GOODWIN KNIGHT, LLC | B= | C | 10/01/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6725682 |
GOODWIN KNIGHT, LLC | B= | P | 09/30/2020 | pending competion of all other required inspections, building okay. Additional Inspections Required (computer generated): TEAM PLUMBING, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6724241 |
GOODWIN KNIGHT, LLC | B= | T | 09/29/2020 | PAID (REC#1717169): Trip for for TCO. Additional Inspections Required (computer generated): TEAM PLUMBING, INC. Mechanical Final Inspection is not Completed yet. | RITA | RITA | | B= | T | 6723180 |
GOODWIN KNIGHT, LLC | B= | P | 09/29/2020 | Temp CO: Pending mechanical final and building final ( Expires: 10/29/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6723162 |
GOODWIN KNIGHT, LLC | B= | P | 09/29/2020 | need to complete all other required inspections - fire caulk in com room / missing nails in hangars at deck above 201 / missing rated attic access door in 302 / missing plate covers in rated ceiling of mech room 101 -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): TEAM PLUMBING, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6722848 |
GOODWIN KNIGHT, LLC | BSP | P | 08/21/2020 | drywall install at 1st and 2nd floor breezeways and 1st floor mech rooms, okay | BOBF | BOBF | | BSP | P | 6681257 |
GOODWIN KNIGHT, LLC | BSP | P | 08/20/2020 | 2nd layer drywall install in all 2nd floor mech rooms and 1st layer drywall install all 1st floor mech rooms okay | BOBF | BOBF | | BSP | P | 6679620 |
GOODWIN KNIGHT, LLC | BSP | P | 08/18/2020 | penetration protection in units 101 and 104 okay at drop ceiling reas | BOBF | BOBF | | BSP | P | 6676698 |
GOODWIN KNIGHT, LLC | BSP | P | 08/18/2020 | 1st layer drywall install per L574 on ceiling of 1st and 2nd floor breezeways and 2nd floor mech rooms okay, drywall install per P522 in 3rd floor breezeways and mech rooms okay | BOBF | BOBF | | BSP | P | 6676690 |
GOODWIN KNIGHT, LLC | BSP | P | 08/17/2020 | drywall install at rated walls and ceilings all live units 1st floor okay | BOBF | BOBF | | BSP | P | 6674551 |
GOODWIN KNIGHT, LLC | BSP | P | 08/11/2020 | drywall install at rated walls and ceilings in all 2nd and 3rd floor live units okay | BOBF | BOBF | | BSP | P | 6668307 |
GOODWIN KNIGHT, LLC | BSP | P | 08/05/2020 | framing for rated drop ceilings per splice on 1st and 2nd floor mech rooms okay | BOBF | BOBF | | BSP | P | 6661715 |
GOODWIN KNIGHT, LLC | BIN | P | 08/03/2020 | insulation and RC channel all live units okay | BOBF | BOBF | | BIN | P | 6658744 |
GOODWIN KNIGHT, LLC | BFR | P | 07/29/2020 | items from previous inspection completed, all live units okay | BOBF | BOBF | | BFR | P | 6654188 |
GOODWIN KNIGHT, LLC | BFR | R | 07/21/2020 | Shims at trimmers throughout / fire protect to of chases behind tubs throughout / missing ledger locks at ledgers for decks throughout / unit 3o6 need puttypack at elec box common wall in bedroom / need to complete tub trap protection throughout / need to fire protect ceilings in concealed spaces on outside walls next to corridor units 103, 104, 203, 204, 303 and 304 / fire caulk 3 " pvc at laundry wall / need to repair dryer vent pipes and fire protect top plates in units 302 and 304 / pentration at bottom plate in bathroom wall unit 208 / unit 206, need penetration protection at AC line sets, plumbing lines at base plates of interior walls/ need fore protection at communications rooms, both towers / laundry rooms throughout missing pre rock and mineral wool / unit 201 provide stud shoes at studs for mech room common wall / provide mineral wool at at top plate aand concrete wall all units 1st floor / unit 103 need fire protection at vent fan pipe in bathroom | BOBF | BOBF | | BFR | R | 6644417 |
