CROSSLAND CONSTRUCTION COMPANY, INC. | B= | C | 12/09/2019 | | BRIANB | BRIANB | | B= | C | 6420313 |
CROSSLAND CONSTRUCTION COMPANY, INC. | B= | P | 10/31/2019 | Temp CO: Per Matt M ok to extend for fee ( Expires: 11/30/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6384330 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | R | 10/03/2019 | observation letter for reinforcement at retaining wall uploaded to inspection request - address needs to reference permitted address for retaining wall and uploaded to retaining wall permit | BRIANB | BRIANB | | BSP | R | 6356160 |
CROSSLAND CONSTRUCTION COMPANY, INC. | B= | P | 10/01/2019 | Temp CO: Pending zoning final ( Expires: 10/31/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6354055 |
CROSSLAND CONSTRUCTION COMPANY, INC. | B= | P | 10/01/2019 | pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BRIANB | BRIANB | | B= | P | 6353898 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 10/01/2019 | received stamped observation letter for structural steel - red iron and observation letter for welding and bolting | BRIANB | BRIANB | | BFR | P | 6353897 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BBB | C | 10/01/2019 | masonry observation letter from A.G. Wassenar received onsite | BRIANB | BRIANB | | BBB | C | 6353533 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFN | C | 10/01/2019 | Engineer letter for foundation received | BRIANB | BRIANB | | BFN | C | 6353484 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFT | C | 10/01/2019 | Engineer letter for footing on file -- Open hole on file | BRIANB | BRIANB | | BFT | C | 6353479 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2019 | COURTESY WALK FOR FINAL ONLY / discussed needing to complete head of wall and penetrations at all stair tower CMU fire barriers / discussed needing open excavation letter and all observation letters to complete foundation - bond beam - structural steel inspections with permitted address referenced in observation letters / walked through building and went over accessible elements and means of egress components / courtesy walk only - still need to complete building final inspection | BRIANB | BRIANB | | BSP | P | 6349672 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2019 | observed mineral wool at elevator shaft head of wall and grout at shaft penetrations / received stamped detail (detail 5 on sheet A9.3) for shaft head of wall | BRIANB | BRIANB | | BSP | P | 6349639 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | R | 09/11/2019 | ELEVATOR SHAFT INSPECTION / all towers - grout incomplete at penetrations - joints in CMU at - around hoistway doors / need head of wall detail for for top of shaft walls and inspected / note - 1hr fire barrier (U 905) at towers | BRIANB | BRIANB | | BSP | R | 6331257 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 07/26/2019 | PARTIAL / remaining 3rd floor units only - grid lines A to B - 1 to 2 / observed stl wall framing for 3rd floor units / discussed accessible elements with the site reps / still need to inspect new through penetration(s) at 1hr fire barrier (U 905) at stair towers and penetrations in floor-ceiling / observation letter for structural steel, welding - bolting from A.G Wassenaar to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6278727 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 07/22/2019 | PARTIAL / 3rd floor units only - grid lines A to D - 4 to 2 / observed stl wall framing for 3rd floor units / discussed accessible elements with the site reps / observed fire caulk