PRO WALL SYSTEMS LLC | B= | C | 11/21/2018 | items corrected / stamped letter of compliance for C1 hard lids received / final OK pending other finals | DANE | DANE | | B= | C | 6032766 |
PRO WALL SYSTEMS LLC | B= | P | 11/14/2018 | still need stamped letter for how to build joist style C1 hard lids in bathrooms (can be seen from accesses and at office lid) / both accessible showers need minimum 1 1/2" finger space between shower valves and grab bars and both transfer showers need hand held shower head on a minimum 59" hose / north accessible bathroom does not have 60" width at clear floor space at toilet -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): WSM MECHANICAL Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6025637 |
PRO WALL SYSTEMS LLC | BFR | P | 10/19/2018 | remainder of interior light gauge framing is OK pending other roughs / suspended hard lid grid OK pending other roughs / still need stamped design for joist style hard lids in restrooms / still need to remove wing wall from plans per previous inspection / discussed accessible elements with contractor and need for 36 x 36 transfer shower and need for clear floor space outside of showers | DANE | DANE | | BFR | P | 6000858 |
PRO WALL SYSTEMS LLC | BFR | P | 10/16/2018 | west studio wall and east bathroom walls and all light gauge framing at studio OK pending other roughs - OK to top out hall in front of bathrooms so suspended ceiling grid can be installed / still need to inspect all other parts of framing at bathrooms and store / need installation guide for suspended hard lid grid at inspection / discussed all accessibility / need stamped design for water heater platform / need stamped design for joist style hard lids installed in bathrooms / need to remove wing wall at west studio wall that is not being installed from plans / need to designate what walls are P1, P1.1 an P2 walls on plans / discussed transfer showers and allowed superintendent to take pictures of ANSI drawings | DANE | DANE | | BFR | P | 5996176 |
COPPER SMITH ELECTRIC INC | E= | C | 11/14/2018 | | BRET | BRET | | E= | C | 6025094 |
COPPER SMITH ELECTRIC INC | E= | P | 11/12/2018 | be more specific on receptacles labeling (area served), identify rtu 5 and rtu 6 on panel schedule. install bushings on grc nipples at rtu disconnects. pictures ok | BRET | BRET | | E= | P | 6023064 |
COPPER SMITH ELECTRIC INC | ER | C | 11/07/2018 | | BRET | BRET | | ER | C | 6018855 |
COPPER SMITH ELECTRIC INC | ES | C | 10/29/2018 | Commercial Service: 200 amp 4w commercial service ok to set meter for unit 100 | JOSEPH | JOSEPH | | ES | C | 6008637 |
COPPER SMITH ELECTRIC INC | ER | P | 10/24/2018 | hard lid ok will need 4 maybe 3- 24x24 access panels for j-box access. 3 if conduit and box for rtu is extended into open area ceiling. | BRET | BRET | | ER | P | 6004817 |
COPPER SMITH ELECTRIC INC | ER | P | 10/15/2018 | 4 bath lids ok | BRET | BRET | | ER | P | 5994688 |
COPPER SMITH ELECTRIC INC | ER | P | 10/10/2018 | walls | BRET | BRET | | ER | P | 5991279 |
WSM MECHANICAL | H= | C | 11/21/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6031894 |
WSM MECHANICAL | H= | P | 11/19/2018 | CORRECT COMBUSTION AIR DUCTS INSTALLED PER PLAN. MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6029475 |