GOODWIN KNIGHT, LLC | BFR | P | 07/13/2020 | truss installation with laterals okay, eng letters for repairs on received | BOBF | BOBF | | BFR | P | 6634960 |
GOODWIN KNIGHT, LLC | BFR | R | 06/29/2020 | need truss details submitted and approved before truss inspection can be inspected | BOBF | BOBF | | BFR | R | 6620571 |
GOODWIN KNIGHT, LLC | BLA | C | 06/11/2020 | | JEREMYA | JEREMYA | | BLA | C | 6601873 |
GOODWIN KNIGHT, LLC | BLA | P | 06/08/2020 | north and east side only, south and southwest sides not ready. | NATHAN | NATHAN | | BLA | P | 6596435 |
GOODWIN KNIGHT, LLC | BSP | P | 05/27/2020 | drywall install at breezeway walls per WP 8105 both towers all floors okay | BOBF | BOBF | | BSP | P | 6584428 |
GOODWIN KNIGHT, LLC | BSP | P | 05/26/2020 | training with adam L - reviewed shear wall requirements and details | BOBF | BOBF | | BSP | P | 6582768 |
GOODWIN KNIGHT, LLC | BFR | P | 05/26/2020 | All interior type 1 shear walls separating front and rear units OK / Will inspect all remaining interior shear walls with penetration protection at frame / Training with Bob F / Reviewed interior shear walls and inspection strategies to maximize efficiency and time | ADAML | ADAML | | BFR | P | 6582564 |
GOODWIN KNIGHT, LLC | BFR | P | 05/08/2020 | type 1 shear walls at corridors both towers okay | BOBF | BOBF | | BFR | P | 6566067 |
GOODWIN KNIGHT, LLC | BSP | R | 05/05/2020 | shear wall type 1 are 6"oc throughout, | BOBF | BOBF | | BSP | R | 6560822 |
GOODWIN KNIGHT, LLC | BFR | P | 03/23/2020 | exterior shear okay | BOBF | BOBF | | BFR | P | 6518352 |
GOODWIN KNIGHT, LLC | BE | L | 10/16/2019 | Okay to reopen for NO FEE per MattM | NELIDA | NELIDA | | BE | L | 6371022 |
GOODWIN KNIGHT, LLC | BSP | T | 12/12/2018 | PAID (REC#1563054) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Revised floor assembly | SHELLEY | SHELLEY | | BSP | T | 6050283 |
COLORADO SECURITY, LLC | E= | C | 09/25/2020 | FIRE ALARM INSPECTION: riser room --ok / | BRIAN | BRIAN | | E= | C | 6720547 |
DIE HARD, INC | E= | C | 09/24/2020 | 205--206--207--208---305--306--307--308---ok / | BRIAN | BRIAN | | E= | C | 6718576 |
DIE HARD, INC | E= | P | 09/23/2020 | all ac units--ok / units 105--106--ok / | BRIAN | BRIAN | | E= | P | 6717052 |
DIE HARD, INC | E= | P | 09/22/2020 | units 201--202--203--204--301--302--303--304--ok ---south tower | BRIAN | BRIAN | | E= | P | 6715022 |
DIE HARD, INC | E= | P | 09/21/2020 | units 101--102--ok / | BRIAN | BRIAN | | E= | P | 6713169 |
DIE HARD, INC | E= | R | 09/17/2020 | canceled by contractor | BRIAN | BRIAN | | E= | R | 6709131 |
DIE HARD, INC | E= | R | 09/14/2020 | not ready | BRIAN | BRIAN | | E= | R | 6704839 |
DIE HARD, INC | ES | C | 05/26/2020 | Commercial Service: 1200 amp 3-w --ok to set meters in ----100--101--102--105--201--202--203--204--205--206--207--208--301--302--303--304--305--306--307--308---and house panel-- all 100 anp 3-w /----ufer access needed / | BRIAN | BRIAN | | ES | C | 6583107 |
DIE HARD, INC | ES | P | 05/22/2020 | Commercial Service: 1200 3-4 --ok up to main / ok to energize / | BRIAN | BRIAN | | ES | P | 6581476 |
COLORADO SECURITY, LLC | ER | P | 05/22/2020 | FIRE ALARM INSPECTION: all units--ok / need riser room for final | BRIAN | BRIAN | | ER | P | 6581398 |