at through penetration(s) at 1hr fire barrier (U 905) at stair towers / observation letter for structural steel, welding - bolting from A.G Wassenaar to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6272308 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 06/25/2019 | PARTIAL / 2nd floor units only - grid lines A to B - 4 to1 to 1.7 / observed stl wall framing for remaining 2nd floor units / discussed accessible elements with the site reps / discussed (IBC 714.3.1) inspections for through penetration at 1hr fire barrier (U 905) at stair towers/ also went over IBC 714.5 penetrations at nonfire - resistance rated assemblies / observation letter for structural steel, welding - bolting from A.G Wassenaar to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6243522 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 06/21/2019 | PARTIAL / 2nd floor units only - grid lines D to A - 4 to1.7 on sheet A1.2 / observed stl wall framing for 2nd floor units / discussed accessible elements with the site reps / observation letter for structural steel, welding - bolting from A.G Wassenaar to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6239670 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 06/18/2019 | PARTIAL / main floor units only - grid lines A.3 to A - 4 to 1 / observed stl wall framing for remaining main floor units and corrections from previous BFR inspection dated 17MAY19 / discussed accessible elements with the site reps / observation letter for structural steel, welding - bolting from A.G Wassenaar to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6235627 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 05/17/2019 | PARTIAL / main floor units - restrooms - break room - sales - electrical room on sheet A1.0 gird lines 2.3 to 1.4 - B to A.3 / wall framing incomplete at restrooms / observed stl wall framing at units / discussed accessible elements with the site superintendent / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6203625 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFR | P | 04/25/2019 | PARTIAL / main floor units - sheet A1.0 gird lines 2.3 to 4 - D to B / observed stl wall framing at units / discussed accessible elements with the site superintendent | BRIANB | BRIANB | | BFR | P | 6178465 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | P | 04/16/2019 | courtesy visit / met with Crossland superintendent Bud / reviewed approved design onsite and discussed required inspections for project, including bond beam, frame and thermal envelope / also discussed 3rd party inspections by the engineer for structural components - structural steel, welding, bolting / reviewed CMU 1hr rated assemblies (UL U905) for shafts at elevator and stairs / changed inspection from BBB to BSP | BRIANB | BRIANB | | BSP | P | 6167758 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | P | 03/28/2019 | courtesy visit / met with Crossland superintendent Bud / reviewed approved design onsite and discussed required inspections for project, including bond beam, frame and thermal envelope / also discussed 3rd party inspections by the engineer for structural components - structural steel, welding, bolting / at time of visit approximately 50% cmu masonry walls have been completed prior to RBD inspection (per superintendent - will schedule RBD inspections next week for next bond beam) / foundation components complete prior to RBD inspectons at time of visit as well | BRIANB | BRIANB | | BSP | P | 6147906 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BSP | P | 03/01/2019 | courtesy