MARK YOUNG CONSTRUCTION, INC. | B= | C | 12/28/2020 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6819341 |
MARK YOUNG CONSTRUCTION, INC. | B= | P | 12/03/2020 | Engineer letter on file for grout and mortar as well as welding and bolting at new opening /Pending fire final Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | ADAML | ADAML | | B= | P | 6794914 |
MARK YOUNG CONSTRUCTION, INC. | BE | L | 12/02/2020 | Renewed for No Fee at 12/2/2020 1:08:03 PM | TERRI | TERRI | | BE | L | 6794139 |
MARK YOUNG CONSTRUCTION, INC. | B= | L | 05/27/2020 | still need engineer observations for hole in east wall for refrigeration lines that require welding and bolting / engineer observations on file for rack house slab and for rack house fence. still need to complete fire final. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | L | 6585067 |
MARK YOUNG CONSTRUCTION, INC. | BE | L | 05/27/2020 | Re-opened permit for no fee / Talked to contractor on phone and discussed all items required to complete the B= including the F= | DANE | DANE | | BE | L | 6583736 |
MARK YOUNG CONSTRUCTION, INC. | B= | P | 06/05/2019 | engineer letter of observation received for density and moisture tests at rack house and for opening in CMU at Auto Service Department and for welding and bolting at new CMU opening at Auto Service Department / still need stamped observations for the new opening on the east wall through the CMU for refrigerant lines from rack house that page S2 states needs reinforcement and welding and bolting and for reinforcement of turn down slab under the rack house as page S2 calls for reinforcement of slab and turn downs of slab and for the installation of the post and fencing for the screen fence around the rack house that is 10' tall and is to have posts installed per detail on page S2 / need to complete fire final -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | P | 6220718 |
MARK YOUNG CONSTRUCTION, INC. | B= | P | 05/31/2019 | need engineer observation for turn down slab at the rack on the east side of the building and for the fence construction around the rack and for the hole cut through the CMU wall from the rack to the interior of the building / need to complete all other finals / final OK pending receipt of engineer observations and all other completed finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), MARK YOUNG CONSTRUCTION, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6216157 |
MARK YOUNG CONSTRUCTION, INC. | BFR | P | 08/28/2018 | new interior light gauge fur out framing at west wall of new walk in cooler in produce OK pending other roughs | DANE | DANE | | BFR | P | 5947613 |
MARK YOUNG CONSTRUCTION, INC. | BSP | T | 07/19/2018 | PAID (REC#1531313) ADDITIONAL PLAN REVIEW TIME: $100 From: SHELBY New sheets added after approval | SHELBY | SHELBY | | BSP | T | 5908372 |
SECURITY TECHNOLOGY SERVICES LLC | E= | C | 02/05/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 6098239 |
SECURITY TECHNOLOGY SERVICES LLC | ER | P | 12/03/2018 | FIRE ALARM INSPECTION: Need to complete cabling down to panel--Ok to install devices--Plans and red card to be at old FA panel in hall by pharmacy at rear of store / | ROB | ROB | | ER | P | 6041418 |
BIBLE ELECTRIC, INC. | E= | C | 10/12/2018 | cooler' s ok in club pickup / deli plug ok / core drop plugs in front of meat cooler's ok | CRAIG | CRAIG | | E= | C | 5992820 |
BIBLE ELECTRIC, INC. | E= | T | 10/11/2018 | PAID (REC#1546675): AFTER-HOURS INSPECTION: $200 From: MATTHEW E= | MATTHEW | MATTHEW | | E= | T | 5992387 |
BIBLE ELECTRIC, INC. | E= | P | 10/11/2018 | lifts okay, EDC-2--- panels okay, breaker room | GARYL | GARYL | | E= | P | 5992103 |
BIBLE ELECTRIC, INC. | E= | P | 10/08/2018 | Cash register area complete--Electronics area complete--Front sales area complete---Poultry meat case and lighting above complete---Auto lift cannot be connected with rubber cord / | ROB | ROB | | E= | P | 5989259 |
BIBLE ELECTRIC, INC. | ER | T | 10/08/2018 | PAID (REC#1545114) AFTER-HOURS INSPECTION: $200 From: TERRI 10/8/18 9PM AFTER-HOURS INSPECTION: $200 From: MATTHEW above ceiling | MATTHEW | MATTHEW | | ER | T | 5988110 |
BIBLE ELECTRIC, INC. | E= | P | 10/05/2018 | Reel cord recpts ok in electronics and christmas decorations area--could not check cords to east of that area, called front sales area on inspection request, as they were rolled up and had no lift access----To busy at cash registers to check anything out / | ROB | ROB | | E= | P | 5987663 |