DIE HARD, INC | E= | R | 05/20/2020 | electrical ok / need fire alarm permit and installed ----/ 106 --ok | BRIAN | BRIAN | | E= | R | 6578771 |
DIE HARD, INC | ER | R | 05/14/2020 | all hallways and units except 106 needs bath fans installed and wired / still need fire alarm installed | BRIAN | BRIAN | | ER | R | 6572472 |
DIE HARD, INC | ER | R | 05/13/2020 | units 201-202-203-204-301-302-303- ok / 304 needs ko plug in panel 308 not ready / ----need fire alarm installed / | BRIAN | BRIAN | | ER | R | 6570964 |
DIE HARD, INC | ER | P | 05/12/2020 | units 205--206--207--208--305--306--307--ok / no breeze ways | BRIAN | BRIAN | | ER | P | 6569436 |
DIE HARD, INC | EUG | C | 04/30/2020 | pole light feeds and bases on buildings 1818-1834--ok | BRIAN | BRIAN | | EUG | C | 6557738 |
DIE HARD, INC | EUG | R | 11/05/2019 | rebar ufer is for building to look at or engineer to sign off on / | MIGUEL | MIGUEL | | EUG | R | 6389338 |
TEAM PLUMBING, INC. | H= | C | 10/01/2020 | GAS FINAL OK, METER VERIFICATION LETTER RECEIVED FROM C.S.U. | BENH | BENH | | H= | C | 6725681 |
TEAM PLUMBING, INC. | H= | P | 09/25/2020 | BUILDING 7: GAS FINAL OK PENDING METER VERIFICATION LETTER FROM C.S.U. | BENH | BENH | | H= | P | 6719367 |
STEELE BROS. HEATING, INC | H= | C | 09/25/2020 | BUILDING 7: NORTH AND SOUTH TOWER UNITS AND MECHANICAL ROOMS OK, MECHANICAL FINAL OK | BENH | BENH | | H= | C | 6719358 |
STEELE BROS. HEATING, INC | H= | P | 09/24/2020 | BUILDING 7: SOUTH TOWER ALL UNITS OK, STILL NEED TO SEE NORTH TOWER TO COMPLETE THIS BUILDING FOR MECHANICAL | BENH | BENH | | H= | P | 6718193 |
STEELE BROS. HEATING, INC | HD | C | 09/08/2020 | BUILDING 7: INSPECTION WAS FOR ANNULAR SPACING FOR CEILING RADIATION DAMPERS TO SHEET ROCK, ALL NORTH AND SOUTH UNITS OK | BENH | BENH | | HD | C | 6698945 |
STEELE BROS. HEATING, INC | HD | P | 09/01/2020 | BUILDING 7: INSPECTION WAS FOR A UNITS BELOW PRE ROCK ON 1ST FLOOR NORTH AND SOUTH TOWERS, NEED ANNULAR SPACE INSPECTION FOR CEILING RADIATION DAMPERS ON ALL FLOORS NORTH AND SOUTH UNITS | BENH | BENH | | HD | P | 6692167 |
STEELE BROS. HEATING, INC | HRP | C | 08/05/2020 | BUILDING 7: ALL NORTH AND SOUTH TOWER PRESSURE TEST OK FOR ALL REFRIGERANT LINES | BENH | BENH | | HRP | C | 6661487 |
STEELE BROS. HEATING, INC | HRP | P | 07/29/2020 | LOW TEST ON UNITS: 207,208,306,307,AND 308, REST OF UNITS IN NORTH AND SOUTH TOWER OK | BENH | BENH | | HRP | P | 6653721 |
STEELE BROS. HEATING, INC | HV | P | 07/28/2020 | BUILDING 7: INSPECTION TODAY WAS FOR RE INSPECT ON VENTS FROM PREVIOUS INSPECTION ON 1 ST AND 2 ND FLOOR IN SOUTH TOWER AND ALL 3 FLOORS ON NORTH TOWER, STILL NEED TO SEE FINAL CONNECTIONS TO FURNACE | BENH | BENH | | HV | P | 6652084 |
STEELE BROS. HEATING, INC | HD | P | 07/28/2020 | BUILDING 7: INSPECTION TODAY WAS FOR SUPPLY AND EXHAUST DUCT AND DRYER VENT ABOVE CEILING ON NORTH AND SOUTH TOWERS FOR ALL 3 FLOORS AND ALL MECHANICAL ROOM CEILING RADIATION DAMPERS ABOVE CEILING ON NORTH AND SOUTH TOWERS FOR ALL 3 FLOORS, STILL NEED HRP INSPECTION FOR ALL LINE SETS | BENH | BENH | | HD | P | 6652082 |
STEELE BROS. HEATING, INC | HV | P | 06/25/2020 | SOUTH TOWER 1ST AND 2ND FLOOR VENTS ARE BACKGRADED WHERE THEY TIE IN TO CONCENTRIC AND NEED TO SUPPORT FURNACE VENT EVERY 3 FEET, ALL 3RD FLOOR UNITS VENTS OK | BENH | BENH | | HV | P | 6617083 |
