MWH CONSTRUCTORS, INC. | B= | C | 08/30/2022 | | ADAML | ADAML | | B= | C | 7500134 |
MWH CONSTRUCTORS, INC. | B= | P | 08/10/2022 | Temp CO: Pending required inspections. ( Expires: 9/9/2022 12:00:00 AM) | AMYP | AMYP | | B= | P | 7477758 |
MWH CONSTRUCTORS, INC. | B= | P | 08/05/2022 | Building finals complete pending all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), WEIFIELD GROUP CONTRACTING INC. Electrical Final Inspection is not Completed yet, STRAIT MECHANICAL LLC Plumbing Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 7472464 |
MWH CONSTRUCTORS, INC. | BSP | P | 08/04/2022 | Engineer letters on file for footing/foundation, soils/compaction, open hole, structural steel, concrete | ADAML | ADAML | | BSP | P | 7470658 |
MWH CONSTRUCTORS, INC. | BSP | P | 07/20/2022 | Updated soils on file | ADAML | ADAML | | BSP | P | 7452739 |
MWH CONSTRUCTORS, INC. | B16 | P | 01/27/2022 | On site courtesy consultation / Interior concrete stairs OK for rise and run tolerances / Discussed 3rd party inspections to include open hole, footing/foundation observations and structural steel/CMU observations / Paperwork to follow | ADAML | ADAML | | B16 | P | 7252592 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 01/06/2020 | Met on site with Bill Fox from Myers and Sons / Walked job site / Reviewed need for open hole report before final inspection called in / Reviewed need for 3rd party observation for footing/foundation/CMU/structural / | NICK | NICK | | BSP | P | 6444512 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 12/17/2019 | Spoke with Bill Fox from Myers and Sons and reviewed job progress / Block being installed for main building / Topping slab installed for roof / Reviewed need for Eng observations for footing/foundation / Need open hole report / Reviewed need for Eng observation of CMU/Welding/Bolting/Structural / Going to set up site visit time to walk with Bill | NICK | NICK | | BSP | P | 6430257 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 10/31/2019 | Site visit to check job progress and contact with point of contact / Left message for Bill Fox with Myers and Sons and reviewed need for open hole report for all new permits / Need 3rd party observations for footing/foundation/drain/bond beams/structural welding/bolting / Work on going for all 3 buildings | NICK | NICK | | BSP | P | 6384590 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 10/02/2019 | Site visit for job progress / Could not locate Bill Fox on site / CMU work still on going for out buildings / Above grade concrete work being done / Steel being installed / Still need all 3rd party observations for footing/foundation/open hole/soils/CMU/Structural | NICK | NICK | | BSP | P | 6355229 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 08/22/2019 | Walked job site to review job progress / Talked to Bill Fox over the phone on previous day / Pre cast being installed / 2 out buildings have separate permits and will need separate observation letters for those permits / CMU almost complete for 2 out buildings / Need all 3rd party observations for footing/foundation / Need open hole report / Need all 3rd party observations for welding/bolting (structure) / | NICK | NICK | | BSP | P | 6310311 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 07/22/2019 | On site visit with point of contact from Myers and Sons con. / CMU getting ready to be installed throughout / Most of foundation work completed / Going to try and dry in the electrical room so electric can be installed / Need all 3rd party observation reports for footing/foundation / Need open hole report / OK to use 3rd party for CMU, will need observation report | NICK | NICK | | BSP | P | 6272543 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 06/25/2019 | Site visit to check progress / Concrete poor still on going at time of inspection / Slab pored for some of the smaller buildings / | NICK | NICK | | BSP | P | 6243807 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 