ELDER CONSTRUCTION, INC. | B= | C | 01/30/2019 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6091755 |
ELDER CONSTRUCTION, INC. | B= | P | 01/18/2019 | with completed required inspections B= okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6083045 |
ELDER CONSTRUCTION, INC. | BSP | P | 12/07/2018 | abandoned floor penetrations grouted. | NATHAN | NATHAN | | BSP | P | 6046327 |
ELDER CONSTRUCTION, INC. | BFR | P | 11/20/2018 | all walls frame completed and okay with completed required inspections. =====core and penetrations at floor need inspection still.====== | NATHAN | NATHAN | | BFR | P | 6030639 |
ELDER CONSTRUCTION, INC. | BFR | P | 11/16/2018 | partial frame of rooms 109,111-119 per A.01with completed required inspections okay, =======need core repair and inspection of floors in rooms 110 new and patch old 109,115,123======= Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6027861 |
EL PASO ELECTRIC, LLC. | E= | C | 01/23/2019 | | BRIAN | BRIAN | | E= | C | 6085500 |
EL PASO ELECTRIC, LLC. | E= | P | 01/22/2019 | need to label the panel sch better for lighting and room # for 120 panel---------other corrections made | BRIAN | BRIAN | | E= | P | 6084375 |
EL PASO ELECTRIC, LLC. | E= | C | 01/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6068637 |
EL PASO ELECTRIC, LLC. | E= | C | 01/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6068636 |
EL PASO ELECTRIC, LLC. | ER | C | 01/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6068635 |
EL PASO ELECTRIC, LLC. | E= | P | 01/04/2019 | need 10 awg and 25 amp breaker to water heater---verify panel sch----- | BRIAN | BRIAN | | E= | P | 6068628 |
EL PASO ELECTRIC, LLC. | ER | P | 01/04/2019 | all ceilings ok except the data room--- | BRIAN | BRIAN | | ER | P | 6068622 |
EL PASO ELECTRIC, LLC. | ER | P | 11/20/2018 | rest of the walls--ok | BRIAN | BRIAN | | ER | P | 6030582 |
EL PASO ELECTRIC, LLC. | ER | P | 11/16/2018 | partial walls ---see plans---- | BRIAN | BRIAN | | ER | P | 6027724 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 01/30/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6091754 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/17/2019 | HYDRONIC PIPING FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6080720 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 01/11/2019 | PARTIAL FINAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 6076390 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 01/11/2019 | ALL MEDIUM PRESSURE TIE INS AND GRILLES ARE COMPLETE | JERRYF | JERRYF | | HD | P | 6076389 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 01/11/2019 | WILL COMPLETE INSPECTION WHEN CONTRACTOR CALLS INSPECTION | JERRYF | JERRYF | | H= | P | 6076386 |
FRONTIER MECHANICAL SYSTEMS INC | HWP+ | C | 01/11/2019 | PIPING OK | JERRYF | JERRYF | | HWP+ | C | 6076384 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 01/03/2019 | ABOVE CEILING MEDIUM PRESSURE DUCT AND TIE INS OK - NEED CONTRACTOR ATTACHED FOR HWP PIPING AND INSPECTION CALLED | JERRYF | JERRYF | | HD | P | 6067369 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 11/27/2018 | ABOVE CEILING LOW PRESSURE MAINS AND RUN OUTS OK - STILL NEED ALL MEDIUM PRESSURE TIE AND BOXES | JERRYF | JERRYF | | HD | P | 6035300 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/18/2019 | corrections made, engineer letter for aav sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 6083002 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 01/17/2019 | no hot water, can not have aav @ 45 needs to be vertical, need engineer letter for aav at sink | JOSEPHD | JOSEPHD | | P= | P | 6081615 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/04/2018 | water heater ok, revise plans or need engineers letter for aav at sink by final. | TAYLOR | TAYLOR | | PTO | C | 6042731 |