STEELE BROS. HEATING, INC | HD | P | 06/25/2020 | THIS INSPECTION WAS FOR SOUTH TOWER SUPPLY AND BATH EXHAUST AND DRYER VENT ABOVE PRE ROCK: 1ST AND SECOND FLOOR DRYER VENT NEEDS TO BE SUPPORTED EVERY 4 FEET, LINE SET IN CONCEALED WALLS TO BE INSULATED AND HRP PRESSURE TEST TO BE CALLED IN, NEED NAIL PROTECTION FOR LINE SET PENETRATING FLOOR OUTSIDE MECHANICAL ROOMS, ALL 3RD FLOOR UNITS SUPPLY AND EXHAUST ABOVE PRE ROCK OK | BENH | BENH | | HD | P | 6617080 |
TEAM PLUMBING, INC. | HC | C | 05/04/2020 | RELEASE METER 20 METERS FOR THIS ADDRESS THANKS | BENH | BENH | | HC | C | 6559473 |
TEAM PLUMBING, INC. | HI | C | 05/04/2020 | 10- 10 LB TEST OK GAS INSTALLED PER SPLICE ON PAGE 255 | BENH | BENH | | HI | C | 6559472 |
TEAM PLUMBING, INC. | HI | P | 05/01/2020 | 10-10 LB TEST OKFOR SOUTH TOWER, STILL NEED TO INSPECT NORTH TOWER, GAS INSTALLED PER SPLICE ON PAGE 255 | BENH | BENH | | HI | P | 6557935 |
STEELE BROS. HEATING, INC | HSP | P | 04/28/2020 | LETTER FROM ENGINEER ADDRESSING NO NEED FOR FURNACE SHUTDOWNS, SEE IMAGES | BENH | BENH | | HSP | P | 6553234 |
TEAM PLUMBING, INC. | P= | C | 09/23/2020 | this completes all plbg phases | JOHNS | JOHNS | | P= | C | 6716826 |
TEAM PLUMBING, INC. | PTO | C | 06/25/2020 | ok for water closets, tubs, and accessible measurements | JOHNS | JOHNS | | PTO | C | 6617352 |
TEAM PLUMBING, INC. | PTO | C | 05/04/2020 | inspector entered results off site due to internet connection issues
ok for middle tower dwv
ok for all main waters
ok for all unit waters
STILL NEED flanges set, all tubs tested, and all accessible measurements | JOHNS | JOHNS | | PTO | C | 6560252 |
TEAM PLUMBING, INC. | PTO | P | 05/01/2020 | inspector entered results off site due to no internet access
ok for north and south tower dwv only
ok for main and unit waters test only (still need inspection)
NOTE: vtr, ALL main floor units= TYPE B OPTION A, check water htrs and water entry @ final, hose bib valves @ (1)- water entry, (1)- 106 mech, and (2)- 105 laundry ceiling, @ 101 aav- washer box (left side), f.d. (left laundry wall), and in mech (left side), @ 106 aav- washer box (right side), f.d. (right laundry wall), and mech (right side), @ 203 aav- waher box (right side), @ 301 aav- mech (right side), @ 102 aav- mech front left wall, washer box (left side), washer floor drain (right wall), @ 105 aav- washer box (left side), washer floor drain (left wall) and mech (right wall). @ 205 aav- washer box (right side), @ 202 aav- washer box (right side), @ 204 aav- washer box (right side), and @ 204 aav- washer floor drain (in wall right side of washer box)
STILL NEED center tower dwv, all main water and all unit waters, all tubs, all 1st floor flanges set, and all accessible measurements | JOHNS | JOHNS | | PTO | P | 6558431 |
TEAM PLUMBING, INC. | PB | C | 05/01/2020 | inspector entered results off site due to no internet access | JOHNS | JOHNS | | PB | C | 6558414 |
TEAM PLUMBING, INC. | PB | P | 12/31/2019 | Need water stub. Upper level corrections ok. | DANR | DANR | | PB | P | 6440875 |
TEAM PLUMBING, INC. | PB | P | 12/30/2019 | Upper level inspection: Hydraulic jump 2" stack by column 2 and 3" stack by column 3, need water stub, rest ok. | DANR | DANR | | PB | P | 6439140 |
TEAM PLUMBING, INC. | PB | P | 11/21/2019 | east side stacks ok. | TAYLOR | TAYLOR | | PB | P | 6407602 |
TEAM PLUMBING, INC. | PB | P | 10/22/2019 | lower section of building ok west side, still need to see east side completed | JOSEPHD | JOSEPHD | | PB | P | 6376204 |
GOODWIN KNIGHT, LLC | XBS | T | 07/10/2020 | PAID (REC#1694935): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 6633116 |
