DANIEL-BARRY CONSTRUCTION INC | B= | C | 01/28/2019 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6089658 |
DANIEL-BARRY CONSTRUCTION INC | B= | P | 01/03/2019 | Stamped observation received / remodel OK pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6066962 |
DANIEL-BARRY CONSTRUCTION INC | B= | P | 12/28/2018 | Need to complete other Finals / need stamped copy of bolt/weld observation / Final OK otherwise -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6065272 |
DANIEL-BARRY CONSTRUCTION INC | BFN | C | 11/19/2018 | Formwork & reinforcement for slab infills OK per plans / discussed project scope | RICHB | RICHB | | BFN | C | 6029536 |
ENCORE ELECTRIC, INC. | E= | C | 01/22/2019 | plans spliced OK | CRAIGS | CRAIGS | | E= | C | 6083920 |
ENCORE ELECTRIC, INC. | E= | R | 01/18/2019 | need plans revised and run through plan review to be spliced in | CRAIGS | CRAIGS | | E= | R | 6082320 |
ENCORE ELECTRIC, INC. | E= | P | 12/26/2018 | need plans spliced to show the mau 1 is on a 3 pole 15 -- ef -2 is fed out of a different panel --- let me know that the splice is complete when you call for your next inspection | CRAIGS | CRAIGS | | E= | P | 6062993 |
ENCORE ELECTRIC, INC. | ER | C | 12/26/2018 | | CRAIGS | CRAIGS | | ER | C | 6062969 |
MECHONE, INC. | H= | C | 01/04/2019 | TEST AND BALANCE REPORT RECEIVED AND OTHER CORRECTIONS MADE | MARKB | MARKB | | H= | C | 6068195 |
MECHONE, INC. | H= | P | 12/27/2018 | FINAL PENDING - NEED TO COMPLETE GUARD RAIL FOR MUA UNIT, LABEL EQUIPMENT ON ROOF AND PROVIDE A TEST AND BALANCE REPORT. | MARKB | MARKB | | H= | P | 6064257 |
MECHONE, INC. | HD | C | 12/27/2018 | MAKEUP AIR AND EXHAUST DUCT PER PLAN. Training with Matt M. | MARKB | MARKB | | HD | C | 6064256 |
UTE PLUMBING & HEATING, INC | H= | C | 12/26/2018 | Training with Matt M. | MARKB | MARKB | | H= | C | 6063149 |
UTE PLUMBING & HEATING, INC | HC | C | 10/03/2018 | RELEASE METER FOR 2 LB SYSTEM THANKS | BENH | BENH | | HC | C | 5983847 |
UTE PLUMBING & HEATING, INC | HI | C | 10/03/2018 | BY FINAL NEED TO SEE NEW MAU CONNECTION, REGULATORS AND STENCILING ALREADY IN PLACE AND LETTER OF APPROVAL FOR 2 LB SYSTEM ALREADY ON FILE GAS INSTALLED PER PLAN 10 LB TEST OK, 3" MAIN, 2 BOILER, 2 MAU, 2 RTU, 1 REZNOR UNIT HEATER | BENH | BENH | | HI | C | 5983845 |
ENCORE ELECTRIC, INC. | XES | P | 02/01/2019 | PLAN SPLICE FEE: $0 by: SHELBY for Electrical: Revide panel G ( pool panel) schedule. | SHELBY | SHELBY | | XES | P | 6095621 |