06/07/2019 | Site visit / Wall being pored at time of inspection / Left contact information for Dan from Myers / Left message with Bill Fox from Myers / Chemical building going to be pored soon | NICK | NICK | | BSP | P | 6224111 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 05/15/2019 | Site visit with Dan (from Myers) - concrete wall pour happening at time of visit, discussed forecast for CMU inspections, several walls and slab sections have been poured since last visit - progress being tracked in office and third party inspections are concurrent | RICHB | RICHB | | BSP | P | 6199590 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 04/12/2019 | Site visit with Dan and Mike (from Myers) - discussed ongoing wall & slab concrete placements and third party inspections / discussed upcoming masonry work and PPRBD inspections / discussed adjacent buildings (under separate Permits) and forecasted inspections | RICHB | RICHB | | BSP | P | 6163745 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 03/22/2019 | Discussed progress with Dan (Superintendent) - Work is still progressing below grade and third party inspections are ongoing for this scope, discussed CMU walls and forecasted schedule for that work (none have started yet) | RICHB | RICHB | | BSP | P | 6141265 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 02/15/2019 | Met with Dan (Superintendent) - site visit to discuss progress, slab & wall placements are ongoing, third party inspections are ongoing, discussed forecasted work that will require framing inspections | RICHB | RICHB | | BSP | P | 6108531 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 02/14/2019 | Spoke with Dan (Super) regarding a site visit - due to high winds today, a site visit will be performed tomorrow morning | RICHB | RICHB | | BSP | P | 6107130 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 01/11/2019 | Met with Dan (Superintendent) - discussed overall progress and third party inspections / interior reinforced concrete wall construction is ongoing / discussed adjacent buildings being built under separate Permits | RICHB | RICHB | | BSP | P | 6075815 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 01/10/2019 | Called Contractor for status update - site visit has been scheduled for tomorrow to check progress | RICHB | RICHB | | BSP | P | 6074817 |
MYERS AND SONS CONSTRUCTION, LP | BFN | P | 12/11/2018 | Met with Bill (PM) and Dan (Superintendent) - discussed ongoing progress, inspection forecast, ongoing third party inspections and subcontractor mobilizations / "exterior" water-retaining walls are compete, formwork has progressed to the interior walls, interior slabs are complete / discussed adjacent buildings being built under separate Permits | RICHB | RICHB | | BFN | P | 6048784 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 10/01/2018 | Site visit to check progress - Slab placements are approx 75% complete with only the southern portion outstanding, wall formwork & placement is ongoing, discussed MEP progress and overall schedule | RICHB | RICHB | | BSP | P | 5981434 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 08/29/2018 | Site visit to check progress - slab placements are ongoing on the north end, formwork & reinforcement for the first wall have started, discussed forecasted placements and ongoing third party inspections / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5949212 |
MYERS AND SONS CONSTRUCTION, LP | BFT | P | 07/25/2018 | AUTHORIZED THIRD PARTY INSPECTIOS - Stamped letters to follow | JEREMYA | JEREMYA | | BFT | P | 5914198 |
MYERS AND SONS CONSTRUCTION, LP | BSP | P | 07/25/2018 | On-site meeting with CSU and Meyers to discuss scheduling and project dates. Contractor to use third party inspector for footing, foundation, welding, bolting and masonry. Inspections to be added. | JEREMYA | JEREMYA | | BSP | P | 5914194 |
