BRYAN CONSTRUCTION, INC. | B= | C | 04/17/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6168863 |
BRYAN CONSTRUCTION, INC. | B= | P | 01/18/2019 | items corrected / final OK pending other finals. Additional Inspections Required (computer generated): OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6082913 |
BRYAN CONSTRUCTION, INC. | B= | P | 01/16/2019 | missing restroom signage / missing sheet metal cover plate (min 24 ga) attached with the appropriate hilti anchors per EJ received onsite for patch installed at the shaftliner / received 3rd party inspection report for welding and bolting onsite / need to complete other inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6079892 |
BRYAN CONSTRUCTION, INC. | BFR | P | 11/14/2018 | hard lid framing at vestibule OK / need engineer observation for welding at structural steel at vestibule and for Detail 1 at windows / still need listing or EJ for patch at shaft at end of grab and go area | DANE | DANE | | BFR | P | 6025470 |
BRYAN CONSTRUCTION, INC. | BFR | P | 11/13/2018 | Still need new listing for patch over shaft liner at grab and go counter -- Splice deleting detail 6 and 7 on file -- Still need to inspect detail 1 if being installed | DAKOTAB | DAKOTAB | | BFR | P | 6023829 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/31/2018 | still need listing for patch put over shaft liner with FS1 all around it at end of grab and go counter / need to splice in the deletion of details 6 7 and possibly detail 1 on page S1.100 if it is not to be installed / remainder of all other interior light gauge faming is OK pending splice and listing and completion of all other roughs | DANE | DANE | | BFR | P | 6011888 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/08/2018 | need listing to repair hole cut in existing shaft liner for outlet box at west end of Grab and Go counter top at corner of existing between south bathroom and grab and go area / need to replace mono-coat on beam above ceiling over south bathroom that was removed to install wall track / still need to frame up west phone room and install structural steel for glass sliding walls at west end of scope / will need 3rd party inspection for welding and bolting of structural steel / discussed accessible elements and need for 3rd party welding and bolting / need to complete all other rough inspections / all other interior light gauge framing OK pending other roughs | DANE | DANE | | BFR | P | 5988580 |
RYBA ELECTRIC, INC. | E= | C | 01/03/2019 | | RANDY | RANDY | | E= | C | 6067368 |
RYBA ELECTRIC, INC. | ER | P | 12/20/2018 | drop ceilings ok | RANDY | RANDY | | ER | P | 6059369 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 12/20/2018 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6059366 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 12/20/2018 | FIRE ALARM INSPECTION: | RANDY | RANDY | | ER | C | 6059358 |
RYBA ELECTRIC, INC. | ER | P | 12/20/2018 | all drop ceilings ok | RANDY | RANDY | | ER | P | 6060268 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 12/20/2018 | FIRE ALARM INSPECTION: see rough notes | RANDY | RANDY | | E= | C | 6060267 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 12/20/2018 | FIRE ALARM INSPECTION: 1st floor collaborative space and electric rm ok | RANDY | RANDY | | ER | C | 6060265 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 12/20/2018 | FIRE ALARM INSPECTION: 1st floor collaborative space and electric rm ok | RANDY | RANDY | | E= | C | 6060266 |
RYBA ELECTRIC, INC. | ER | P | 10/30/2018 | all walls ok----only ceilings left are the dropped | RANDY | RANDY | | ER | P | 6010283 |
RYBA ELECTRIC, INC. | ER | P | 10/10/2018 | walls marked on plans, pictures ok for nail plates on grab and go wall. | BRET | BRET | | ER | P | 5990835 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 01/02/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. THERMOSTATS AND SENSORS THROUGH BUILDING CONTROLS. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6066297 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 12/21/2018 | MECHANICAL FINAL OK PENDING: INSTALL THERMOSTATS AND PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6061100 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 10/11/2018 | RELOCATED VAV AND FAN POWER BOXES OK. MEDIUM AND LOW PRESSURE SUPPLY MAIN TRUNKS AND LATERALS OK, OK TO WRAP. FLEX INSTALLED, NO DIFFUSERS. BATH EXHAUST DUCT OK. TRANSFER DUCTS, FROM BATHROOMS ONLY, OK. NO AIR CURTAINS INSTALLED YET. | DUSTINS | DUSTINS | | HD | P | 5991944 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 04/17/2019 | ok for under belly dwv | JOHNS | JOHNS | | PTO | C | 6168865 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/17/2019 | | JOHNS | JOHNS | | P= | C | 6168862 |
OLSON PLUMBING & HEATING COMPANY | PE | L | 04/15/2019 | Renewed online for 1/2 Fee at 4/15/2019 4:56:33 PM (RECEIPT #: 1590493) | WEBSITE | WEBSITE | | PE | L | 6166474 |
OLSON PLUMBING & HEATING COMPANY | P= | L | 01/17/2019 | no call ahead number provided, made several attempts to call contractor, need contractor on site @ next inspection, PTO not complete | JOHNS | JOHNS | | P= | L | 6080865 |
OLSON PLUMBING & HEATING COMPANY | P= | L | 01/02/2019 | no call ahead number, need escort, PTO inspection was never complete. | TAYLOR | TAYLOR | | P= | L | 6066358 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/10/2018 | above ceiling vents and H2O ok, still need to inspect under floor DWV, note: need to add 3 floor drains and water heater to scope of work. | TAYLOR | TAYLOR | | PTO | P | 5990627 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/08/2018 | in walls DWV and H2O ok. | TAYLOR | TAYLOR | | PTO | P | 5988265 |
BRYAN CONSTRUCTION, INC. | XBS | T | 11/09/2018 | PAID (REC#1555382) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Removed structural elements for modular wall | SHELLEY | SHELLEY | | XBS | T | 6022134 |