visit / met with Crossland superintendent Bud / reviewed approved design onsite and discussed required inspections for project, including bond beam, frame and thermal envelope / also discussed 3rd party inspections by the engineer for structural components - structural steel, welding, bolting | BRIANB | BRIANB | | BSP | P | 6121731 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BBB | P | 03/01/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from AG Wassenar for bond beam completed prior to inspection to follow | BRIANB | BRIANB | | BBB | P | 6121725 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFI | P | 01/25/2019 | AUTHORIZED INSPECTION BY ENGINEER / Courtesy Visit - met with project manager Clint - observation letter from Terracon for foundation insulation to follow / updated 10/1 - inspection not required see approved ComCheck | BRIANB | BRIANB | | BFI | P | 6088308 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFN | P | 01/25/2019 | AUTHORIZED INSPECTION BY ENGINEER / Courtesy Visit - met with project manager Clint - observation letter from Terracon for foundation to follow | BRIANB | BRIANB | | BFN | P | 6088307 |
CROSSLAND CONSTRUCTION COMPANY, INC. | BFT | P | 01/25/2019 | AUTHORIZED INSPECTION BY ENGINEER / Courtesy Visit - met with project manager Clint - observation letter from Terracon for footings to follow | BRIANB | BRIANB | | BFT | P | 6088292 |
CROSSLAND CONSTRUCTION COMPANY, INC. | B16 | P | 09/05/2018 | Site meeting with Bud Howard (Crossland superintendent) - discussed project scope, inspection requirements, external agencies (fire, engineering, utilities) and timeline | RICHB | RICHB | | B16 | P | 5956023 |
CROSSLAND CONSTRUCTION COMPANY, INC. | B16 | R | 09/04/2018 | Field cancelled via phone call with Contractor (Bud) - rescheduled for tomorrow | RICHB | RICHB | | B16 | R | 5954550 |
WINTERS ELECTRIC, INC. | E= | C | 09/18/2019 | Electrical complete / | ROB | ROB | | E= | C | 6339210 |
WINTERS ELECTRIC, INC. | E= | P | 09/16/2019 | Need to verify heating pads protection / Need ground fault protection per installation manual / | ROB | ROB | | E= | P | 6336715 |
WINTERS ELECTRIC, INC. | E= | P | 09/11/2019 | Need to verify GFCI for snowmelt / Rest of electrical complete / | ROB | ROB | | E= | P | 6332218 |
WINTERS ELECTRIC, INC. | E= | P | 09/10/2019 | Rest of 3rd level complete with the exception of show windows / CU's, sign j boxes on roof ok / NOTE: Need to look at GFCI protection for heat trace mats / | ROB | ROB | | E= | P | 6330472 |
PHOENIX FIRE AND SECURITY, LLC | E= | C | 09/09/2019 | FIRE ALARM INSPECTION: Fire Alarm complete / | ROB | ROB | | E= | C | 6328913 |
WINTERS ELECTRIC, INC. | E= | P | 09/09/2019 | Loading dock, SW stair, 3rd level east side, Pole lights complete / | ROB | ROB | | E= | P | 6328909 |
PHOENIX FIRE AND SECURITY, LLC | ER | C | 09/06/2019 | FIRE ALARM INSPECTION: Rough complete / | ROB | ROB | | ER | C | 6327334 |
PHOENIX FIRE AND SECURITY, LLC | E= | P | 09/06/2019 | FIRE ALARM INSPECTION: Verify mounting of heat detectors in elevator pit / | ROB | ROB | | E= | P | 6327330 |
WINTERS ELECTRIC, INC. | ER | P | 09/06/2019 | Rough ok for break room ceiling / | ROB | ROB | | ER | P | 6327317 |
WINTERS ELECTRIC, INC. | E= | P | 09/06/2019 | 2nd level, North and East Stairs, Break Room, Office complete / | ROB | ROB | | E= | P | 6327313 |
WINTERS ELECTRIC, INC. | E= | P | 09/05/2019 | Rest of 1st level storage and corridors ok, Data room and Riser room ok / | ROB | ROB | | E= | P | 6325375 |