MYERS AND SONS CONSTRUCTION, LP | B16 | P | 07/24/2018 | Site visit with Sr Bldg Inspector Anderson --- Met with Bill Fox (Myers) and site personnel for Colorado Springs - discussed third party inspections, rated assemblies, accessibility, egress, project schedule and Building Department inspection scope - walked the site and met Dave (Myers Superintendent) | RICHB | RICHB | | B16 | P | 5911832 |
WEIFIELD GROUP CONTRACTING INC. | E= | C | 08/29/2022 | | JOHNN | JOHNN | | E= | C | 7498580 |
WEIFIELD GROUP CONTRACTING INC. | E= | P | 08/03/2022 | previous corrections made/ need labels at mdp with voltage colors/ color 480v phase colors in panels/3 a/c units outside need 480v phase colors in disco's/ Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | JOHNN | JOHNN | | E= | P | 7469810 |
WEIFIELD GROUP CONTRACTING INC. | E= | P | 07/27/2022 | EC had to cancel. | JOHNN | JOHNN | | E= | P | 7461742 |
WEIFIELD GROUP CONTRACTING INC. | E= | P | 06/10/2022 | east side of head mix basin,sed basin,flash basin/ color 480v conductors in discos and equipment/ | JOHNN | JOHNN | | E= | P | 7407154 |
WEIFIELD GROUP CONTRACTING INC. | E= | P | 06/09/2022 | flash and sed gallery: label pumps to match disco's/ color all conductors for proper voltage/ rest of flash and sed,ok | JOHNN | JOHNN | | E= | P | 7406251 |
WEIFIELD GROUP CONTRACTING INC. | E= | R | 06/08/2022 | EC had to can cancel. | JOHNN | JOHNN | | E= | R | 7403745 |
STURGEON ELECTRIC CO INC | E= | C | 06/06/2022 | scope: controls | JOHNN | JOHNN | | E= | C | 7400579 |
WEIFIELD GROUP CONTRACTING INC. | E= | L | 05/02/2022 | EC had to reschedule. | JOHNN | JOHNN | | E= | L | 7359248 |
WEIFIELD GROUP CONTRACTING INC. | ES | C | 10/20/2021 | Commercial Service: 1200 amp,4w, 277/480v/ had shut down/ ok to energize/removed temp tap box, installed permanent gear. | JOHNN | JOHNN | | ES | C | 7149236 |
WEIFIELD GROUP CONTRACTING INC. | EE | L | 02/22/2021 | Renewed online for 1/2 Fee at 2/22/2021 7:59:35 AM (RECEIPT #: 1751638) | WEBSITE | WEBSITE | | EE | L | 6875995 |
STURGEON ELECTRIC CO INC | ER | C | 08/20/2020 | hvac LV in PRT building/ | JOHNN | JOHNN | | ER | C | 6679795 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 08/11/2020 | EC is sending pics of EUG/ | JOHNN | JOHNN | | EUG | P | 6669214 |
WEIFIELD GROUP CONTRACTING INC. | ES | P | 06/17/2020 | Commercial Service: 1200 amp4w,277/480v/ ok to energize/ this is a semi temp situation/ will need to be modified later. | JOHNN | JOHNN | | ES | P | 6607281 |
WEIFIELD GROUP CONTRACTING INC. | ES | R | 06/15/2020 | Commercial Service: 1200 amp,4w, 277/480v, need brass tag, temp service while waiting on main disco, send pic of tag/ Notes: one line starts at pg136,E14. | JOHNN | JOHNN | | ES | R | 6605091 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 03/25/2020 | EC to send pics, no site visit. | JOHNN | JOHNN | | EUG | P | 6521395 |
WEIFIELD GROUP CONTRACTING INC. | ESP | C | 03/19/2020 | ---------------------------------No inspections indoors on this site for minimum 2 weeks. Can only perform outdoor inspections, and those need to be with no contact from on site personnel--------------------- | DEAN | DEAN | | ESP | C | 6516440 |
WEIFIELD GROUP CONTRACTING INC. | ESL | P | 02/19/2020 | Raw water vault slab complete. | JOHNN | JOHNN | | ESL | P | 6486154 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 01/14/2020 | Raw water building: E and S walls, | JOHNN | JOHNN | | ER | P | 6452750 |
WEIFIELD GROUP CONTRACTING INC. | ESL | P | 12/18/2019 | see plan | JOHNN | JOHNN | | ESL | P | 6430933 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 12/03/2019 | duct bank N, see plans, | JOHNN | JOHNN | | EUG | P | 6414048 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 10/17/2019 | partial on duct bank l and u and j ---see plans / | BRIAN | BRIAN | | EUG | P | 6372257 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 10/15/2019 | see plans, duct bank D | JOHNN | JOHNN | | EUG | P | 6368329 |
WEIFIELD GROUP CONTRACTING INC. | ESL | P | 10/03/2019 | see plans: slab, N deck slabs 1-10, | JOHNN | JOHNN | | ESL | P | 6356637 |
