THE COPESTONE COMPANY | B= | C | 02/01/2019 | provide roof warranty - rest ok -- Schedule a new Building Final when above items are complete/ update/ roof warranty not required | SCOTTS | SCOTTS | | B= | C | 6094602 |
THE COPESTONE COMPANY | BFR | C | 02/01/2019 | | SCOTTS | SCOTTS | | BFR | C | 6094594 |
THE COPESTONE COMPANY | BIN | C | 01/30/2019 | roof thermal corrections complete | SCOTTS | SCOTTS | | BIN | C | 6091932 |
THE COPESTONE COMPANY | B= | P | 01/30/2019 | provide accessible signage for bathrooms -- provide roof warranty -- complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, External Agency Inspection UBS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), External Agency Inspection UWS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), DIRECT EQUIPMENT SERVICE, INC. Mechanical Final Inspection is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet, JOE'S ELECTRIC COMPANY Electrical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6091923 |
THE COPESTONE COMPANY | BIN | P | 01/23/2019 | roof exterior thermal inspection/north half beyond draftstop insulation installed/ couple of batts to be wired up per plan/can see next inspection -- training with Tom | SCOTTS | SCOTTS | | BIN | P | 6085511 |
THE COPESTONE COMPANY | BFT | C | 01/22/2019 | 3rd party observation summary letter on file | SCOTTS | SCOTTS | | BFT | C | 6083911 |
THE COPESTONE COMPANY | BIN | P | 01/17/2019 | onsite meeting with Copestone project manager Kirk / observed R49 batt insulation in progress of being relocated from the bottom of the trusses to the roof deck over the cooler area and main area south of the draftstop / still need to inspect all batt insulation and draftstop completed as per the approved design / per conversation with Kirk batt insulation to be installed as per plan and access will be provided for re-inspection | BRIANB | BRIANB | | BIN | P | 6082045 |
THE COPESTONE COMPANY | BIN | P | 01/08/2019 | after further review/insulation installed at bottom of trusses and creates access issue to mechanical equipment/provide splice for access and insulation installed different from plan/update/splice needs to show thermal envelope being moved and venting for unconditioned space/provide full splice -- still need to see draftstop called out on plans | SCOTTS | SCOTTS | | BIN | P | 6071304 |
THE COPESTONE COMPANY | BIN | P | 12/26/2018 | partial insulation -- attic area above sales floor R49 installed/exceeds minimum R40 per Comcheck | SCOTTS | SCOTTS | | BIN | P | 6062232 |
THE COPESTONE COMPANY | BIN | P | 12/04/2018 | exterior thermal inspection/R19 batts in walls and R7.5 continuous on exterior per com check -- still need to complete BFT/BFN -- training with Tom | SCOTTS | SCOTTS | | BIN | P | 6042078 |
THE COPESTONE COMPANY | BFR | P | 12/03/2018 | interior and remainder of exterior framing ok/reviewed accessibility -- complete other roughs | SCOTTS | SCOTTS | | BFR | P | 6040791 |
THE COPESTONE COMPANY | BIN | P | 11/16/2018 | partial insulation inspection for walls at side and rear of cooler/insulation ok -- frame items on walls at cooler and roof ok | SCOTTS | SCOTTS | | BIN | P | 6027710 |
THE COPESTONE COMPANY | BFR | P | 11/14/2018 | partial framing inspection for walls by cooler -- per detail & on S5.1/missing anchor bolts within 9" of front of HDU11's -- still need to complete corrections from previous inspection along roof line -- discussed with Kirk w/Copestone 3rd party observations/providing roof warranty -- interior framing not yet complete/will review accessibility at interior frame | SCOTTS | SCOTTS | | BFR | P | 6024849 |
THE COPESTONE COMPANY | BFR | R | 11/13/2018 | unable to make contact with site representative/call ahead sent via system and physical call | SCOTTS | SCOTTS | | BFR | R | 6023602 |
