Low test on water, missing upper nail protection throughout, fix Back-grade on hose bibb, set and secure all toilet flanges. | SAMH | SAMH | | PTO | R | 6067533 |
MESA PLUMBING & HEATING INC. | PB | C | 08/17/2018 | | SHANEN | SHANEN | | PB | C | 5938020 |