WEEKLEY HOMES LLC | B= | C | 02/06/2019 | | NICK | NICK | | B= | C | 6099702 |
WEEKLEY HOMES LLC | B= | P | 02/04/2019 | Need to finish installing all ridge cap shingles for roof / All other aspects of final OK / Finished basement -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection UWS by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NICK | NICK | | B= | P | 6096780 |
WEEKLEY HOMES LLC | BIN | C | 02/04/2019 | 3rd Party Insulation Certificate on file / | NATHAN | NATHAN | | BIN | C | 6096147 |
WEEKLEY HOMES LLC | BSP | P | 12/17/2018 | Back porch and deck post framing OK | NICK | NICK | | BSP | P | 6055177 |
WEEKLEY HOMES LLC | BFR | C | 12/13/2018 | All frame items completed | NICK | NICK | | BFR | C | 6051739 |
WEEKLEY HOMES LLC | BSP | T | 12/12/2018 | PAID (REC#1563180): Inspection for back porch posts / Need to install CS18 straps from bottom post to upper posts with 10" lap for both posts per approved plans / Post caps for upper back porch OK / Still need foundation drain observation report / Still need frame complete | NICK | NICK | | BSP | T | 6051028 |
WEEKLEY HOMES LLC | BFR | P | 11/27/2018 | Need to complete dry in of roof / Need to remove temporary post for steel beam / Need to install bolts for beam to beam connection / Need to remove wood from beam pocket / OK to insulate / Still need 3rd party observation report for drain | NICK | NICK | | BFR | P | 6035214 |
WEEKLEY HOMES LLC | BIN | P | 11/26/2018 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6034446 |
WEEKLEY HOMES LLC | BSP | P | 10/30/2018 | Inspection for porches / Need to install posts for back porch / Need to inspect all post hardware for back porch / Front porch lid and posts OK / Back porch lid OK / Still need 3rd party observation for foundation drain | NICK | NICK | | BSP | P | 6010728 |
WEEKLEY HOMES LLC | BSP | P | 10/22/2018 | sheer per detail 4 and note 1 for rear garage wall. | NATHAN | NATHAN | | BSP | P | 6002505 |
WEEKLEY HOMES LLC | BFN | C | 10/22/2018 | drain not inspected =======all foundation paperwork on file | NATHAN | NATHAN | | BFN | C | 6001281 |
WEEKLEY HOMES LLC | BFT | C | 10/22/2018 | Engineer letter for footing on file -- Open hole on file / Soils report on file / | NATHAN | NATHAN | | BFT | C | 6001278 |
WEEKLEY HOMES LLC | BSP | P | 10/22/2018 | foundation plan attached | NATHAN | NATHAN | | BSP | P | 6001276 |
WEEKLEY HOMES LLC | BSP | R | 10/08/2018 | Open hole and 3rd party observation reports that were sent have wrong address. Letters are for 1251 Solitare, need letters for 1201 Lady Campbell dr / Thanks / Please re upload letter with correct address | NICK | NICK | | BSP | R | 5988154 |
WEEKLEY HOMES LLC | BFD | P | 09/17/2018 | Image of drain tie in to street on file / Still need all other Eng for footing/foundation/drain | NICK | NICK | | BFD | P | 5966473 |
WEEKLEY HOMES LLC | BFD | P | 09/05/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFD | P | 5955796 |
WEEKLEY HOMES LLC | BFT | P | 09/05/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFT | P | 5955795 |
WEEKLEY HOMES LLC | BFN | P | 09/05/2018 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFN | P | 5955794 |
PEAK ELECTRIC INC. | E= | C | 01/30/2019 | 25-amp A/C ok / | JOHNN | JOHNN | | E= | C | 6092050 |
PEAK ELECTRIC INC. | ER | C | 11/20/2018 | corrections made / | MIGUEL | MIGUEL | | ER | C | 6030500 |
PEAK ELECTRIC INC. | ES | C | 11/15/2018 | Residential Underground: 200A 3W new res ok to set meter / | MIGUEL | MIGUEL | | ES | C | 6027422 |
PEAK ELECTRIC INC. | ER | R | 11/15/2018 | repair outlet boxes at beam posts, top and bottom of stairs, travelers hanging in basement ceiling---- #8 AL to oven/range / 1 - #14 multiwire circuit / Finished Basement / No Cent Vac / NO Irreversible UFER connection / | MIGUEL | MIGUEL | | ER | R | 6027350 |
ATLANTIC HEATING & A/C INC | H= | C | 01/31/2019 | note: finished basement. louver door to mechanical room, high/low combustion air to mechanical room, outside air to furnace return with motorized damper. direct vent furnace, indirect vent water heater, a/c complete, received duct leakage report. | PAULO | PAULO | | H= | C | 6094261 |
