HENSEL PHELPS CONSTRUCTION CO | B= | C | 11/27/2019 | | NATHAN | NATHAN | | B= | C | 6410955 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 06/21/2019 | pending completion of other required inspections, cloud ceiling at entry corridor okay | BOBF | BOBF | | BFR | P | 6239203 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 06/05/2019 | 1st floor With completed required inspections all walls and hardlids EXCEPT ENTRY CORRIDOR 114 CEILING okay, penetrations sealed at floor/ceiling. | NATHAN | NATHAN | | BFR | P | 6220630 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 02/26/2019 | basement wall framing and 2nd floor ceiling hardlid and cloud framing in lobby 220, 248 with completed required inspections okay. | NATHAN | NATHAN | | BFR | P | 6117342 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 01/28/2019 | 2nd floor wall, penetrations and soffit framing areas 208, coffee bar 214, phone booth 226,228,266,268, office 260/238 open collab 210 and media zone 240 okay with completed required MEP inspections, wall types per A0.1, A3.1, | NATHAN | NATHAN | | BFR | P | 6089747 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 01/14/2019 | Need to attach Plumbing / 2nd floor framing - need walls for Rooms 208, 214, 226, 228, 238, 260, 266 & 268, all other walls on this floor OK pending other Roughs / need to inspect soffit and hard lid framing when ready / reviewed accessible elements | RICHB | RICHB | | BFR | P | 6077118 |
ENCORE ELECTRIC, INC. | E= | C | 08/07/2019 | corrections--l/v on grid okay | GARYL | GARYL | | E= | C | 6291393 |
ENCORE ELECTRIC, INC. | ER | P | 07/09/2019 | grid ceilings ok except the copy room low volt laying on the grid | BRIAN | BRIAN | | ER | P | 6257197 |
ENCORE ELECTRIC, INC. | E= | C | 07/09/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6257196 |
ENCORE ELECTRIC, INC. | E= | C | 07/09/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6257191 |
ENCORE ELECTRIC, INC. | ER | C | 07/09/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6257190 |
ENCORE ELECTRIC, INC. | ER | P | 07/02/2019 | FIRE ALARM INSPECTION: south half of unit main floor / | BRIAN | BRIAN | | ER | P | 6251497 |
ENCORE ELECTRIC, INC. | ER | P | 07/02/2019 | south ceilings on main floor/ | BRIAN | BRIAN | | ER | P | 6251493 |
ENCORE ELECTRIC, INC. | ER | P | 06/20/2019 | last walls and hard lids--ok | BRIAN | BRIAN | | ER | P | 6238031 |
ENCORE ELECTRIC, INC. | ER | P | 06/20/2019 | FIRE ALARM INSPECTION: all hard lid ok ---boxes and wire | BRIAN | BRIAN | | ER | P | 6238027 |
ENCORE ELECTRIC, INC. | ER | P | 06/10/2019 | FIRE ALARM INSPECTION: pipe and boxes except room 122 | BRIAN | BRIAN | | ER | P | 6225649 |
ENCORE ELECTRIC, INC. | ER | P | 06/10/2019 | rest of wall except room 122/ | BRIAN | BRIAN | | ER | P | 6225644 |
ENCORE ELECTRIC, INC. | ER | P | 05/30/2019 | FIRE ALARM INSPECTION: main floor south half | BRIAN | BRIAN | | ER | P | 6214684 |
ENCORE ELECTRIC, INC. | ER | P | 05/30/2019 | main floor south 1/2 ---see plans---walls | BRIAN | BRIAN | | ER | P | 6214679 |
ENCORE ELECTRIC, INC. | ESL | P | 05/14/2019 | 5 floor boxes on 2nd level | BRIAN | BRIAN | | ESL | P | 6198534 |
ENCORE ELECTRIC, INC. | EP | C | 04/04/2019 | pnl P2A ok | CRAIGS | CRAIGS | | EP | C | 6154679 |
ENCORE ELECTRIC, INC. | E= | P | 04/04/2019 | 2ND FLOOR ok | CRAIGS | CRAIGS | | E= | P | 6154667 |
ENCORE ELECTRIC, INC. | E= | P | 04/03/2019 | east side of 2nd floor and basement ---see plans marked in blue high lighter / | BRIAN | BRIAN | | E= | P | 6153628 |
ENCORE ELECTRIC, INC. | ER | P | 04/01/2019 | FIRE ALARM INSPECTION: basement fire alarm --ok | BRIAN | BRIAN | | ER | P | 6151208 |
ENCORE ELECTRIC, INC. | ER | C | 03/12/2019 | FIRE ALARM INSPECTION: rough in complete | CHIPO | CHIPO | | ER | C | 6131424 |
ENCORE ELECTRIC, INC. | ER | C | 03/12/2019 | rough in complete | CHIPO | CHIPO | | ER | C | 6131411 |
ENCORE ELECTRIC, INC. | ER | P | 02/25/2019 | hard lid 2nd floor elevator area okay--walls basement elevator area okay | CHIPO | CHIPO | | ER | P | 6115911 |
ENCORE ELECTRIC, INC. | ER | P | 02/25/2019 | FIRE ALARM INSPECTION: hard lid 2nd floor in elevator area okay----walls in basement elevator area okay | CHIPO | CHIPO | | ER | P | 6115907 |
ENCORE ELECTRIC, INC. | ER | P | 02/13/2019 | hall way hard lid right of the elevator | CRAIGS | CRAIGS | | ER | P | 6105843 |