WINTERS ELECTRIC, INC. | E= | P | 09/04/2019 | west half and north corridor on 1st level complete / | ROB | ROB | | E= | P | 6323937 |
WINTERS ELECTRIC, INC. | EUG | P | 08/08/2019 | 4 south pole bases OK | CRAIGS | CRAIGS | | EUG | P | 6293087 |
WINTERS ELECTRIC, INC. | ER | P | 07/25/2019 | Rough ok for walls and ceilings in 2 1st level bathrooms, walls in breakroom, walls in office area, and walls and ceiling in 1 2nd level bathroom / Went over ADA requirements / | ROB | ROB | | ER | P | 6277219 |
WINTERS ELECTRIC, INC. | EUG | P | 07/23/2019 | EUG ok for PVC to pole lights / | ROB | ROB | | EUG | P | 6274030 |
WINTERS ELECTRIC, INC. | ER | P | 02/25/2019 | ufer OK----- 5 breakers installed at time of inspection | CRAIGS | CRAIGS | | ER | P | 6116221 |
WINTERS ELECTRIC, INC. | ES | C | 02/25/2019 | Commercial Service: 600 amp 4/w 480 volt ---OK to set CT'S and energize -- correction from 400 to 600 amps done by craigs 2/27/2019 | CRAIGS | CRAIGS | | ES | C | 6116216 |
WINTERS ELECTRIC, INC. | EUG | P | 10/30/2018 | EUG for pipes on ESL that were o/s of building / | ROB | ROB | | EUG | P | 6010883 |
WINTERS ELECTRIC, INC. | ESL | P | 10/30/2018 | 2-4" comm. and 1" from Elevator 2 to appx 10' outside of Bldg.----3-21/2" and 2-1" from SES to Elevator #1 area / | ROB | ROB | | ESL | P | 6010879 |
OTIS ELEVATOR COMPANY | HE= | C | 09/27/2019 | ELEVATORS COMPLETE | ROBERTV | ROBERTV | | HE= | C | 6350531 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | C | 09/17/2019 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6337492 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/16/2019 | PARTIAL PENDING: PLAN SPLICE WILL NEED TO BE RE - SUBMITTED . ALL CHANGE TO BE CLOUDED AND ALL FLOORS INCLUDED. | LIDO | LIDO | | H= | P | 6335711 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/13/2019 | PARTIAL PENDING : NEED MECHANICAL SPLICES REFER TO PREVIOUS NOTES. | LIDO | LIDO | | H= | P | 6335236 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/12/2019 | STILL NEED MECHANICAL SPLICES REFER TO PREVIOUS NOTES . NEED TO RESEARCH SPLICE DETAIL FOR REFRIGERATION LINES PENETRATING THROUGH ROOF WEATHER HOOD. EH-1 IN RISER ROOM IS MISSING THE LINE VOLTAGE THERMOSTAT . REST OF ELECTRIC UNIT HEATERS OK. ROOF OK. | LIDO | LIDO | | H= | P | 6333440 |
OTIS ELEVATOR COMPANY | HE= | P | 09/12/2019 | (ELEVATORS #1 AND #2) - NEED TO REMOVE PENETRATING SCREWS AT ROOF DECK ATOP HOISTWAY. NEED TO COMPLETE FIRE RATING OF SHAFT PER BUILDING INSPECTOR. NEED APPROVAL FROM CSFD FOR ELEVATOR. ---- USE PERMITTED FOR ATTENDANT OPERATION ONLY. | ROBERTV | ROBERTV | | HE= | P | 6333083 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/11/2019 | 1ST FLOOR HEAT FINAL : NEED REVISED AND APPROVED PLANS FOR MECHANICAL AND ELECTRICAL FOR 1- ADDED CONDENSATE PUMP FOR ALL FURNACES . REST OK . | LIDO | LIDO | | H= | P | 6332098 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/10/2019 | 1ST FLOOR HEAT FINAL : FC-1-9 AND FC-1-10 NEED GROMMET FOR GAS PIPE PENETRATION INTO FURNACE CABINET. FC-1-8 VENT IS NOT CONNECTED TO FURNACE / REST OK . FC-1-2, 1-3, 1-4, 1-6, 1-7 NEED REVISED/ APPROVED PLANS FOR ADDED CONDENSATE PUMP AT EACH FURNACE. REST OK . ((STILL NEED FC-1-1 AND FC-1-5 . )) | LIDO | LIDO | | H= | P | 6330164 |