WSM MECHANICAL | H= | P | 11/14/2018 | MECHANICAL FINAL OK PENDING: HAVE ENGINEER ADDRESS COMBUSTION AIR/MAKE UP AIR FOR WATER HEATER AND DRYER OR INSTALL CORRECT SIZE DUCTS. PLAN CALLS FOR 10" HIGH AND LOW COMBUSTION AIR PIPES AND 6" HIGH AND LOW IS INSTALLED. PROVIDE TEST AND BALANCE REPORT FOR FINAL. | DUSTINS | DUSTINS | | H= | P | 6025116 |
WSM MECHANICAL | HI | C | 11/12/2018 | CHECK REGULATORS AT FINAL. NEED 2 LB APPROVAL LETTER FOR THIS SUITE BY FINAL. | DUSTINS | DUSTINS | | HI | C | 6023072 |
WSM MECHANICAL | HI | P | 11/08/2018 | 10 LB TEST OK TO WATER HEATER | BENH | BENH | | HI | P | 6020552 |
WSM MECHANICAL | HV | P | 11/08/2018 | NEED REVISED PLANS FOR WATER HEATER, MECHANICAL PAGES SHOW 2" PVC FOR WATER WATER HEATER AND B VENT WAS INSTALLED, SPLICE CALLS FOR WATER HEATER TO BE ON STAND STORAGE ROOM 106 LACKS MAKE UP AIR/ COMBUSTION AIR FOR WATER HEATER AND DRYER | BENH | BENH | | HV | P | 6020540 |
WSM MECHANICAL | HC | C | 10/31/2018 | OK TO SET 2 LB METER AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6011816 |
WSM MECHANICAL | HI | P | 10/31/2018 | 10 LB TEST OK. PIPING PER PLAN FOR RTU. MEDIUM PRESSURE STICKERS IN PLACE. NEED TO SEE PIPING FOR WATER HEATER AND REGULATORS BY FINAL. | DUSTINS | DUSTINS | | HI | P | 6011811 |
WSM MECHANICAL | HI | P | 10/30/2018 | CALLED CONTRACTOR AND LEFT MESSAGE AT 1138, BUILDING LOCKED AT 1205, WAITED TIL 1213. NO ACCESS INSIDE. LOW TEST. | DUSTINS | DUSTINS | | HI | P | 6010304 |
WSM MECHANICAL | HD | C | 10/17/2018 | NEED GAS CONTRACTOR ATTACHED TO PERMIT, PLUMBING PAGES SHOW GAS WATER HEATER. RTU- 1 AND 2 SUPPLY AND RETURN AIR MAIN TRUNKS AND LATERALS OK, OK TO WRAP. NO FLEX AND DIFFUSERS YET. EF- 1, 2, 3 AND 4 EXHAUST DUCTS OK. DRYER EXHAUST DUCT IN WALL OK, OK TO TO COVER PER MECHANICAL ONLY. NO ROOF TODAY. | DUSTINS | DUSTINS | | HD | C | 5997705 |
SAINT JOSEPH PLUMBING LLC | P= | C | 11/14/2018 | | TAYLOR | TAYLOR | | P= | C | 6024977 |
SAINT JOSEPH PLUMBING LLC | PTO | C | 10/17/2018 | check water heater by final, note: discussed accessible showers with contractor. | TAYLOR | TAYLOR | | PTO | C | 5997098 |
SAINT JOSEPH PLUMBING LLC | PB | C | 10/01/2018 | | TAYLOR | TAYLOR | | PB | C | 5981337 |
WSM MECHANICAL | XMS | T | 11/14/2018 | PAID (REC#1556268) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: revised gas piping | DALEH | DALEH | | XMS | T | 6025039 |
SAINT JOSEPH PLUMBING LLC | XPS | P | 11/12/2018 | PLAN SPLICE FEE: $0 by: TCRIPPEN for Plumbing: plumbing splice 11-12-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 6023195 |
WSM MECHANICAL | XMS | T | 11/12/2018 | PAID (REC#1555652) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: changed water heater and added comb. air duct | DALEH | DALEH | | XMS | T | 6023187 |
SAINT JOSEPH PLUMBING LLC | XPS | T | 10/22/2018 | PAID (REC#1549542) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 10-22-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6001534 |
PRO WALL SYSTEMS LLC | XBS | T | 10/19/2018 | PAID (REC#1549539) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: moved water heater; revised ceiling; updated wall type notes | LBENNETT | LBENNETT | | XBS | T | 6000217 |