WEIFIELD GROUP CONTRACTING INC. | ESL | P | 09/27/2019 | Will check photos next inspection, see Andrew or Mike | GARYL | GARYL | | ESL | P | 6350062 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 08/28/2019 | see plans: duct bank A, pvc from CSU transformer to main disco, | JOHNN | JOHNN | | ER | P | 6316880 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 08/23/2019 | see plan: duct bank A,B | JOHNN | JOHNN | | ER | P | 6312220 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 08/16/2019 | see plans, duct banks:Q,C,D,B,J, | JOHNN | JOHNN | | ER | P | 6303800 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 07/12/2019 | see plans, duct bank | JOHNN | JOHNN | | EUG | P | 6261682 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 07/01/2019 | see plans, wall: NE stairwell, utility chase. | JOHNN | JOHNN | | ER | P | 6249752 |
WEIFIELD GROUP CONTRACTING INC. | ESL | P | 05/06/2019 | see plans: pre treatment south upper deck, sulfuric acid slab on grade, | JOHNN | JOHNN | | ESL | P | 6188082 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 04/09/2019 | SHX slab, see plans/ grd ring,see plan | JOHNN | JOHNN | | ER | P | 6160509 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 03/29/2019 | see plans, below slab only, partial grd ring,ok | JOHNN | JOHNN | | EUG | P | 6148617 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 02/12/2019 | slab on grade, marked/dated on prints see Mike | GARYL | GARYL | | ER | P | 6105299 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 01/17/2019 | Mike will mark and date prints, lifting a transformer | GARYL | GARYL | | ER | P | 6081594 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 01/08/2019 | walls only, marked/dated on EC's prints | GARYL | GARYL | | ER | P | 6072292 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 12/06/2018 | FWS building,slab | JOHNN | JOHNN | | EUG | P | 6045432 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 11/27/2018 | slab,see plan, pretreatment,SOG,31,32 | JOHNN | JOHNN | | EUG | P | 6034647 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 10/23/2018 | marked/dated on prints, slab | GARYL | GARYL | | EUG | P | 6003778 |
WEIFIELD GROUP CONTRACTING INC. | ER | P | 10/11/2018 | 4 pvc conduits in foundation wall at west stair way----ok | BRIAN | BRIAN | | ER | P | 5992450 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 10/11/2018 | slab---ok see plans | BRIAN | BRIAN | | EUG | P | 5992446 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 09/26/2018 | see plans: duct bank O,M | JOHNN | JOHNN | | EUG | P | 5977432 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 09/14/2018 | see plan: duct bank,UG, slab,see page PRT-S2 | JOHNN | JOHNN | | EUG | P | 5965400 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 09/04/2018 | see plans, slab in building | JOHNN | JOHNN | | EUG | P | 5954072 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 08/31/2018 | see plans, road crossing | JOHNN | JOHNN | | EUG | P | 5952549 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 08/23/2018 | EUG ok for partial across road---Will mark prints on 8.24.18 / | ROB | ROB | | EUG | P | 5943326 |
WEIFIELD GROUP CONTRACTING INC. | EUG | P | 08/14/2018 | see plans-----splice duct bank:T,V,X | JOHNN | JOHNN | | EUG | P | 5933847 |
HORIZON MECHANICAL SOLUTIONS | H= | C | 04/29/2022 | ENGINEER LETTER RECEIVED FOR RELOCATED EQUIPMENT IN ELECTRICAL ROOM - SEE IMAGES | MARKB | MARKB | | H= | C | 7357067 |
HORIZON MECHANICAL SOLUTIONS | H= | P | 04/22/2022 | FINAL PENDING - Need RBD approved plan splice per previous inspection notes. TEST AND BALANCE REPORT FOR 3 BUILDINGS RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | P | 7348297 |
HORIZON MECHANICAL SOLUTIONS | H= | P | 11/30/2021 | NOTE ADDED 12/01/21 - THIS PERMIT IS UNDER THE 2009 CODE AND EXTERIOR DUCT ONLY NEEDS TO BE INSULATED TO R8. EXTERIOR DUCT INSULATION AND SKIN ARE COMPLETE. FINAL PENDING - Need plan splice for relocated fan coil units in electrical room. Provide test and balance report. OTHER ITEMS HAVE BEEN ADDRESSED. | MARKB | MARKB | | H= | P | 7192715 |