THE COPESTONE COMPANY | BFR | P | 11/07/2018 | partial framing for parapet and cricket framing per details 1/4/7/8 on S4.1 and details 1/2/3/4/5 on S6.1 -- per detail 1 on 6.1/CMST12's installed/inner row around perimeter require 2 2x or 1 3x blocking under/correct nails only through sheathing -- H6 per detail 4 on S6.1 not below yet -- per shear schedule/missing anchor bolts @ 48" oc at all walls and 12" of plate breaks -- will review accessibility next interior frame inspection | SCOTTS | SCOTTS | | BFR | P | 6018443 |
THE COPESTONE COMPANY | BFI | P | 09/07/2018 | Building foundation insulation OK / R10 rigid installed around interior perimeter of foundation / need Open Hole and Foundation Observation reports. | CHUCK | CHUCK | | BFI | P | 5958548 |
THE COPESTONE COMPANY | BFT | P | 08/24/2018 | Perimeter footing inspection / rebar layout per plan / OK to use 3rd party / need engineering paperwork / training with Chuck | RICHB | RICHB | | BFT | P | 5945450 |
JOE'S ELECTRIC COMPANY | E= | C | 01/30/2019 | store complete | CHIPO | CHIPO | | E= | C | 6092557 |
JOE'S ELECTRIC COMPANY | E= | P | 01/29/2019 | enterior final all okay except mounting sign on back wall/still need exterior------fueling permit needs exterior rough in complete as well as pack and seal inspection for final | CHIPO | CHIPO | | E= | P | 6091172 |
JOE'S ELECTRIC COMPANY | ER | C | 01/29/2019 | | CHIPO | CHIPO | | ER | C | 6091170 |
JOE'S ELECTRIC COMPANY | ER | P | 01/24/2019 | ABOVE CEILING OK IN BACK STORAGE AREA ----- | GREGM | GREGM | | ER | P | 6086772 |
JOE'S ELECTRIC COMPANY | ER | P | 01/15/2019 | above ceiling ok in sales floor | CRAIG | CRAIG | | ER | P | 6079085 |
JOE'S ELECTRIC COMPANY | ES | C | 12/27/2018 | Commercial Service: 1000 amp 4/w new service ok to set meter | CRAIG | CRAIG | | ES | C | 6063988 |
JOE'S ELECTRIC COMPANY | ES | R | 12/21/2018 | see notes on ER | CRAIG | CRAIG | | ES | R | 6061347 |
JOE'S ELECTRIC COMPANY | ER | P | 12/21/2018 | had consultation with contractor on service | CRAIG | CRAIG | | ER | P | 6061346 |
JOE'S ELECTRIC COMPANY | EUG | P | 12/18/2018 | 3/4" pvc north side pole lights ok | CRAIG | CRAIG | | EUG | P | 6056262 |
JOE'S ELECTRIC COMPANY | ER | P | 11/30/2018 | Interior walls & bathroom hardlids ---- Discussed accessibility requirements with contractor / | JOSEPH | JOSEPH | | ER | P | 6039182 |
JOE'S ELECTRIC COMPANY | EUG | P | 10/30/2018 | 1 - 1" pvc and 6 - 3/4" pvc going to tanks | CRAIG | CRAIG | | EUG | P | 6010909 |
JOE'S ELECTRIC COMPANY | EUG | P | 09/24/2018 | 3 - 4" pvc from city xfmr to building ---------- need to contact CSU also | CRAIG | CRAIG | | EUG | P | 5974357 |
JOE'S ELECTRIC COMPANY | ESL | P | 09/24/2018 | 3/4" PVC for floor plugs / walls | CRAIG | CRAIG | | ESL | P | 5974351 |
JOE'S ELECTRIC COMPANY | EUG | P | 09/14/2018 | 45 conduit 1" and 3/4" under building going to tanks / signs / gas dispensers | CRAIG | CRAIG | | EUG | P | 5965946 |
DIRECT EQUIPMENT SERVICE, INC. | H= | C | 01/31/2019 | 350 PSI PRESSURE TEST FOR 2 BEVERAGE MACHINES, CONDENSATE AND LABELING OK. | MARKB | MARKB | | H= | C | 6093916 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 01/28/2019 | Revised Test And Balance received | MARKB | MARKB | | H= | C | 6089614 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/24/2019 | FINAL PENDING - Correction of EF-3 on TAB report. PLAN SPLICE ON FILE REMOVING REQUIREMENTS FOR CO2 | MARKB | MARKB | | H= | P | 6087117 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/22/2019 | FOR FINAL - Need duct for EF-3 completed with CO2 interlocks and monitor - EF-3 is not for CO2 tanks, tanks are shown outside on approved A drawings. EF-3 is used to remove heat and CO2 off floor for equipment.