ENCORE ELECTRIC, INC. | ER | P | 01/30/2019 | stair way ceiling and 2 soffits--see plans---ok | BRIAN | BRIAN | | ER | P | 6092181 |
ENCORE ELECTRIC, INC. | ER | P | 01/23/2019 | FIRE ALARM INSPECTION: fire alarm rough in for walls okay | CHIPO | CHIPO | | ER | P | 6085472 |
ENCORE ELECTRIC, INC. | ER | P | 01/23/2019 | rough in for walls okay | CHIPO | CHIPO | | ER | P | 6085467 |
ENCORE ELECTRIC, INC. | ER | R | 01/22/2019 | FIRE ALARM INSPECTION: need a point of contact at guard shack | GARYL | GARYL | | ER | R | 6085232 |
ENCORE ELECTRIC, INC. | ER | R | 01/22/2019 | need a point of contact at guard shack | GARYL | GARYL | | ER | R | 6085231 |
COLORADO SHEET METAL CO., INC. | H= | C | 10/28/2019 | ENGINEER LETTER FOR TAB REPORT HAS BEEN RECEIVED AND SENT TO SCANNING | JERRYF | JERRYF | | H= | C | 6381630 |
COLORADO SHEET METAL CO., INC. | H= | P | 10/10/2019 | TAB REPORT RECEIVED STILL HAVE SEVERAL READINGS OUTSIDE +/- 10% NEED REVISED TAB OR LETTER FROM ENGINEER APPROVING READINGS | JERRYF | JERRYF | | H= | P | 6364027 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/21/2019 | SEVERAL READINGS OUTSIDE +/- 10% NEED TO SUBMIT NEW TAB OR NEED LETTER FROM ENGINEER APPROVING THESE READINGS | JERRYF | JERRYF | | H= | P | 6308132 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/17/2019 | RECEIVED PICTURE VIA EMAIL FROM BRODY OF CORRECTIONS MADE ,MECHANICAL OK PENDING TAB REPORT | BENH | BENH | | H= | P | 6266093 |
COLORADO SHEET METAL CO., INC. | HSP | P | 07/15/2019 | ENGINEER LETTER APPROVING EXHAUST FAN LOCATION LESS THAN 10 FEET FROM RTU-5 ECONOMIZER RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | HSP | P | 6263132 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/11/2019 | NEED LETTER FROM ENGINEER APPROVING BATH EXHAUST LOCATION IN RELATION TO RTU-5 ECONOMISER, NEED 3- SLOT DIFFUSER INSTALLED IN BOARD ROOM 126, NEED RETURN GRILLE INSTALLED IN HUDDLE ROOM 125, OK TO ATTACH PICTURE TO INSPECTION REQUEST, NEED TAB REPORT | BENH | BENH | | H= | P | 6259972 |
COLORADO SHEET METAL CO., INC. | HD | P | 07/03/2019 | M1.1 (BDA 218) - FROM LOBBY TO SOUTH END BUT NO TRAINING ROOM: FLEX AND DIFFUSERS OK. INSTALL ALL T-STATS. ROOF - RTU-5: BATH EXHAUST FAN WITHIN 10 FEET OF ECONOMIZER. RTU-1: OK, THIS IS A REPLACEMENT UNIT AND IT WAS REINSTALLED IN THE ORIGINAL LOCATION. RTU-6: OK, RTU-7: OK, RTU-12: OK. | NANCY | NANCY | | HD | P | 6253073 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/18/2019 | ABOVE CEILING MEDIUM PRESSURE TIE INS AND BOXES AT EXISTING LOW PRESSURE DUCTS OK ON THE FOLLOWING BOXES 12 / 1 - 12 / 2 AND 12 / 3 - | JERRYF | JERRYF | | HD | P | 6235433 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/11/2019 | NORTH END FROM ELEVATOR LOBBY TO EXTERIOR WALL ABOVE CEILING SA / RA MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6226829 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/05/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR SOUTH FROM ELEVATOR LOBBY TO EXTERIOR - ABOVE CEILING SA / RA MAINS / RUN OUTS AND VAV BOXES OK | JERRYF | JERRYF | | HD | P | 6221370 |
COLORADO SHEET METAL CO., INC. | H= | P | 04/02/2019 | PARTIAL FINAL PENDING TAB REPORT FOR PHASE 1 - BASEMENT AND 2ND FLOOR AND THE FOLLOWING RTU'S 11 - 14 - 15 - 2 -3 - 44 ALL SA / RA AND EXHAUST GRILLES ARE COMPLETE - PARTIAL FINAL PENDING TAB REPORT - STILL NEED PHASE 1 AND RTU'S 12 - 5 - 6 - 7 - 1 | JERRYF | JERRYF | | H= | P | 6152628 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/11/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR SA / RA CONNECTIONS AND GRILLES HIGHLIGHTED IN YELLOW ON CSM PLAN PAGE A3.1 REFLECTED CEILING PAGE - ALL OK | JERRYF | JERRYF | | HD | P | 6130198 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/13/2019 | ABOVE CEILING OK ON 2ND FLOOR - NEED ASI 6 APPROVED BY PPRBD - CONTRACTOR PROCEEDING AT OWN RISK | JERRYF | JERRYF | | HD | P | 6106363 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/01/2019 | MEDIUM PRESSURE TIE IN TO BOX OK AT TO CONCEAL 1 BOX ONLY | JERRYF | JERRYF | | HD | P | 6094556 |
