GORDON CONSTRUCTION COMPANY, INC | B= | C | 10/10/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6364277 |
GORDON CONSTRUCTION COMPANY, INC | B= | P | 10/01/2019 | All items completed / Building final OK pending all other finals complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), CBA MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6353923 |
GORDON CONSTRUCTION COMPANY, INC | BIN | C | 10/01/2019 | ES report on file | NICK | NICK | | BIN | C | 6353914 |
GORDON CONSTRUCTION COMPANY, INC | BIN | P | 08/26/2019 | Insulation certificate uploaded / Still need ES report for spray foam used | NICK | NICK | | BIN | P | 6313494 |
GORDON CONSTRUCTION COMPANY, INC | BFT | C | 08/26/2019 | Open hole on file / #2000psf | NICK | NICK | | BFT | C | 6313479 |
GORDON CONSTRUCTION COMPANY, INC | B= | P | 08/15/2019 | Temp CO: Pending all finals ( Expires: 9/14/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6301444 |
GORDON CONSTRUCTION COMPANY, INC | B= | P | 08/13/2019 | Need to install parapet cap for front entry roof / Need to install landing outside back egress door / Need to complete BFT, BFN and BIN / Need open hole report / Need ES report for spray foam / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), CBA MECHANICAL LLC Mechanical Final Inspection is not Completed yet, D & D PLUMBING Mechanical Final Inspection is not Completed yet, D & D PLUMBING Plumbing Final Inspection is not Completed yet, WINTERS ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6299102 |
GORDON CONSTRUCTION COMPANY, INC | BFT | P | 08/13/2019 | 3rd party observation on file for footing/foundation on file / Still need open hole report | NICK | NICK | | BFT | P | 6299097 |
GORDON CONSTRUCTION COMPANY, INC | BIN | P | 06/04/2019 | Need ES report for spray foam used in attic space / All other insulation OK / Need to close out footing/foundation inspections with all 3rd party observations and open hole report | NICK | NICK | | BIN | P | 6219289 |
GORDON CONSTRUCTION COMPANY, INC | BFR | P | 05/23/2019 | Frame & Firestop OK pending other Roughs / need all third party observations for footing and foundation / discussed accessible elements | RICHB | RICHB | | BFR | P | 6208594 |
GORDON CONSTRUCTION COMPANY, INC | BFR | R | 05/22/2019 | Field Cancelled by Jose (with Gordon) | RICHB | RICHB | | BFR | R | 6206939 |
GORDON CONSTRUCTION COMPANY, INC | BSP | P | 01/16/2019 | Exterior sheathing OK per plans / discussed "Trusses Pending" status | RICHB | RICHB | | BSP | P | 6079706 |
GORDON CONSTRUCTION COMPANY, INC | BFI | C | 12/04/2018 | 2" R-10 vertical OK per COMcheck / discussed third party inspections for foundation | RICHB | RICHB | | BFI | C | 6042173 |
GORDON CONSTRUCTION COMPANY, INC | BFN | P | 12/04/2018 | Authorized 3rd party engineer inspection with all observation paperwork to follow | RICHB | RICHB | | BFN | P | 6042172 |
GORDON CONSTRUCTION COMPANY, INC | BFT | P | 12/04/2018 | Authorized 3rd party engineer inspection with all observation paperwork to follow | RICHB | RICHB | | BFT | P | 6042170 |
WINTERS ELECTRIC, INC. | E= | C | 08/27/2019 | 2 a/c's 30 amp breakers | GARYL | GARYL | | E= | C | 6316228 |
WINTERS ELECTRIC, INC. | E= | P | 08/13/2019 | The electric in this building is okay, the issue is in the a/c units, | GARYL | GARYL | | E= | P | 6299300 |
WINTERS ELECTRIC, INC. | E= | R | 08/12/2019 | 2-a/c's, 22.0 min on #12/2 nm | GARYL | GARYL | | E= | R | 6297653 |
WINTERS ELECTRIC, INC. | ES | P | 05/29/2019 | Commercial Service: new commercial, 200 amp,4w, ok to set meter,-----------------------label AIC and date calculated by final, cb's in main panel,ok----ir ufer, | JOHNN | JOHNN | | ES | P | 6213253 |
WINTERS ELECTRIC, INC. | ER | C | 05/29/2019 | walls and lids,ok | JOHNN | JOHNN | | ER | C | 6213251 |
PHOENIX FIRE AND SECURITY, LLC | E= | C | 05/08/2019 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 6192400 |
PHOENIX FIRE AND SECURITY, LLC | ER | C | 05/08/2019 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 6192399 |
WINTERS ELECTRIC, INC. | ER | P | 05/08/2019 | missing bath fans, panel and HR'S not installed, need HR for FA panel, rest is ok,--------------------------------------verify cans are IC rated, | JOHNN | JOHNN | | ER | P | 6192398 |
WINTERS ELECTRIC, INC. | EUG | C | 12/03/2018 | pvc between buildings, | JOHNN | JOHNN | | EUG | C | 6041037 |
CBA MECHANICAL LLC | H= | C | 10/10/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6363976 |
