HIGH COUNTRY INTERNATIONAL LTD | B= | C | 05/21/2019 | Finished basement | NICK | NICK | | B= | C | 6205882 |
HIGH COUNTRY INTERNATIONAL LTD | BLA | C | 02/06/2019 | Lath OK | RICHB | RICHB | | BLA | C | 6099635 |
HIGH COUNTRY INTERNATIONAL LTD | BIN | C | 01/23/2019 | Thermal in walls OK - verify crawl & attic at Final | RICHB | RICHB | | BIN | C | 6085505 |
HIGH COUNTRY INTERNATIONAL LTD | BFR | C | 01/17/2019 | Framing OK - other Roughs already complete | RICHB | RICHB | | BFR | C | 6081630 |
HIGH COUNTRY INTERNATIONAL LTD | BTR | C | 01/03/2019 | Flashing, underlayment & battens OK | RICHB | RICHB | | BTR | C | 6067465 |
HIGH COUNTRY INTERNATIONAL LTD | BFD | C | 11/02/2018 | Drain OK - daylighted at rear (NE corner) / damp proofing OK | RICHB | RICHB | | BFD | C | 6014001 |
HIGH COUNTRY INTERNATIONAL LTD | BFN | C | 10/24/2018 | Footing observation received / stamped foundation design received - 3000 psf bearing capacity / formwork & reinforcement for foundation walls OK, ufer observed on West garage wall | RICHB | RICHB | | BFN | C | 6004290 |
HIGH COUNTRY INTERNATIONAL LTD | BFT | C | 10/24/2018 | Soils Report & Open Hole received - 3000 psf, 5% surface drainage, drain (usable) | RICHB | RICHB | | BFT | C | 6004287 |
HIGH COUNTRY INTERNATIONAL LTD | BFT | P | 10/15/2018 | Authorized 3rd party engineer inspections with all observation paperwork - ufer letter,soils and open hole letter to be picked up by inspector @ BFI or BFD inspection | RICHB | RICHB | | BFT | P | 5994230 |
HIGH COUNTRY INTERNATIONAL LTD | BFN | P | 10/15/2018 | Authorized 3rd party engineer inspections with all observation paperwork - ufer letter,soils and open hole letter to be picked up by inspector @ BFI or BFD inspection | RICHB | RICHB | | BFN | P | 5994228 |
WINTERS ELECTRIC, INC. | E= | C | 05/09/2019 | | JOHNN | JOHNN | | E= | C | 6194179 |
WINTERS ELECTRIC, INC. | E= | R | 05/08/2019 | all bath rooms need gfci, strap riser, kitchen counter outlets needs arc shields, bad LED light bulb outside of laundry, ----------------------------no appliances installed, 30 amp a/c,ok | JOHNN | JOHNN | | E= | R | 6192326 |
WINTERS ELECTRIC, INC. | ES | C | 01/09/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | JOHNN | JOHNN | | ES | C | 6073321 |
WINTERS ELECTRIC, INC. | ER | C | 01/09/2019 | rough,ok----------------------------ir ufer,no mcc,1#6 al, no floor heat, finished basement. | JOHNN | JOHNN | | ER | C | 6073308 |
KENT SHEET METAL, INC | H= | C | 05/15/2019 | note a/c complete, direct vent furn, finished basement, conditioned crawler | DAVIDH | DAVIDH | | H= | C | 6200265 |
KENT SHEET METAL, INC | HC | C | 01/16/2019 | RELEASE METER | TREVORH | TREVORH | | HC | C | 6079760 |
KENT SHEET METAL, INC | HRR | C | 01/16/2019 | At Final will need a ladder to access crawl space to verify supply and return grilles have been installed and locked in the half open position. NOTE; FINISHED BASEMENT, CONDITIONED CRAWL SPACE, DIRECT VENT FURNACE, OUTSIDE AIR TO FURNACE RETURN, A/C ROUGH COIL AND LINES ONLY. | TREVORH | TREVORH | | HRR | C | 6079756 |
ADEPT PLUMBING & HEATING LLC | HI | C | 01/10/2019 | 10 lb test ok note 1 1/4" main, 1 furnace,water heater , fireplace and bbq | DAVIDH | DAVIDH | | HI | C | 6074712 |
ADEPT PLUMBING & HEATING LLC | P= | C | 05/07/2019 | RP Back-flow in mech room to irrigation. | SAMH | SAMH | | P= | C | 6190738 |
ADEPT PLUMBING & HEATING LLC | PTO | C | 01/10/2019 | VTR (3), Sprinkler Back-flow in mech room. | SAMH | SAMH | | PTO | C | 6074173 |
ADEPT PLUMBING & HEATING LLC | PB | C | 11/09/2018 | | SHANEN | SHANEN | | PB | C | 6021669 |