| MARKB | MARKB | | H= | P | 6085095 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HSP | P | 01/22/2019 | TEST AND BALANCE RECEIVED BUT STILL NEED EF-3 OUTLET FOR CO2 ADDRESSED BY ENGINEER MOVING CO2 TANKS OUTSIDE WITH A PLAN SPLICE AND FIRE REVIEW. EF-3 READING NOT WITHIN 10% OF CURRENT APPROVED SCHEDULE. | MARKB | MARKB | | HSP | P | 6083810 |
DIRECT EQUIPMENT SERVICE, INC. | HRP | C | 01/18/2019 | BY FINAL - Add 8 condensing units to permit scope, complete condensate for sandwich cooler and ice makers, label equipment on roof. 325 X 4 PSI PRESSURE TEST ON 3 WALK IN COOLERS AND 1 WALK IN FREEZER, INSULATION AND SUPPORT OK. CONDENSATE LINES COMPLETE FOR WALK IN COOLERS AND FREEZER. NO REFRIGERATION ALARMS REQUIRED PER ENGINEER CALC'S ON PLANS. REFRIGERATION EQUIPMENT LISTED ON A7.0 SHEET | MARKB | MARKB | | HRP | C | 6083176 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/15/2019 | ALL EQUIPMENT CONNECTIONS COMPLETE | MARKB | MARKB | | H= | C | 6079254 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | C | 01/08/2019 | SEE "HSP" NOTES ABOVE CEILING DUCT - FLEX AND DIFFUSERS COMPLETE. NO ROOF | MARKB | MARKB | | HD | C | 6071760 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HSP | P | 01/08/2019 | CAN NOT ENTER A FINAL PARTIAL UNTIL REFRIGERATION CONTRACTOR IS ATTACHED - HAD ON SITE CONSULT WITH REFRIGERATION CONTRACTOR AND HE WILL BE ATTACHING TO THE PERMIT. THE ROOF INSULATION HAS BEEN BROUGHT DOWN BELOW THE DUCT - WILL NEED A PLAN SPLICE ON WHICH THE ENGINEER WILL NEED TO ADDRESS ACCESS TO VOLUME DAMPERS, SMOKE DAMPERS AND CO2 TANK MOVING OUTSIDE AND DELETING EXHAUST FAN FOR CO2. | MARKB | MARKB | | HSP | P | 6071755 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 01/07/2019 | ----STILL NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT---- 10 PSI PRESSURE TEST FOR GAS PIPING ON ROOF INSTALLED PER PLAN OK.