COLORADO MECHANICAL SYSTEMS, LLC | HSP | P | 09/10/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 6329165 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/09/2019 | 2ND FLOOR HEAT FINAL - NEED REVISED / APPROVED PLANS / REFER TO PREVIOUS NOTES - REST OK. 3RD FLOOR HEAT FINAL - NEED REVISED / APPROVED PLANS / REFER TO PREVIOUS / STILL NEED FC-3-2 AND 3-5 - REST OK. | LIDO | LIDO | | H= | P | 6328712 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/06/2019 | 2ND FLOOR HEAT FINAL : FLU VENT CONNECTION AT THE FURNACES ARE NOT SECURE / RE-INSPECT ALL FURNACE VENT CONNECTION AT THE FURNACE. FC-2-3, 2-4, 2-6 - NEED REVISED AND APPROVED PLANS FOR 1- ADDED CONDENSATE PUMP AT EACH FURNACE FOR MECHANICAL AND ELECTRICAL . BRING LINE SET INSULATION ALL THE WAY TO THE COIL / INSTALL GROMMET ON GAS LINE GOING THROUGH ALL FURNACE CABINETS AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35 / NEED TO PROTECT LOW VOLTAGE WIRES PENETRATING ALL FURNACE CABINETS. FC-2-5 - NEED REVISED AND APPROVED PLANS FOR 1- ADDED CONDENSATE PUMP AT FURNACE AND 1- ADDED PUMP STATION IN CORRIDOR FOR MECHANICAL AND ELECTRICAL. BRING LINE SET INSULATION ALL THE WAY TO THE COIL / INSTALL GROMMET ON GAS LINE GOING THROUGH ALL FURNACE CABINETS AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35 / NEED TO PROTECT LOW VOLTAGE WIRES PENETRATING ALL FURNACE CABINETS.
| LIDO | LIDO | | H= | P | 6327120 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/06/2019 | TEST AND BALANCE REPORT REVIEW ONLY : MISSING OUTSIDE AIR READINGS FOR FC-1-2 AND FC-1-3 | LIDO | LIDO | | H= | P | 6326003 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/05/2019 | NEED REVISED AND APPROVED PLANS FOR MECHANICAL AND ELECTRICAL FOR ALL ADDED CONDENSATE PUMPS AND CONDENSATE DRAIN LINE SIZE AND ROUTING CHANGES. 2ND FLOOR HEAT FINAL : FC-2-1 NEED REVISED/ APPROVED PLANS FOR 1- ADDED CONDENSATE PUMP AT FURNACE, 1- PUMP STATION FOR FC-3-1 AND FC-2-1 LOCATED ON SECOND FLOOR AND CONDENSATE PIPING MANIFOLDED IN 1" PVC TERMINATING AT MOP SINK ON 2ND FLOOR. F-2-1 BRING LINE SET INSULATION ALL THE WAY TO THE COIL / INSTALL GROMMET ON GAS LINE GOING THROUGH ALL FURNACE CABINETS AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35 / NEED TO PROTECT LOW VOLTAGE WIRES PENETRATING ALL FURNACE CABINETS. FC-2-2 : NEED REVISED/ APPROVED PLANS FOR 1- ADDED CONDENSATE PUMP AT FURNACE, (CONDENSATE TERMINATING AT MOP SINK ON 2ND FLOOR OK.) FC-2-2 BRING LINE SET INSULATION ALL THE WAY TO THE COIL / INSTALL GROMMET ON GAS LINE GOING THROUGH ALL FURNACE CABINETS AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35 / NEED TO PROTECT LOW VOLTAGE WIRES PENETRATING ALL FURNACE CABINETS. | LIDO | LIDO | | H= | P | 6325277 |
COLORADO MECHANICAL SYSTEMS, LLC | HSP | P | 09/05/2019 | NEED TO REVIEW TEST AND BALANCE REPORT RECEIVED. | LIDO | LIDO | | HSP | P | 6324562 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/04/2019 | 3RD FLOOR HEAT FINAL INSPECTION : INSTALL GROMMET ON GAS LINE GOING THROUGH ALL FURNACE CABINETS AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35 / NEED TO PROTECT LOW VOLTAGE WIRES PENETRATING ALL FURNACE CABINETS. (( NEED REVISED AND APPROVED PLANS FOR MECHANICAL AND ELECTRICAL FOR ALL ADDED CONDENSATE PUMPS LISTED )) FC-3-2 - ONE CONDENSATE PUMP INSTALLED NOT SHOWN ON PLANS / PUMP INSTALL IS NOT COMPLETE , BRING LINE SET INSULATION ALL THE WAY TO THE COIL. FC-3-1, FC-3-3, FC-3-4, FC-3-5, FC-3-6 ONE CONDENSATE PUMP INSTALLED ON EACH LISTED FURNACE NOT SHOWN ON PLANS. BRING LINE SET INSULATION ALL THE WAY TO THE COIL . STILL NEED TO SEE WHERE THE CONDENSATE IS TERMINATING. NEED ELECTRIC HEATERS IN STAIR WELLS INSPECTED. REST OK . (ALL LINE SET INSTALL THROUGH 3RD FLOOR FOR SECOND FLOOR OK / STILL NEED 2ND AND 1ST FLOOR HEAT FINAL INSPECTION INCLUDING FURNACES, LINE SETS, CONDENSATE DISPOSAL.STAIR WELLS ) | LIDO | LIDO | | H= | P | 6323796 |