HORIZON MECHANICAL SOLUTIONS | HWP | P | 08/19/2021 | ----ENGINEER TO ADDRESS: Plan sheet PRT-H5 (electrical rooms prt-101 & 108) Condensate piping for FCU's PRT-1, 2 & 3 not per plan. FCU PRT-2 not installed where shown on plan. All condensate piping manifold together instead of individual lines ran to drain---- OBSERVED 100 PSI TEST ON CONDENSATE PIPING - not connected to units | MARKB | MARKB | | HWP | P | 7078814 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 04/09/2021 | LOWER LEVEL - DAMPER ANGLES COMPLETE FOR SUPPLY & RETURN DAMPERS FOR PRT-3. Still need breakaway connection to supply and access door installed. Still need to insulate exterior duct to R12. | MARKB | MARKB | | HD | P | 6928153 |
HORIZON MECHANICAL SOLUTIONS | HV | C | 04/09/2021 | UNIT HEATER VENTS AND FINAL GAS CONNECTIONS TO ALL NEW EQUIPMENT COMPLETE. | MARKB | MARKB | | HV | C | 6928135 |
HORIZON MECHANICAL SOLUTIONS | HV | P | 03/17/2021 | STILL NEED RETAINAGE VERIFIED AT PRT #3 NOTES: ALL VENTS SEALED AT ALL UNIT HEATERS | JERRYF | JERRYF | | HV | P | 6900994 |
HORIZON MECHANICAL SOLUTIONS | HC | C | 03/16/2021 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6900927 |
HORIZON MECHANICAL SOLUTIONS | HI | C | 03/16/2021 | WILL NEED ALL FINAL CONNECTIONS INSPECTED WHEN READY NOTES: PRESSURE TEST OK AND PIPING PER PLAN (PLAN PAGES 94 AND 95 | JERRYF | JERRYF | | HI | C | 6900926 |
HORIZON MECHANICAL SOLUTIONS | HV | P | 03/03/2021 | NEED GAS INSPECTIONS CALLED WHEN READY NEED ALL SINGLE WALL FLUE'S SEALED AT SINGLE WALL TO B VENT CONNECTIONS | JERRYF | JERRYF | | HV | P | 6887306 |
HORIZON MECHANICAL SOLUTIONS | HE | L | 02/22/2021 | Renewed online for 1/2 Fee at 2/22/2021 9:51:24 AM (RECEIPT #: 1751724) | WEBSITE | WEBSITE | | HE | L | 6876138 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 08/20/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - EXTERIOR DUCT CONNECTIONS AT MUA UNITS PRT 1 -2 - 3 AND 4 (OK) - MAIN FLOOR FIRE DAMPER RETAINAGE X 2 SA / RA AT PRT 4 (OK) - LOWER LEVEL SA / RA FIRE DAMPER GAP AT PRT 3 (OK) / STILL NEED RETAINAGE | JERRYF | JERRYF | | HD | P | 6680502 |
HORIZON MECHANICAL SOLUTIONS | HRP | P | 08/20/2020 | PRESSURE TESTS OK AND PIPING PER PLAN AT THE FOLLOWING UNITS - PRT 1 - 2 - 3 | JERRYF | JERRYF | | HRP | P | 6680453 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 07/16/2020 | THIS INSPECTION WAS FOR EXTERIOR DUCT WORK MAINS AT THE FOLLOWING MUA UNITS - PRT 1 / PRT 2 / PRT 3 / PRT 4 - ALL OK - STILL NEED TIE INS TO UNITS | JERRYF | JERRYF | | HD | P | 6640030 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 07/02/2020 | EXHAUST FANS PRT 1 AND 2 FANS AND DUCT CONNECTIONS OK | JERRYF | JERRYF | | HD | P | 6626264 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 04/08/2020 | SA / RA MAINS AND RUN OUTS OK IN FLASH MIX GALLERY | JERRYF | JERRYF | | HD | P | 6535371 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 03/05/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - RETURN AIR RISER FROM EXTERIOR WALL UP TO SCREENED INTAKE AT MUA / PRT -1 THIS DUCT OK | JERRYF | JERRYF | | HD | P | 6501854 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 01/17/2020 | THIS INSPECTION WAS FOR FIRE DAMPER GAP AT LEVEL 2 (BDA PAGE 95) FOR 2 24 X 18 DAMPERS DAMPER GAP AND RETAINAGE OK | JERRYF | JERRYF | | HD | P | 6456482 |
HORIZON MECHANICAL SOLUTIONS | HD | L | 01/16/2020 | LEFT CELL MESSAGE AT CALL AHEAD NUMBER AT 10:44 - ARRIVED 11:08 - GATE GUARD WAS UNABLE TO REACH MECHANICAL CONTRACTOR / WOULD NOT ALLOW ACCESS TO SITE - STOPPED INSPECTION | JERRYF | JERRYF | | HD | L | 6455059 |
HORIZON MECHANICAL SOLUTIONS | HSP | P | 01/13/2020 | SEE IMAGES FOR FIRE DAMPER INSTALL INSTRUCTIONS. | LIDO | LIDO | | HSP | P | 6450268 |