NOTE ADDED 1/10/19: CSU HAS INVESTIGATED EQUIPMENT CAPABILITIES AND WILL BE PROVIDING 14" W.C. SERVICE AS DESIGNED PER PLAN. | MARKB | MARKB | | HI | C | 6070514 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 01/04/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6069066 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/04/2018 | ----NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT---- ABOVE CEILING - EF-1 & 2 EXHAUST FANS AND DUCT ABOVE HARD LIDS COMPLETE. | MARKB | MARKB | | HD | P | 6042553 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 11/27/2018 | NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT. ----NEED ENGINEER TO ADDRESS NOTE #10 ON M2.1 SHEET TALKING ABOUT SMOKE DAMPERS - NO DESCRIPTION WITH WHAT NEEDS TO HAPPEN OR INSTALL DETAIL WITH DUCT OR CAP---- ABOVE CEILING DUCT - SUPPLY/RETURN/EXHAUST MAINS INSTALLED PER PLAN OK TO WRAP. | MARKB | MARKB | | HD | P | 6035344 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/19/2018 | 10 PSI PRESSURE TEST OK ON 2" STUB AT METER AND 11/4" UP INTERIOR WALL PER PLAN. STILL NEED ROOF PIPING INSTALLED. NO METER STUB AT THIS TIME. | MARKB | MARKB | | HI | P | 6029368 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/31/2019 | correction made | TED | TED | | P= | C | 6093208 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 01/24/2019 | still need urinal partition installed, need aav installed on center area floor drain, still backflow device installed for irrigation | TED | TED | | P= | P | 6086801 |
FRONTIER MECHANICAL SYSTEMS INC | PWO | P | 01/22/2019 | install backflow protection for yard hydrant. | TAYLOR | TAYLOR | | PWO | P | 6084863 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 01/22/2019 | install backflow protection at irrigation and yard hydrant, need access to isolation valve and trap primers, leak at flush valve for womens restroom, install urinal partitions, need 1 1/2 clearance from top of flush valve to bottom of grab bar at womens restroom, need trap guards at un-used floor sinks, missing hammer arrestor at ice maker, re- inspect all. | TAYLOR | TAYLOR | | P= | P | 6084837 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/03/2018 | Need PWO inspection for yard hydrant, rest ok. Note: at final check water heater, water entry, access doors isolation valves - trap primers. | DANR | DANR | | PTO | P | 6041490 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | C | 11/20/2018 | roof drains and over flow drains | TED | TED | | PRD | C | 6030512 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/20/2018 | single floor sink vent in outside wall through roof | TED | TED | | PTO | P | 6030507 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/19/2018 | water line in wall to silcock on north east side behind coolers, note: need a pwo inspection on yard hydrant run and covered, to tank area | TED | TED | | PTO | P | 6029067 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/25/2018 | water piping in under footer ( see images) | TED | TED | | PB | P | 5975018 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 09/21/2018 | 2 outlets run under footer from inside, test ok | TED | TED | | PRD | P | 5972261 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/21/2018 | grease and sanitary drains test and design ok, outside grease trap vents under footer up into inside building wall test ok, still need water main run up into meter room | TED | TED | | PB | P | 5972258 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/18/2018 | sanity deep base with branches less bathroom group area ok, grease deep base from west to east through store ok, branches east of hand sink ok, plan marked | TED | TED | | PB | P | 5968084 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 01/23/2019 | PAID (REC#1571373) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to relocate CO2 tank to outside and remove detection system | JUSTINC | JUSTINC | | XMS | T | 6086167 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 11/02/2018 | PAID (REC#1554393) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-2-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6013801 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 11/01/2018 | PAID (REC#1554393) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: DELTA... A | DALEH | DALEH | | XMS | T | 6012617 |
JOE'S ELECTRIC COMPANY | XES | T | 10/30/2018 | PAID (REC#1554394) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revisions throughout - background change - equipment location change. | BERTHA | BERTHA | | XES | T | 6010117 |
THE COPESTONE COMPANY | XBS | T | 10/26/2018 | PAID (REC#1554395) PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout including moving some exterior opening and many equipment changes | DANM | DANM | | XBS | T | 6008117 |
THE COPESTONE COMPANY | XBS | T | 09/17/2018 | PAID (REC#1537795) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: New chase behind drinking fountain; moved drinking fountains | LBENNETT | LBENNETT | | XBS | T | 5966685 |