OTIS ELEVATOR COMPANY | HE | P | 09/04/2019 | Renewed for No Fee at 9/4/2019 11:27:34 AM | ERIC | ERIC | | HE | P | 6323362 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 09/03/2019 | FOR ALL UNITS REMOVE PLUG FROM SECONDARY DRAIN PAN TO MEET CODE FOR SECONDARY DRAINS. FCU 1-9 AND 1-10: INSTALLED AS PER PLAN. DUCTS, VENTS ALL OK. | NANCY | NANCY | | H= | P | 6322270 |
COLORADO MECHANICAL SYSTEMS, LLC | HI | C | 09/03/2019 | TO COMPLETE GAS INSTALL GROMMET ON GAS LINE GOING THROUGH FURNACE CABINET AS PER MANUFACTURER'S INSTRUCTIONS, SEE PAGE 35. CONNECTIONS TO ALL EQUIPMENT ON FIRST FLOOR OK. INSTALLED AS PER SPLICE. | NANCY | NANCY | | HI | C | 6322264 |
COLORADO MECHANICAL SYSTEMS, LLC | HC | C | 08/30/2019 | OK TO RELEASE METER . | LIDO | LIDO | | HC | C | 6321062 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 08/29/2019 | AFTER FURTHER REVIEW 2ND FLOOR FURNACE VENT CLEARANCE TO AN OUTSIDE AIR IS NOT AN ISSUE / THE LOUVER THAT WAS IN QUESTION IS AN EXHAUST TERMINATION. | LIDO | LIDO | | HV | P | 6318294 |
COLORADO MECHANICAL SYSTEMS, LLC | HWP | P | 08/28/2019 | ((NEED TO RESEARCH VENT CLEARANCE FOR MECHANICAL OUTSIDE AIR.)) NEED REVISED AND APPROVED PLANS FOR ALL CONDENSATE CHANGES FOR ROUTING , SIZE CHANGES AND ADDED CONDENSATE PUMPS . ((1ST FLOOR FC-1-5 CONDENSATE DISPOSAL - NEED REVISED AND APPROVED PLANS FOR TWO ADDED CONDENSATE PUMPS / CONDENSATE DRAIN PIPING INSTALLED PER PLAN.)) | LIDO | LIDO | | HWP | P | 6317405 |
COLORADO MECHANICAL SYSTEMS, LLC | HRP | P | 08/26/2019 | 400 LB TEST ON LINE SET FOR CONDENSER CU-2-5 OK. | LIDO | LIDO | | HRP | P | 6313965 |
COLORADO MECHANICAL SYSTEMS, LLC | HRP | P | 08/23/2019 | (( 2-5 CONDENSER LINE SET IS PEGGED ON THE GAUGE / NEED TO RE-TEST.)) 21- 400 LB TEST FOR CONDENSER LINE SETS OK. NEED TO COMPLETE LINE SET INSULATION FOR LINE SET INSTALL INSPECTION . | LIDO | LIDO | | HRP | P | 6312762 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 08/16/2019 | 3RD FLOOR : FC-3-4 - VENT AND INTAKE OK. VENT AND INTAKE FOR ALL 3RD FLOOR FURNACES OK. | LIDO | LIDO | | HV | P | 6304212 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 08/09/2019 | 3rd FLOOR FURNACE VENTS: FC-3-4 - INTAKE IS BACK GRADING. FC-3-1, 3-2, 3-3, 3-5, 3-6 OK | LIDO | LIDO | | HV | P | 6295452 |
COLORADO MECHANICAL SYSTEMS, LLC | HI | P | 08/07/2019 | 2ND FLOOR AND 3RD FLOOR : 60 lb TEST OK / GAS INSTALLED PER PLAN ALL GAS FINAL CONNECTIONS TO EQUIPMENT OK. | LIDO | LIDO | | HI | P | 6291994 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 08/05/2019 | 3RD FLOOR : MULTIPLE VENTS AND INTAKES ARE BACK GRADING / NEED TO SEAL INTAKE CONNECTION TO FURNACE BOX WITH APPROVED SEALANT. ( NEED TO RE-INSPECT ALL VENTS AND INTAKES) | LIDO | LIDO | | HV | P | 6288541 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 08/05/2019 | 3RD FLOOR : FC-3-1, 3-3, 3-4, 3-5, 3-6 DUCT ROUGH OK / GRILLS INSTALLED. | LIDO | LIDO | | HD | P | 6288533 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 08/01/2019 | 3RD FLOOR ABOVE CEILING DUCT ROUGH :FC-3-1 - SUPPLY, RETURN AND OUTSIDE AIR OK / OK TO WRAP / STILL NEED FINAL CONNECTION TO FURNACE. FC-3-2 , FC-3-3 - SUPPLY, RETURN AND OUTSIDE AIR OK / OK TO WRAP / STILL NEED FINAL CONNECTION TO FURNACE AND OFFSET INSTALLED. FC-3-4. FC-3-5, FC-3-6 - SUPPLY, RETURN AND OUTSIDE AIR OK / OK TO WRAP / STILL NEED FINAL CONNECTION TO FURNACE. (( STILL NEED FURNACE AND VENT INSPECTION.)) | LIDO | LIDO | | HD | P | 6285560 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 07/25/2019 | BDA (143) M 2.2: EXHAUST AND SUPPLY ABOVE CEILING IN UNISEX BATHROOM OK, BDA (142) M 2.1: EXHAUST DUCT IN INTERNAL LOADING ROOM 