D & D PLUMBING | H= | C | 09/30/2019 | | JERRYF | JERRYF | | H= | C | 6352599 |
CBA MECHANICAL LLC | HSP | P | 09/11/2019 | APPROVED SUBMITTALS RECEIVED | JERRYF | JERRYF | | HSP | P | 6330737 |
CBA MECHANICAL LLC | H= | P | 09/06/2019 | SEVERAL READINGS OUTSIDE +/- 10% - OSA READINGS OUTSIDE +/- 10% - NEED LETTER FROM ENGINEER APPROVING THESE READINGS OR SUBMIT NEW TAB REPORT - NEED NEW EQUIPMENT SUBMITTAL SHOWING ARMSTRONG AS APPROVED EQUIPMENT OR STAMPED LETTER | JERRYF | JERRYF | | H= | P | 6325911 |
D & D PLUMBING | HSP | P | 08/16/2019 | CONTRACTOR NEEDS TO START CALLING IN FINALS FOR WATER HEATER CLOSETS ONCE RAILINGS ARE INSTALLED | JERRYF | JERRYF | | HSP | P | 6304144 |
CBA MECHANICAL LLC | H= | P | 08/16/2019 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 6304129 |
CBA MECHANICAL LLC | H= | P | 08/15/2019 | PARTIAL PENDING COMPLETION OF FLUE TERMINATIONS AT EXTERIOR AND TAB REPORT NOTES: OSA DUCTS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6302242 |
D & D PLUMBING | H= | P | 08/15/2019 | need to leak test furnaces at final walk inspection | JERRYF | JERRYF | | H= | P | 6301430 |
CBA MECHANICAL LLC | H= | P | 08/14/2019 | NEED THE FOLLOWING - OSA DUCT FINAL CONNECTIONS / FLUE TERMINATIONS COMPLETED / TAB REPORT / WILL RE INSPECT TO COMPLETE ON 8 / 15 NOTES: ALL OTHER CORRECTIONS MADE | JERRYF | JERRYF | | H= | P | 6300100 |
CBA MECHANICAL LLC | H= | P | 08/13/2019 | NEED THE FOLLOWING - SECURE FURNACE VENTS / COMPLETE VENT TERMINATIONS - COMPLETE OSA DUCT AND DAMPERS TO FURNACES / INSTALL LOCK BOXES AT 2 THERMOSTATS - TAB REPORT - COMPLETE AND SECURE CONDENSATE DRAINS TO FLOOR - PER CONTRACTOR INSPECTION HAS BEEN RECALLED FOR 8/14 (((((( NOTES: ALL SA / RA AND EXHAUST GRILLES ARE COMPLETE )))))) | JERRYF | JERRYF | | H= | P | 6298713 |
D & D PLUMBING | HC | C | 08/08/2019 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6293774 |
D & D PLUMBING | HI | C | 08/08/2019 | TEST OK - AT FINAL LEAK TEST ALL FURNACE CONNECTIONS | JERRYF | JERRYF | | HI | C | 6293758 |
D & D PLUMBING | HI | P | 08/07/2019 | NEED GAUGE RELOCATED AND NEW TEST INSPECTION CALLED - NEED FURNACE LINE TIED INTO EXTERIOR RISER - NEED TO VERIFY THAT REGULATOR CAN BE REMOVED AT FURNACE AREA | JERRYF | JERRYF | | HI | P | 6291474 |
D & D PLUMBING | HO | C | 08/07/2019 | TEST OK PIPING PER PLAN - AT FINAL VERIFY RISER PROTECTION AT 2 STUBS ON PATIO | JERRYF | JERRYF | | HO | C | 6291470 |
CBA MECHANICAL LLC | HRP | C | 06/04/2019 | 2 PRESSURE TESTS AND LINE SETS OK | JERRYF | JERRYF | | HRP | C | 6219906 |
CBA MECHANICAL LLC | HD | P | 05/21/2019 | looked at supply air ducts that are not going to be exposed return air not yet installed or outside air not yet installed . | DAVIDH | DAVIDH | | HD | P | 6206168 |
D & D PLUMBING | P= | C | 08/13/2019 | Corrections made. | SAMH | SAMH | | P= | C | 6299451 |
D & D PLUMBING | P= | P | 08/12/2019 | Need trap guards in restroom floor drains, Water temp at lavs exceeds 110deg, Need vacuum relief valve, and expansion tank at water heater. Complete insulation on water lines in attic. Terminate or run pan drain to approved location. Lacking 27" knee space at accessible drinking fountain. | SAMH | SAMH | | P= | P | 6297733 |
D & D PLUMBING | PTO | C | 05/23/2019 | VTR, Check water heater at final. | SAMH | SAMH | | PTO | C | 6209333 |
D & D PLUMBING | PTO | P | 05/22/2019 | Test DWV, Set and secure flanges between 17" and 19" from finished wall, Note: Check water heater and entry at final. | SAMH | SAMH | | PTO | P | 6206764 |
D & D PLUMBING | PTO | L | 05/21/2019 | Field cancel. | SAMH | SAMH | | PTO | L | 6205673 |
AMEN PLUMBING- HEATING | PB | C | 10/17/2018 | Test OK | SHANEN | SHANEN | | PB | C | 5997630 |
CBA MECHANICAL LLC | XMS | T | 07/30/2019 | PAID (REC#1618185) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: removed 1 BBQ, rerouted gas line, | TCRIPPEN | TCRIPPEN | | XMS | T | 6281444 |
GORDON CONSTRUCTION COMPANY, INC | XBS | T | 05/21/2019 | PAID (REC#1600165) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Remove cabinets; add wet bar | LBENNETT | LBENNETT | | XBS | T | 6205694 |
WINTERS ELECTRIC, INC. | XES | P | 05/21/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added wet bar in clubhouse. | BERTHA | BERTHA | | XES | P | 6205682 |
D & D PLUMBING | XPS | P | 05/21/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: new plumbing splice added wet bar and plumbing . | TCRIPPEN | TCRIPPEN | | XPS | P | 6205644 |