ATLANTIC HEATING & A/C INC | H= | R | 01/29/2019 | duct leakage report has failed. Extend basement return air duct to finished ceiling height. Per page 29/30 of furnace manufacturers installation instructions condensate primary drain vent stack to terminate below secondary heat exchanger. Per page 25 Support furnace venting from structure as close to furnace as possible. Provide water heater installation instructions to verify proper screen within termination. Properly secure water heater condensate drain tubing at outlet. Still need duct leakage report. NOTES: Finished basement. Outside air to furnace return with motorized damper. Direct vent furnace. Louver door to mechanical room. A/C Complete. | PAULO | PAULO | | H= | R | 6090672 |
ATLANTIC HEATING & A/C INC | H= | P | 01/28/2019 | Extend basement return air duct to finished ceiling height. Per page 29/30 of furnace manufacturers installation instructions condensate primary drain vent stack to terminate below secondary heat exchanger. Per page 25 Support furnace venting from structure as close to furnace as possible. Provide water heater installation instructions to verify proper screen within termination. Properly secure water heater condensate drain tubing at outlet. Still need duct leakage report. NOTES: Finished basement. Outside air to furnace return with motorized damper. Direct vent furnace. Louver door to mechanical room. A/C Complete. | RANDYB | RANDYB | | H= | P | 6090182 |
ATLANTIC HEATING & A/C INC | HC | C | 11/26/2018 | RELEASE METER | PAULO | PAULO | | HC | C | 6033590 |
ATLANTIC HEATING & A/C INC | HRR | C | 11/26/2018 | NEEDED BY FINAL-- DUCT LEAKAGE REPORT. note: finished basement, outside air to return with motorized damper, direct vent furnace, indirect vent water heater, a/c rough and line set, received performance test, received change of equipment letter for furnace and coil. | PAULO | PAULO | | HRR | C | 6033578 |
ATLANTIC HEATING & A/C INC | HRR | T | 11/21/2018 | PAID (REC#1558367): not ready vent pipe on water heater is not primed or sealed | DAVIDH | DAVIDH | | HRR | T | 6032104 |
ATLANTIC HEATING & A/C INC | HRR | P | 11/19/2018 | Per page 33 Table 22 of water heater installation instructions: Water heater 3" venting does not meet minimum length requirement of 50 feet. Will need to use 2" venting. | RANDYB | RANDYB | | HRR | P | 6029736 |
ATLANTIC HEATING & A/C INC | HRR | P | 11/19/2018 | Performance test and Equipment change certificate has been accepted and attached to permit images. | RANDYB | RANDYB | | HRR | P | 6028974 |
ATLANTIC HEATING & A/C INC | HRR | P | 11/16/2018 | Will need water heater installation instructions to verify venting and termination. Need all ducting within attic insulated. BY FINAL: Need performance test. Duct leakage report. Coil installed does not match equipment listed on approved duct design. / Furnace installed does not match equipment listed on approved duct design. / Contractor must fill out the Equipment Change Form (Residential) and attach form to an inspection request by final. Form can be found on the PPRBD website under Downloads, Residential Handouts, Equipment Change Residential Duct Design. / NOTES: Finished basement. Outside air to furnace return with motorized damper. Direct vent furnace. A/C Rough coil and line-set. | RANDYB | RANDYB | | HRR | P | 6028236 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | C | 11/14/2018 | 10 LB TEST OK ,1 1/4 INCH MAIN , 1 FURNACE , 1 WATER HEATER | ANDREWP | ANDREWP | | HI | C | 6025036 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 01/24/2019 | Note: pvb installed | MALYNDA | MALYNDA | | P= | C | 6087478 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 11/16/2018 | Correction made, images received | SHANEN | SHANEN | | PTO | C | 6027438 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/15/2018 | Still need nail protection per previous notes, test OK, WAIVED TRIP FEE | SHANEN | SHANEN | | PTO | P | 6026341 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/14/2018 | DWV low test at powder room, need nail protection for 3" stack in basement closet and next to basement bathroom, rest OK, finished basement, irrigation, AAV basement lav | SHANEN | SHANEN | | PTO | P | 6024894 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 09/21/2018 | | MALYNDA | MALYNDA | | PB | C | 5972274 |