107 OK, BDA (141) M 2.0: EXHAUST AND SUPPLY ABOVE CEILING IN MENS AND WOMENS BATHROOM 111 AND 112 OK | BENH | BENH | | HD | P | 6277146 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 07/25/2019 | BDA(143) M 2.2: FC-2-3 VENT OK, BDA (144) FC-2-1 AND 2-5 VENTS OK | BENH | BENH | | HV | P | 6277135 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 07/24/2019 | 2ND FLOOR :FC-2-2 , FC-2-4, FC-2-6 -FURNACE VENTS OK. | LIDO | LIDO | | HV | P | 6275449 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 07/24/2019 | 2ND FLOOR PLAN PAGE M2.2 ( BDA143) : FC-2-2 - DUCT ROUGH AND GRILLS OK, OUTSIDE AIR OK TO WRAP. FC-2-3 - DUCT ROUGH AND GRILLS OK ,OUTSIDE AIR OK TO WRAP. FC-2-4 MISSING TWO 18 X 10 SUPPLY TAPS , OUTSIDE AIR OK TO WRAP. FC-2-6 - THERE IS A NOTE # 6 THAT SHOWS A EXHAUST FAN , NO FAN IS INSTALLED AND WHY DOES IT SHOW AN EXHAUST FAN ? / IF THIS IS THE WRONG NOTE REVISE PLAN PAGE TO SHOW THE CORRECT NOTE.. DUCT ROUGH OK | LIDO | LIDO | | HD | P | 6275444 |
COLORADO MECHANICAL SYSTEMS, LLC | HI | P | 07/23/2019 | 2ND FLOOR GAS PIPE INSPECTION : NEED 60lb TEST FOR WELDED GAS PIPE. 3/4" IN GAS INSTALLED TO FC-2-1 , PLAN SHOWS 1-1/4". INSTALL PER PLAN OR REVISED / APPROVED PLANS WILL BE NEEDED.(( REST OF INSTALL AND FINAL CONNECTIONS TO EQUIPMENT OK . )) | LIDO | LIDO | | HI | P | 6273670 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 06/18/2019 | DUCT WRAP ON ALL FIRST FLOOR SUPPLY AND OUTSIDE AIR DUCTING OK. (EXCEPT FOR LOADING DOCK) | BILLS | BILLS | | HD | P | 6235799 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 06/18/2019 | NEED PLAN SPLICE FOR RELOCATED FURNACE INTAKE AND EXHAUST VENTING THAT GO FROM FIRST FLOOR TO TERMINATE ON THE SECOND FLOOR. (1-1, 1-2, 1-6, AND 1-8). THE REST OF THE VENTS ARE OK (1-3, 1-4, 1-5, AND 1-7) | BILLS | BILLS | | HV | P | 6235797 |
COLORADO MECHANICAL SYSTEMS, LLC | HI | P | 05/16/2019 | NEW ENGINEERED GAS PLANS HAVE BEEN SUBMITTED, WILL REQUIRE ANOTHER ON SITE INSPECTION FOR 1ST FLOOR GAS ONCE THE NEW PLANS HAVE BEEN APPROVED AND ATTACHED | BILLS | BILLS | | HI | P | 6201995 |
COLORADO MECHANICAL SYSTEMS, LLC | HV | P | 04/24/2019 | FC 1-3 AND FC 1-4 FURNACE VENTING OK (CONCENTRIC VENTING) | BILLS | BILLS | | HV | P | 6177225 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 04/24/2019 | FC 1-2 DUCTS INSTALLED AS PER RFI 033, WILL NEED REVISED APPROVED PLANS FOR CHANGING DUCT WORK FROM ROUND TO SQUARE. | BILLS | BILLS | | HD | P | 6177220 |
COLORADO MECHANICAL SYSTEMS, LLC | HI | P | 04/09/2019 | 1ST FLOOR :M3.1 ( BDA150) 3/4" GAS INSTALLED FOR FC-1-1 IS TAPPING OFF THE 3" MAIN , PLAN SHOWS THIS TO TAP OFF THE 4" - INSTALL PER PLAN OR HAVE PLANS REVISED AND APPROVED . 1ST FLOOR : M3.0 ( BDA149) 1" GAS RAN TO FC-1-2 , PLAN SHOWS 1 1/4" TO BE RAN TO FC-1-2 - INSTALL PER PLAN OR HAVE PLANS REVISED AND APPROVED . 1ST FLOOR : 60 POUND TEST OK. | LIDO | LIDO | | HI | P | 6160796 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 04/08/2019 | 1ST FLOOR PLAN PAGE M2.0 ( BDA 141) FC-1-2 PLAN SHOWS 18" ROUND TO BE INSTALLED ,14 X 14 ( ID) INSTALLED , THE SQUARE INCHES ARE 58 SQUARE INCHES LESS THAN THE 18" ,INSTALL PER PLAN OR WILL NEED A REVISED /APPROVED PLAN . ABOVE CEILING RETURN AND OUTSIDE AIR DUCT ROUGH OK / OK TO WRAP. FC-1.3 / FC-1.4 ABOVE CEILING SUPPLY, RETURN AND OUTSIDE AIR OK / OK TO WRAP. FC-1-7 / FC-1-8 ABOVE CEILING SUPPLY, RETURN ONLY OK / OK TO WRAP / STILL NEED OUTSIDE AIR. 1ST FLOOR PLAN PAGE M2.1 ( BDA 142) FC-1-6 ABOVE CEILING SUPPLY AND RETURN OK/ OK TO WRAP. FC-1-1 , FC-1-5 ABOVE CEILING SUPPLY, RETURN AND OUTSIDE AIR OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6159249 |
