HI-POINT HOME BUILDERS, LLC | B= | C | 06/03/2019 | drywall completed under the stairs. | NATHAN | NATHAN | | B= | C | 6217384 |
HI-POINT HOME BUILDERS, LLC | B= | P | 05/31/2019 | Missing drywall under stairs in basement / Finished basement - A/C -- Schedule a new Building Final when above items are complete. | PARKER | PARKER | | B= | P | 6216936 |
HI-POINT HOME BUILDERS, LLC | BSP | P | 04/05/2019 | 2 12" piers dug at front of house for landing, splice for basement shows new piers but no design for framing of landing | NICK | NICK | | BSP | P | 6156436 |
HI-POINT HOME BUILDERS, LLC | BFR | C | 04/05/2019 | Frame OK for basement per splice / C02 trusses OK | NICK | NICK | | BFR | C | 6156413 |
HI-POINT HOME BUILDERS, LLC | BFD | C | 03/13/2019 | Image of tie in to street on file | NICK | NICK | | BFD | C | 6132485 |
HI-POINT HOME BUILDERS, LLC | BIN | P | 03/12/2019 | Insulation OK pending frame complete / Check attic at final | NICK | NICK | | BIN | P | 6131572 |
HI-POINT HOME BUILDERS, LLC | BFR | P | 03/12/2019 | Still need to install lateral bracing for C02 trusses in garage / Still need foundation drain complete | NICK | NICK | | BFR | P | 6131567 |
HI-POINT HOME BUILDERS, LLC | BFR | P | 03/07/2019 | Need to install lateral bracing for C02 trusses in garage / Need point loads to run all the way down to foundation in basement / Need to complete foundation drain inspection / OK to insulate | NICK | NICK | | BFR | P | 6126676 |
HI-POINT HOME BUILDERS, LLC | BFN | C | 03/07/2019 | | NICK | NICK | | BFN | C | 6126620 |
HI-POINT HOME BUILDERS, LLC | BSP | P | 01/03/2019 | Portal frame wall OK for garage door opening | NICK | NICK | | BSP | P | 6067427 |
HI-POINT HOME BUILDERS, LLC | BSP | P | 12/21/2018 | Front porch lid and post OK / All ST22 straps OK per detail A | NICK | NICK | | BSP | P | 6061319 |
HI-POINT HOME BUILDERS, LLC | BFT | C | 11/28/2018 | Open hole on file / Drain usable / Isolate and float / #2000psf / Foundation design on file / 3rd party observation on file | NICK | NICK | | BFT | C | 6035999 |
HI-POINT HOME BUILDERS, LLC | BFD | P | 08/15/2018 | Drain of usable space OK / Damp proof OK / Need to inspect connection of foundation drain to street / Need all Eng for footing/foundation | NICK | NICK | | BFD | P | 5935313 |
HI-POINT HOME BUILDERS, LLC | BFT | P | 07/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFT | P | 5901628 |
HI-POINT HOME BUILDERS, LLC | BFD | P | 07/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFD | P | 5901629 |
HI-POINT HOME BUILDERS, LLC | BFN | P | 07/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFN | P | 5901627 |
ROWAN ELECTRIC LLC | E= | C | 05/30/2019 | 15 amp ac--ok | BRIAN | BRIAN | | E= | C | 6214975 |
ROWAN ELECTRIC LLC | ER+ | C | 03/27/2019 | basement ok / wall space under stairs / | MIGUEL | MIGUEL | | ER+ | C | 6146041 |
ROWAN ELECTRIC LLC | ER | C | 03/06/2019 | | JOHNN | JOHNN | | ER | C | 6125342 |
ROWAN ELECTRIC LLC | ES | C | 02/11/2019 | Residential Underground: 200A 3w new res ok to set meter / | MIGUEL | MIGUEL | | ES | C | 6103911 |
ROWAN ELECTRIC LLC | ER | R | 02/11/2019 | buried boxes by exterior siding, front and back /framing at bottom of stairs needs completed to mount boxes / cable drooping below floor joist needs strapped / IR ufer / no MCCs / 2-6/3 AL range, A/C, unfinished basement, no central vac / | MIGUEL | MIGUEL | | ER | R | 6103890 |
GENE'S HEATING AND AIR LLC | H= | C | 05/30/2019 | direct vent furnace, a/c complete, High/Low transfer air and finished basement | DAVIDH | DAVIDH | | H= | C | 6214849 |
GENE'S HEATING AND AIR LLC | HRR+ | C | 04/01/2019 | | MATTM | MATTM | | HRR+ | C | 6151382 |
GENE'S HEATING AND AIR LLC | HSP | C | 03/26/2019 | GENE'S HEATING AND AIR NEEDS AN HRR+ FOR UNIT HEATER VENT IN GARAGE. | MATTM | MATTM | | HSP | C | 6145148 |
PRECISION PLUMBING | HI+ | C | 03/26/2019 | 10LB TEST OK 3/4" BLACK ADDED FOR GARAGE UNIT HEATER | MATTM | MATTM | | HI+ | C | 6145146 |
PRECISION PLUMBING | HC | C | 02/04/2019 | RELEASE METER | PAULO | PAULO | | HC | C | 6097221 |
PRECISION PLUMBING | HI | C | 02/04/2019 | 10# test ok. note: 1 1/4" main at 90' to 1- furnace, 1- water heater, 1- range, 1- fire place and 1- bbq. | PAULO | PAULO | | HI | C | 6097209 |
GENE'S HEATING AND AIR LLC | HRR | C | 01/29/2019 | note: unfinished basement, outside air to return with motorized damper, direct vent furnace, a/c rough and line set. | PAULO | PAULO | | HRR | C | 6091409 |
PRECISION PLUMBING | P= | C | 05/17/2019 | note: finished basement, pvb installed, no master tub installed at this time | JOSEPHD | JOSEPHD | | P= | C | 6202691 |
PRECISION PLUMBING | PTO+ | C | 04/04/2019 | note: basement bathroom finished, aav @ lav | JOSEPHD | JOSEPHD | | PTO+ | C | 6154849 |
PRECISION PLUMBING | PTO | C | 01/24/2019 | VTR (1), Sprinkler stub, Unfinished basement. | SAMH | SAMH | | PTO | C | 6086745 |
PRECISION PLUMBING | PTO | R | 10/24/2018 | not ready, no piping installed. | TAYLOR | TAYLOR | | PTO | R | 6004181 |
PRECISION PLUMBING | PB | C | 09/12/2018 | | SHANEN | SHANEN | | PB | C | 5962362 |
HI-POINT HOME BUILDERS, LLC | XBS | T | 04/09/2019 | PAID (REC#1589456) PLAN SPLICE FEE: $50 by: DANM for Construction: Add landing to stairs | DANM | DANM | | XBS | T | 6160780 |
HI-POINT HOME BUILDERS, LLC | XBS | T | 03/26/2019 | PAID (REC#1585179) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added basement finish to scope. | BPHILLIPS | BPHILLIPS | | XBS | T | 6144472 |
HI-POINT HOME BUILDERS, LLC | XMS | T | 01/08/2019 | PAID (REC#1569634): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct design and heatloss calculations | JUSTINC | JUSTINC | | XMS | T | 6071987 |