MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 03/19/2019 | corrections from previous inspection are okay | BRIANB | BRIANB | | B= | C | 6137037 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 03/04/2019 | break room sink measures 36" off of the finished floor where 34" is required -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 6123664 |
MAHLER GC GENERAL CONTRACTING COMPANY | BSP | P | 01/16/2019 | training with Brian B -- reviewed type IIB construction -- reviewed accessible elements for employee break room sink per 2003 ANSI 606 | SCOTTS | SCOTTS | | BSP | P | 6080266 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 01/16/2019 | need to attach plumbing to permit and complete other rough inspections / observed light gauge wall framing at new exam rooms / discussed accessible elements with the site rep / Training with PPRBD inspector Scott / IIB construction - B occupancy - accessible elements at break room | BRIANB | BRIANB | | BFR | P | 6080262 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 03/01/2019 | | RANDY | RANDY | | E= | C | 6123034 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 01/17/2019 | see plans for new work at final | RANDY | RANDY | | ER | P | 6081735 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 09/25/2018 | phase 1 and 2 ok | RANDY | RANDY | | ER | P | 5976280 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 02/27/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES | BILLS | BILLS | | H= | C | 6118472 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 02/06/2019 | PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6099725 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 09/06/2018 | ROOM # 100,101 - ABOVE CEILING DUCT ROUGH OK / SUPPLY GRILLS FINAL CONNECTIONS OK /RETURN LAY IN REGISTERS IN PLACE | LIDO | LIDO | | HD | P | 5956662 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 02/26/2019 | interior remodel | TED | TED | | P= | C | 6117476 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 02/22/2019 | ceiling and tie ins ok | TED | TED | | PTO | C | 6114341 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 02/22/2019 | still need to complete break room sink, rest ok | TED | TED | | P= | P | 6114330 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | P | 01/25/2019 | in walls dvw and water ok to cover | TED | TED | | PTO | P | 6088626 |
MAHLER GC GENERAL CONTRACTING COMPANY | XPS | T | 11/21/2018 | PAID (REC#1558221) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-21-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6033013 |