COLORADO MECHANICAL SYSTEMS, LLC | P= | C | 09/19/2019 | Corrections made. | SAMH | SAMH | | P= | C | 6341113 |
COLORADO MECHANICAL SYSTEMS, LLC | P= | P | 09/16/2019 | Need knee clearance at 2nd floor drinking fountain, Break room sink exceeds 34" height. Rest OK. | SAMH | SAMH | | P= | P | 6336303 |
COLORADO MECHANICAL SYSTEMS, LLC | P= | P | 09/11/2019 | Need trap guard at water entry floor drain, No water to 1st floor drinking fountain, and break room sink, Lacking knee clearance at 2nd floor drinking fountain, Locate flush levers to open side of toilet in 1st floor men's and 2nd floor restrooms, Break room sink height exceeds 34". | SAMH | SAMH | | P= | P | 6331726 |
COLORADO MECHANICAL SYSTEMS, LLC | P= | R | 09/09/2019 | No water to restrooms, Contractor not on site. | SAMH | SAMH | | P= | R | 6328364 |
COLORADO MECHANICAL SYSTEMS, LLC | PRD | P | 07/11/2019 | In wall through ceiling OK. | SAMH | SAMH | | PRD | P | 6260213 |
COLORADO MECHANICAL SYSTEMS, LLC | PB | C | 07/11/2019 | PVC approved. | SAMH | SAMH | | PB | C | 6260209 |
COLORADO MECHANICAL SYSTEMS, LLC | PTO | P | 07/11/2019 | Verify insulation, Nail protection, and sump discharge lines. Check mech room and water entry at final. | SAMH | SAMH | | PTO | P | 6260201 |
COLORADO MECHANICAL SYSTEMS, LLC | PB | R | 05/21/2019 | Nothing on test. | SAMH | SAMH | | PB | R | 6206285 |
COLORADO MECHANICAL SYSTEMS, LLC | PTO | P | 05/20/2019 | First floor DWV, and second floor in wall dwv OK. Check nail protection with in wall water inspection. Still need Engineers letter approving PVC. | SAMH | SAMH | | PTO | P | 6204634 |
COLORADO MECHANICAL SYSTEMS, LLC | PB | P | 11/08/2018 | need material change letter, pvc used, continue at own risk, note: test and design ok, copper main water line under footer into meter room | TED | TED | | PB | P | 6020466 |
OTIS ELEVATOR COMPANY | XMS | P | 09/16/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Condensate pumps and stations | JUSTINC | JUSTINC | | XMS | P | 6335921 |
OTIS ELEVATOR COMPANY | XMS | T | 09/13/2019 | PAID (REC#1633933) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to show note 7 and schedule revision | JUSTINC | JUSTINC | | XMS | T | 6334312 |
OTIS ELEVATOR COMPANY | XMS | P | 09/11/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 6331176 |
OTIS ELEVATOR COMPANY | XMS | P | 08/30/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised to indicate heaters at stairs with thermostat locations and condensate revisions | JUSTINC | JUSTINC | | XMS | P | 6319742 |
OTIS ELEVATOR COMPANY | XMS | T | 07/29/2019 | PAID (REC#1619013) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas to 3/4" | JUSTINC | JUSTINC | | XMS | T | 6279605 |
COLORADO MECHANICAL SYSTEMS, LLC | XPS | T | 06/17/2019 | PAID (REC#1607058) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 6/17/19: Delta 9 revision schedule 40 PVC soil, waste, and vent piping | SHANEN | SHANEN | | XPS | T | 6233823 |
CROSSLAND CONSTRUCTION COMPANY, INC. | XBS | T | 06/06/2019 | PAID (REC#1607057) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise openings at room 107 | MICHAELA | MICHAELA | | XBS | T | 6223230 |
OTIS ELEVATOR COMPANY | XMS | T | 05/13/2019 | PAID (REC#1607059) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas and condensate | JUSTINC | JUSTINC | | XMS | T | 6196603 |
OTIS ELEVATOR COMPANY | XMS | T | 04/30/2019 | PAID (REC#1607059) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Delta 7 condensate revisions | JUSTINC | JUSTINC | | XMS | T | 6182251 |