THOMAS GENERAL CONTRACTORS, INC. | B= | C | 07/09/2019 | hand rails okay | BOBF | BOBF | | B= | C | 6257535 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 03/21/2019 | Handrails need to have extensions installed per IBC 1012.6 -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6139811 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 02/20/2019 | Temp CO: extension ( Expires: 3/22/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6111551 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 01/22/2019 | Temp CO: Ok to extend per BW ( Expires: 2/21/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6084281 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 12/21/2018 | Temp CO: Pending final mechanical ( Expires: 1/20/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6060698 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 12/19/2018 | need handrails installed at stairs, complete all required inspections. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6058181 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 11/15/2018 | notched stud letter of acceptance on file. frame okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 6026169 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 11/13/2018 | address rear bearing wall 2X6 studs notched 3 times each entire length of wall by plumbing, landing at stairs need minimum 36", need mechanical inspection of wall for hood in kitchen, stamped observation letter for pads and post at mezzanine framing. | NATHAN | NATHAN | | BFR | P | 6023993 |
DILLER ELECTRIC LLC | E= | C | 12/18/2018 | | BRIAN | BRIAN | | E= | C | 6056765 |
DILLER ELECTRIC LLC | E= | P | 12/14/2018 | still need panel label--add light in the water control room---grc on down rod for exits--- | BRIAN | BRIAN | | E= | P | 6053073 |
DILLER ELECTRIC LLC | ER | P | 12/13/2018 | south rtu--ok -----north rtu needs bonding screw installed---- | BRIAN | BRIAN | | ER | P | 6051590 |
DILLER ELECTRIC LLC | ES | C | 12/03/2018 | Commercial Service: ok for contractor to sch switch over with csu------ok to set meter---400 amp 4-w--- | BRIAN | BRIAN | | ES | C | 6041054 |
DILLER ELECTRIC LLC | ER | P | 11/30/2018 | bar area--loft---all can lights---ok | BRIAN | BRIAN | | ER | P | 6040193 |
DILLER ELECTRIC LLC | ER | P | 11/15/2018 | north demising wall and bathrooms--ok | BRIAN | BRIAN | | ER | P | 6026312 |
DILLER ELECTRIC LLC | ER | P | 11/09/2018 | partial walls and ceiling in the kitchen area----see plans-- | BRIAN | BRIAN | | ER | P | 6021280 |
DILLER ELECTRIC LLC | ESL | C | 10/23/2018 | | BRIAN | BRIAN | | ESL | C | 6002943 |
DILLER ELECTRIC LLC | ESL | T | 10/22/2018 | PAID (REC#1549843): no pipe installed---complete reinspect---- | BRIAN | BRIAN | | ESL | T | 6001318 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 03/27/2019 | | JERRYF | JERRYF | | H= | C | 6145595 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 03/22/2019 | NEED TAB REPORT RESUBMITTED - ALL OTHER CORRECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6140976 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 03/22/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6140639 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 12/19/2018 | PARTIAL FINAL PENDING THE FOLLOWING - TAB REPORT - PROTECTIVE WALL BESIDE TOP OF HOOD TO PROTECT HOOD INSULATION - REPAIR TEARS ON HOOD INSULATION - SAFETY RAILING AT MUA - ROOF ACCESS LADDER NOTES: INTERLOCKS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6057877 |
CLARK PLUMBING & HEATING | H= | C | 12/18/2018 | | JERRYF | JERRYF | | H= | C | 6055868 |
CLARK PLUMBING & HEATING | H= | C | 12/18/2018 | ALL OK | JERRYF | JERRYF | | H= | C | 6055753 |
CLARK PLUMBING & HEATING | H= | P | 12/17/2018 | FIELD CANCELED BY CONTRACTOR ( NOT READY ) | LIDO | LIDO | | H= | P | 6054548 |
CLARK PLUMBING & HEATING | H= | P | 12/14/2018 | PARTIAL PENDING 2# APPROVAL LETTER FROM GAS PURVEYOR - PICTURES OF REGULATOR VENT PROTECTION ON ROOF ATTACH PICTURES TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 6053802 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HSP | P | 12/06/2018 | HAD CONSULT WITH G.C. ON HANGING SALAMANDER UNDER HOOD - APPEARS UNIT MAY LACK CLEARANCE TO COMBUSTIBLES | JERRYF | JERRYF | | HSP | P | 6044748 |
CLARK PLUMBING & HEATING | HC | C | 12/06/2018 | OK FOR 2# METER RELEASE | JERRYF | JERRYF | | HC | C | 6044711 |
CLARK PLUMBING & HEATING | HI | C | 12/06/2018 | PRESSURE TESTS OK FOR 2# LETTER - PIPING PER PLAN - AT FUTURE INSPECTION VERIFY ALL MEDIUM PRESSURE LABELS / REGULATOR VENTS AND FINAL CONNECTIONS - 2# LETTER | JERRYF | JERRYF | | HI | C | 6044698 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 12/03/2018 | FACTORY GREASE DUCT - HOOD - HARD LID RESTROOM EXHAUST - WATER HEATER VENT OK - NEED ROOF ACCESS LADDER AND SAFETY RAILING AT MUA | JERRYF | JERRYF | | HD | P | 6041014 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 11/14/2018 | HOOD WALL OK FOR ZERO CLEARANCE HOOD - AT FUTURE INSPECTION VERIFY PROPER CLEARANCE'S TO APPLIANCES | JERRYF | JERRYF | | HD | P | 6025272 |
CLARK PLUMBING & HEATING | P= | C | 12/19/2018 | | TAYLOR | TAYLOR | | P= | C | 6057507 |
CLARK PLUMBING & HEATING | P= | P | 12/18/2018 | install T&P, 3 comp sink needs individual drains, support expansion tank, rest ok. | TAYLOR | TAYLOR | | P= | P | 6057195 |
CLARK PLUMBING & HEATING | PTO | C | 11/13/2018 | Check water heater and tie-ins at final | SHANEN | SHANEN | | PTO | C | 6023647 |
CLARK PLUMBING & HEATING | PGI | C | 11/05/2018 | Per plan | SHANEN | SHANEN | | PGI | C | 6015507 |
CLARK PLUMBING & HEATING | PB | P | 10/17/2018 | Need to install grease trap and vent, sanitary and grease waste test OK | SHANEN | SHANEN | | PB | P | 5997084 |
DILLER ELECTRIC LLC | XES | T | 11/19/2018 | PAID (REC#1557341) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: REvise feeder 5 | SHELBY | SHELBY | | XES | T | 6029197 |
THOMAS GENERAL CONTRACTORS, INC. | XES | P | 10/02/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 5982587 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 10/02/2018 | PAID (REC#1543998) PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout related to value engineering | DANM | DANM | | XBS | T | 5982530 |
THOMAS GENERAL CONTRACTORS, INC. | XPS | P | 10/02/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 10-02-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5982504 |
THOMAS GENERAL CONTRACTORS, INC. | XMS | T | 10/02/2018 | PAID (REC#1543998) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 2 | DALEH | DALEH | | XMS | T | 5982479 |