HORIZON MECHANICAL SOLUTIONS | HD | P | 01/09/2020 | LEVEL 2 ( BDA 95) REMOVE ANGLES TO VERIFY ANNULAR SPACING FOR 24 X 18 SUPPLY AND RETURN AIR FIRE DAMPER IN CHASE WALL . UPPER LEVEL ( BDA 94 ) 20 X 14 SUPPLY AND RETURN AIR DUCT IN NORTH WEST CHASE OK / STILL NEED DUCT INSTALLED IN LOWER PART OF CHASE FOR GALLERY LEVEL ( BDA 92) AND FIRE DAMPERS INSTALLED. | LIDO | LIDO | | HD | P | 6448720 |
STRAIT MECHANICAL LLC | P= | C | 08/10/2022 | Correction complete | FRANKM | FRANKM | | P= | C | 7477599 |
STRAIT MECHANICAL LLC | P= | P | 08/10/2022 | Revise work scope on permit per 10-8-18 & 11-30-18 plumbing inspector correction comments | FRANKM | FRANKM | | P= | P | 7477390 |
STRAIT MECHANICAL LLC | P16 | P | 08/18/2021 | need mechanical inspection for condensate lines. | TAYLOR | TAYLOR | | P16 | P | 7076100 |
STRAIT MECHANICAL LLC | PE | L | 02/18/2021 | Renewed online for 1/2 Fee at 2/18/2021 12:11:45 PM (RECEIPT #: 1751131) | WEBSITE | WEBSITE | | PE | L | 6874058 |
STRAIT MECHANICAL LLC | PRD | P | 07/27/2020 | Need Plan splice for Roof drains throughout main building, and for back Galley Stairwell. Check stairwell downspout at final. | SAMH | SAMH | | PRD | P | 6650901 |
STRAIT MECHANICAL LLC | PTO | P | 07/27/2020 | Need plan splice to change Backflow from 3" to 2" at Water Entry. Complete Roof Drain Plan splice. | SAMH | SAMH | | PTO | P | 6650900 |
STRAIT MECHANICAL LLC | PRD | P | 05/01/2020 | All interior roof drains excluding 3" above stairwells complete pending Plan Splice. | SAMH | SAMH | | PRD | P | 6558151 |
STRAIT MECHANICAL LLC | PRD | P | 04/01/2020 | North West area roof drains and overflow checked excluding last tie in before exiting structure. and 2 drains over stairwell in northwest corner. Need plan revised to match installed piping. | SAMH | SAMH | | PRD | P | 6528770 |
STRAIT MECHANICAL LLC | PRD | P | 03/10/2020 | need plan splice for new roof drain design, for both RD and RDO grid line E-D and 7-10 tested | JOSEPHD | JOSEPHD | | PRD | P | 6505430 |
STRAIT MECHANICAL LLC | PRD | P | 03/05/2020 | Need plan splice for new roof drain design. Checked RD and RDO at G-F line, 7-10 line. Marked area on Plumbing contractors site plan. | SAMH | SAMH | | PRD | P | 6501689 |
STRAIT MECHANICAL LLC | PB | P | 12/20/2018 | Wrong permit number for this inspection, there are three different permits on this site, plumbing contracor needs to attach plumbing to the correct permits for all inspections. Call inspector for questions 799-2875 | JOEL | JOEL | | PB | P | 6059700 |
STRAIT MECHANICAL LLC | PB | P | 11/30/2018 | SHX building underground DWV test OK, still need to correct scope of work | SHANEN | SHANEN | | PB | P | 6039740 |
STRAIT MECHANICAL LLC | PB | P | 10/08/2018 | Add all floor drains and backwater valves to scope of work, underground test OK, cover at own risk | SHANEN | SHANEN | | PB | P | 5988744 |
STRAIT MECHANICAL LLC | PB | P | 07/27/2018 | DWV test OK, Underground plan 1 sheet PRT - H10 | SHANEN | SHANEN | | PB | P | 5916545 |
MWH CONSTRUCTORS, INC. | XBS | P | 08/09/2022 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Reduce scope of work | MICHAELA | MICHAELA | | XBS | P | 7475878 |
STRAIT MECHANICAL LLC | XPS | T | 08/03/2022 | PAID (REC#1888936): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4, 5 revisions: Adjusted sheet PRT-H12, PRT-H13, PRT-H14, PRT-H15 and PRT-H18. | SHANEN | SHANEN | | XPS | T | 7469239 |
MWH CONSTRUCTORS, INC. | XBS | P | 06/20/2022 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Twin T shop drawings | MICHAELA | MICHAELA | | XBS | P | 7418178 |
MWH CONSTRUCTORS, INC. | XBS | T | 05/17/2022 | PAID (REC#1884319): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Additional structural details. | MICHAELA | MICHAELA | | XBS | T | 7378252 |
MWH CONSTRUCTORS, INC. | XBS | T | 04/13/2022 | PAID (REC#1864867): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 7336726 |
MWH CONSTRUCTORS, INC. | XBS | T | 03/04/2022 | PAID (REC#1859444): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Translucent panels. | MICHAELA | MICHAELA | | XBS | T | 7291080 |