GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | C | 02/15/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6109105 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 02/15/2019 | . Additional Inspections Required (computer generated): External Agency Inspection U= by CHEROKEEMETRO is not Completed yet (Contact: jsmith@cherokeemetro.org). | SCOTTS | SCOTTS | | B= | P | 6108228 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | B= | P | 02/14/2019 | provide roof warranty/ rest ok -- training with Trent -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection U= by CHEROKEEMETRO is not Completed yet (Contact: jsmith@cherokeemetro.org). | SCOTTS | SCOTTS | | B= | P | 6107331 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFT | C | 02/14/2019 | 3rd party summary letter on file -- training with Trent | SCOTTS | SCOTTS | | BFT | C | 6107316 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BIN | P | 01/29/2019 | exterior wall thermal installed per ComCheck | SCOTTS | SCOTTS | | BIN | P | 6090668 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 01/29/2019 | chase correction complete | SCOTTS | SCOTTS | | BFR | P | 6090665 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 01/28/2019 | correction not yet complete to chases | SCOTTS | SCOTTS | | BFR | P | 6089672 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 01/25/2019 | fireblocking of chases not per detail -- other frame corrections complete -- still need 3rd party observations -- discussed with Flint/GTC final inspections required to complete project | SCOTTS | SCOTTS | | BFR | P | 6088072 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 01/15/2019 | fireblock chases per detail -- block web and nail off kickers per detail -- provide blocking for ladder per detail -- complete other rough inspections | SCOTTS | SCOTTS | | BFR | P | 6078321 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | P | 12/12/2018 | partial frame inspection on roof and parapet -- observed placement HGA10 and HTS20 on roof deck to parapets/hardware installed per plan and manufacturer specifications | SCOTTS | SCOTTS | | BFR | P | 6050186 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 12/10/2018 | no inspection/not ready -- discussed details for parapet with Simpson hardware with job super | SCOTTS | SCOTTS | | BSP | P | 6047362 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 12/06/2018 | shear wall panel nailing complete/anchor bolts and hold downs at later inspection | SCOTTS | SCOTTS | | BSP | P | 6044665 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | R | 12/06/2018 | not ready for frame inspection/provide 3rd party summary for open hole/footing/foundation observations | SCOTTS | SCOTTS | | BFR | R | 6044660 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFR | R | 12/05/2018 | unable to make contact with jobsite representative/not on site/call ahead sent and physical call w/ no answer | SCOTTS | SCOTTS | | BFR | R | 6043185 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | R | 12/05/2018 | unable to make contact with jobsite representative/not on site/call ahead sent and physical call w/ no answer | SCOTTS | SCOTTS | | BSP | R | 6043182 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 11/30/2018 | shear wall nailing corrected -- hold downs and anchor bolts at later date | SCOTTS | SCOTTS | | BSP | P | 6040130 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | R | 11/29/2018 | previous shear corrections not completed | SCOTTS | SCOTTS | | BSP | R | 6037560 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | R | 11/28/2018 | shear wall nailing for S1 and S3 walls not per schedule/ hold downs not installed/ anchor bolts to be 12" from ends of plates and 32" oc for S1 walls and 24" oc for S3 walls | SCOTTS | SCOTTS | | BSP | R | 6036082 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BFI | P | 11/06/2018 | 2" R10 @ 28" | SCOTTS | SCOTTS | | BFI | P | 6016817 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | BSP | P | 11/02/2018 | met Flint w/Golden Triangle on site -- observed damp proofing on foundation/damp proofing ok -- reviewed 3rd party inspections/provide summary letter for observations -- obtain and attach mechanical and plumbing permits | SCOTTS | SCOTTS | | BSP | P | 6014016 |
ADVANCED ELECTRIC GROUP | E= | C | 01/28/2019 | E= OK ----- | GREGM | GREGM | | E= | C | 6089812 |
ADVANCED ELECTRIC GROUP | EUG | C | 01/23/2019 | trenches, and light poles okay | CHIPO | CHIPO | | EUG | C | 6085855 |