BIBLE ELECTRIC, INC. | ER | P | 09/26/2018 | need paper work on single pole 20 amp. for afc rating in panel HR, note!!! new walk in cooler, 3-cabinet coolers located in meat area inspected and okay, Rack house C panel?? okay NOTE! have blue prints on site | GARYL | GARYL | | ER | P | 5977415 |
BIBLE ELECTRIC, INC. | ER | L | 09/24/2018 | called @ 2:55 --- I called 3 times to find out where to meet them at --- voice mail for that phone had not been sent up yet --- left at 3:25 | CRAIGS | CRAIGS | | ER | L | 5974736 |
BIBLE ELECTRIC, INC. | ES | P | 09/07/2018 | Commercial Service: 800 amp breaker change out and feeders to new panel HG ok-----------------Feeders to panel HR ok, need to change all breakers to35k-----------Rack C panel was locked out and did not access / | ROB | ROB | | ES | P | 5958053 |
BIBLE ELECTRIC, INC. | ER | P | 08/29/2018 | Electronics area, cash wraps ok--Panel HG locked / | ROB | ROB | | ER | P | 5949741 |
BIBLE ELECTRIC, INC. | ER | P | 08/28/2018 | Rough in ok for water cooler receptacle to top of wall near j box in joist and 3/4" EMT from floor to top of wall for feed to food case--- Both located on west side of cooler wall and to the south of cooler door / | ROB | ROB | | ER | P | 5948220 |
MARK YOUNG CONSTRUCTION, INC. | H= | C | 05/31/2019 | LEAK DETECTION, ALARMS AND CONDENSATE LINES ALL OK. REFRIGERATION FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6216835 |
TDR CONTRACTORS, INC. | H= | C | 10/10/2018 | SUPPORT FOR FOR EXHAUST DUCT INSTALLED AND VERIFIED. | LIDO | LIDO | | H= | C | 5991565 |
TDR CONTRACTORS, INC. | H= | P | 10/10/2018 | PARTIAL PENDING FOR - NEED TO ADD SUPPORT TO EF-14 EXHAUST HORIZONTAL DUCT ABOVE CEILING - MAXIMUM SPACING 10 FEET. | LIDO | LIDO | | H= | P | 5991475 |
TDR CONTRACTORS, INC. | HD | P | 10/10/2018 | NEED TO ADD SUPPORTS TO EXHAUST DUCT ABOVE CEILING / EVERY 10 ft MAXIMUM SPACING. ALL EXHAUST , RETURN GRILLS REPLACED PER SCOPE OF WORK. EF-14 THERMOSTAT IN PLACE, ROOF OK. | LIDO | LIDO | | HD | P | 5991470 |
MARK YOUNG CONSTRUCTION, INC. | HRP | P | 08/30/2018 | SIX 350 LB TEST FOR ABOVE CEILING NEW RACK SUPPLY AND RETURN REFRIGERATION LINES INTO BUILDING FROM NEW RACK ( DTC )LOCATED EAST OF BUILDING .WILL NEED PRESSURE TEST FOR REFRIGERATION LINES WHEN INSTALLED TO NEW EQUIPMENT/ WILL NEED TO SEE ALL LEAK DETECTION / ALARMS /CONDENSATE DISPOSAL BY FINAL . | LIDO | LIDO | | HRP | P | 5950970 |
INTERSTATE MECHANICAL, INC. | P= | C | 10/12/2018 | Correction made. | DANR | DANR | | P= | C | 5992934 |
INTERSTATE MECHANICAL, INC. | P= | P | 10/12/2018 | Need drinking fountain and pvb added to scope to final, rest ok. | DANR | DANR | | P= | P | 5992832 |
INTERSTATE MECHANICAL, INC. | PTO | C | 10/12/2018 | Ok for plumbing top out, images uploaded from contractor. Note: to final need drinking fountain and pvb added to scope. | DANR | DANR | | PTO | C | 5992826 |
INTERSTATE MECHANICAL, INC. | P= | P | 09/28/2018 | Need PTO completed to final out, need drinking fountain and pvb added to scope, hand sink and drinking fountain install ok. | DANR | DANR | | P= | P | 5980100 |
INTERSTATE MECHANICAL, INC. | PTO | P | 09/28/2018 | ADD DRINKING FOUNTAIN AND PVB TO SCOPE OF WORK, need engineer approval for pvb move in cooler (20FT West), need hanger support on venting behind cooler, need hangers domestic water in ceiling above hand sink, pictures uploaded to next inspection ok for hangers. | DANR | DANR | | PTO | P | 5980093 |
INTERSTATE MECHANICAL, INC. | PB | C | 08/29/2018 | Ok for grocery area floor drains. | DANR | DANR | | PB | C | 5949284 |
INTERSTATE MECHANICAL, INC. | PTO | P | 08/28/2018 | Ok for in wall dwv and domestic water in wall for hand sink produce cooler, add drinking fountain to scope of work. | DANR | DANR | | PTO | P | 5948023 |
INTERSTATE MECHANICAL, INC. | PB | P | 08/20/2018 | Ok for dwv garage drinking fountain. | DANR | DANR | | PB | P | 5939299 |
INTERSTATE MECHANICAL, INC. | PTO | P | 08/20/2018 | inspection for drinking fountain garage dwv and domestic water, need engineer approval for aav. | DANR | DANR | | PTO | P | 5939291 |
INTERSTATE MECHANICAL, INC. | PB | P | 08/09/2018 | Underground produce cooler ok. | DANR | DANR | | PB | P | 5929017 |
INTERSTATE MECHANICAL, INC. | PB | P | 08/08/2018 | Ok for underground produce shopping cooler except East floor drain needs vent. | DANR | DANR | | PB | P | 5927578 |