COLORADO SHEET METAL CO., INC. | HD | P | 01/22/2019 | CONTRACTOR WORKING ON SET OF PLANS DATED 1-16-19 (ASI-6) NOT STAMPED BY PPRBD, PLAN IS NOT IN SYSTEM. PROCEED AT OWN RISK UNTIL PLANS ARE REVISED/APPROVED. THIS INSPECTION WAS FOR SECOND FLOOR: ALL MEDIUM/LOW PRESSURE SUPPLY OK, OK TO WRAP EXCEPT STILL NEED TO SEE RTU-11, 14 AND 15 DUCTS. NO VAV'S INSTALLED YET, CHECK CONNECTIONS TO VAV'S. ALL TRANSFER DUCTS OK EXCEPT MISSING TRANSFER FOR 229. NO EXHAUST OR ROOF TODAY. | DUSTINS | DUSTINS | | HD | P | 6085234 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 08/22/2019 | See plan splice dated 8/21/2019 (ASI-10). | DANR | DANR | | P= | C | 6309733 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 08/16/2019 | Need plan splice on plumbing showing deletion of bathroom work, fix scope of work for deleted bathroom work, rest ok. | DANR | DANR | | P= | P | 6303188 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 06/04/2019 | | DANR | DANR | | PB | C | 6219016 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 06/04/2019 | Ok. Note: by final fix scope of work (bathroom work deleted.) | DANR | DANR | | PTO | C | 6219005 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/15/2019 | Nail protection coffee bar 2nd floor ok. | DANR | DANR | | PTO | P | 6199512 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/15/2019 | Ok for 2" underground drain to coffee bar on 2nd floor. | DANR | DANR | | PB | P | 6199510 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/23/2019 | Coffee bar 214 in wall inspection only: need nail protection dwv dirty arm (picture ok)- domestic water ok. | DANR | DANR | | PTO | P | 6085470 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 08/21/2019 | PAID (REC#1623948) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 8/21/19: Delta ASI-10 revisions existing restrooms to remain | SHANEN | SHANEN | | XPS | T | 6308273 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/03/2019 | PAID (REC#1603352) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 6/3/19: Delta 9 revisions - re-route piping to FS-1 and S-1. | SHANEN | SHANEN | | XPS | T | 6218037 |
COLORADO SHEET METAL CO., INC. | XMS | T | 06/03/2019 | PAID (REC#1603353) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 6217781 |
ENCORE ELECTRIC, INC. | XES | T | 06/03/2019 | PAID (REC#1603354) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting. | BERTHA | BERTHA | | XES | T | 6217396 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 05/31/2019 | PAID (REC#1603356) PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to architectural sheets | DANM | DANM | | XBS | T | 6215504 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 04/29/2019 | PAID (REC#1594141) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 4/29/19: P0.1 updated plumbing equipment schedule, P1.0 piping for added floor sink, P1.1 new floor sink location | SHANEN | SHANEN | | XPS | T | 6181082 |
ENCORE ELECTRIC, INC. | XES | T | 04/26/2019 | PAID (REC#1594143) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power plans. Revised panel schedules. | BERTHA | BERTHA | | XES | T | 6180121 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 04/24/2019 | PAID (REC#1594145) PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions throughout architectural sheets | DANM | DANM | | XBS | T | 6176917 |
ENCORE ELECTRIC, INC. | XES | T | 02/26/2019 | PAID (REC#1579769) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power, lighting and panels. See summary of revisions. | BERTHA | BERTHA | | XES | T | 6117217 |
COLORADO SHEET METAL CO., INC. | XMS | T | 02/25/2019 | PAID (REC#1579770) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 2-25-19 new mechanical splice, added new supply to room 012, relocate T- stat, rerouted ducts, adjusted VAV schedule | TCRIPPEN | TCRIPPEN | | XMS | T | 6116461 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 02/22/2019 | PAID (REC#1578473) PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to floor plans, reflected ceiling plans, doors and interior finish plans | DANM | DANM | | XBS | T | 6114944 |
COLORADO SHEET METAL CO., INC. | XMS | P | 02/20/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 6112499 |
ENCORE ELECTRIC, INC. | XES | T | 02/20/2019 | PAID (REC#1578149) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Multiple power and lighting changes - see summary of changes on 81/2 X11. | BERTHA | BERTHA | | XES | T | 6111742 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 02/14/2019 | PAID (REC#1578150) PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout architectural sheets | DANM | DANM | | XBS | T | 6107880 |