ADVANCED ELECTRIC GROUP | ES | C | 01/15/2019 | Commercial Service: 400 - amp 4 Wire New Commercial ok to set meter. / | CRAIG | CRAIG | | ES | C | 6078816 |
ADVANCED ELECTRIC GROUP | ER | P | 01/09/2019 | exterior walls up high | CRAIG | CRAIG | | ER | P | 6073686 |
ADVANCED ELECTRIC GROUP | ESL | C | 11/30/2018 | Interior slab complete | JOSEPH | JOSEPH | | ESL | C | 6039284 |
ADVANCED ELECTRIC GROUP | EUG | P | 11/26/2018 | north west corner for one pole light and south east side for 2 pole lights and ballards all 3/4" pvc | CRAIG | CRAIG | | EUG | P | 6034276 |
ADVANCED ELECTRIC GROUP | EUG | P | 11/20/2018 | 2 - 3/4" pvc for power -------- 3 - 1 1/2" pvc for data ---------- 2 - 2" pvc to rmc for building disconnect ------------- all on west side of building ok | CRAIG | CRAIG | | EUG | P | 6031711 |
ADVANCED ELECTRIC GROUP | ESL | P | 10/24/2018 | #2 bare Ufer okay | CHIPO | CHIPO | | ESL | P | 6005059 |
ANYTHING HVAC, LLC. | H= | C | 01/22/2019 | Contractors scope complete with RTU'S, Ladder, Smoke shutdown and thermostats. | MARKB | MARKB | | H= | C | 6085139 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 01/09/2019 | Core And Shell equipment hooked up to gas line. | MARKB | MARKB | | H= | C | 6073709 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 01/08/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6071813 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 01/08/2019 | 10 PSI PRESSURE TEST AND PIPING PER PLAN OK. PRESSURE TEST INCLUDED TEE AND SHUTOFF VALVE INSIDE BUILDING FOR TENANT FINISH. CAN FINAL GAS ON CORE AND SHELL ONCE REQUESTED. | MARKB | MARKB | | HI | C | 6071805 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 02/12/2019 | R.P. backflow installed for irrigation and yard hydrant | TED | TED | | P= | C | 6104391 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 02/12/2019 | connection to yard hydrant line in building in images | TED | TED | | PTO | C | 6104182 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 02/12/2019 | material change letter to scanning | TED | TED | | P= | P | 6104151 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 02/01/2019 | yard hydrant inspection letter to scanning | TED | TED | | P= | P | 6094401 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | R | 01/23/2019 | see pto notes | TED | TED | | P= | R | 6085513 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PRD | C | 01/23/2019 | roof drains | TED | TED | | PRD | C | 6085512 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | R | 01/23/2019 | need 3rd party inspection letter on yard hydrant (line is covered ), need material change letter, need to complete water connection at water meter, note: dwv ok | TED | TED | | PTO | R | 6085508 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | P | 11/09/2018 | need material change letter, need pwo or 3rd party inspection report for hydrant in trash enclosure, rest ok test and design (grease trap vent run into building test ok) | TED | TED | | PB | P | 6021224 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | P | 11/08/2018 | water main under footer up into meter room, note: need pwo inspection for water line run to hydrant in trash enclosure that has been covered (was told it was installed by Cherokee water ) | TED | TED | | PB | P | 6019747 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XBS | T | 11/20/2018 | PAID (REC#1559095) PLAN SPLICE FEE: $50 by: DANM for Construction: Roof cricket revisions; add foundation insulation; added backflow preventer | DANM | DANM | | XBS | T | 6031387 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XPS | T | 10/18/2018 | PAID (REC#1550082) PLAN SPLICE FEE: $100 by: TCRIPPEN for Plumbing: plumbing splice 10-18-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5998082 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XMS | P | 10/16/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 5996245 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XBS | P | 10/16/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Revised site details and RTU placement. | SHELLEY | SHELLEY | | XBS | P | 5995891 |
GOLDEN TRIANGLE CONSTRUCTION, INC. | XES | P | 10/16/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added photocells, revised site lighting, added pole base detail and cut sheets, added power at drive thru, deleted RTU, revised panel schedules. | BERTHA | BERTHA | | XES | P | 5995540 |