GOODWIN KNIGHT, LLC | XBS | P | 01/29/2020 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Structural plans for enlarged water entry room | SHELLEY | SHELLEY | | XBS | P | 6468320 |
GOODWIN KNIGHT, LLC | XBS | T | 11/25/2019 | PAID (REC#1660341): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Clarify penetrations at Mech. closet | MICHAELA | MICHAELA | | XBS | T | 6410045 |
GOODWIN KNIGHT, LLC | XES | T | 11/01/2019 | PAID (REC#1660342): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise service one line | SHELBY | SHELBY | | XES | T | 6385624 |
GOODWIN KNIGHT, LLC | XES | T | 10/29/2019 | PAID (REC#1660344): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised service lateral and revised fault current calcs. | BERTHA | BERTHA | | XES | T | 6383225 |
GOODWIN KNIGHT, LLC | XPS | T | 08/29/2019 | PAID (REC#1660345): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 8/29/19: Delta 11 revisions P1.0-7 main level DWV plan, P1.0-7a new page added (underground plumbing plan) | SHANEN | SHANEN | | XPS | T | 6318146 |
GOODWIN KNIGHT, LLC | XBS | T | 06/05/2019 | PAID (REC#1625539): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Clarify rated assemblies | MICHAELA | MICHAELA | | XBS | T | 6220611 |
GOODWIN KNIGHT, LLC | XES | T | 04/18/2019 | PAID (REC#1591448): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting. | BERTHA | BERTHA | | XES | T | 6170016 |
GOODWIN KNIGHT, LLC | XBS | T | 04/16/2019 | PAID (REC#1591238): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise assemblies - details | MICHAELA | MICHAELA | | XBS | T | 6167436 |
GOODWIN KNIGHT, LLC | XPS | P | 04/10/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 4/10/19: Delta 10 revision re-route 6" building drain | SHANEN | SHANEN | | XPS | P | 6161278 |
GOODWIN KNIGHT, LLC | XES | T | 04/05/2019 | PAID (REC#1588916) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting. | BERTHA | BERTHA | | XES | T | 6156113 |
GOODWIN KNIGHT, LLC | XPS | T | 03/28/2019 | PAID (REC#1586177) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 3/28/19: Building type 4 new pages inserted P0.1-7, P0.2-7, P0.3-7, P0.4-7 P1.0-7, P3.0-7, P3.1-7, P3.1a-7, P3.2-7, P3.3-7 | SHANEN | SHANEN | | XPS | T | 6147945 |
GOODWIN KNIGHT, LLC | XMS | T | 03/25/2019 | PAID (REC#1585558) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | T | 6142699 |
GOODWIN KNIGHT, LLC | XMS | T | 02/13/2019 | PAID (REC#1576240): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | T | 6106394 |
GOODWIN KNIGHT, LLC | XBS | T | 02/12/2019 | PAID (REC#1575906) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise wall assembly | MICHAELA | MICHAELA | | XBS | T | 6104818 |
GOODWIN KNIGHT, LLC | XMS | T | 01/28/2019 | PAID (REC#1575906) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: DELTA 5 | DALEH | DALEH | | XMS | T | 6090466 |
GOODWIN KNIGHT, LLC | XES | P | 10/29/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised service - removed disconnects and note about let through current. Added door holds. Added heat in water entry room. | BERTHA | BERTHA | | XES | P | 6009112 |
GOODWIN KNIGHT, LLC | XBS | P | 10/29/2018 | PLAN SPLICE FEE: $0 by: LBENNETT for Construction: Added riser room; added header callouts | LBENNETT | LBENNETT | | XBS | P | 6009085 |
GOODWIN KNIGHT, LLC | XMS | T | 10/29/2018 | PAID (REC#1551856) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 3 | DALEH | DALEH | | XMS | T | 6009072 |