KEY CONSTRUCTION | B= | C | 02/21/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6112870 |
KEY CONSTRUCTION | B= | P | 02/19/2019 | complete other finals -- corrections complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6110753 |
KEY CONSTRUCTION | B= | R | 02/15/2019 | complete all other finals -- sink in women's bathroom does not comply/only 58" to lav from toilet side wall -- floor surface past front door entry has 1/2" deep channel in front and sides of entry -- pending completion of core and shell. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | R | 6108863 |
AIRTECH MECHANICAL, INC. | BSP | T | 01/17/2019 | PAID (REC#1570319) ADDITIONAL PLAN REVIEW TIME: $50 From: JUSTINC Revised gas for 2 PSI | JUSTINC | JUSTINC | | BSP | T | 6081492 |
KEY CONSTRUCTION | BFR | P | 12/04/2018 | waiter area walls are framed 48" in height and not extend to roof deck per approved design / missing 48" in height island walls at passage - dining area / storage room and restroom walls do not extend to roof deck per approved design / need to attach electrical to permit and complete other rough inspections - including mechanical for hood wall / reviewed accessible elements with site rep | BRIANB | BRIANB | | BFR | P | 6042697 |
NOBEL ELECTRIC LLC | E= | C | 02/08/2019 | interior finish complete | CHIPO | CHIPO | | E= | C | 6101675 |
NOBEL ELECTRIC LLC | ES | P | 01/29/2019 | Commercial Service: 400 amp 120 / 208 ---- ok to set CT's and meter | TOMC | TOMC | | ES | P | 6090821 |
NOBEL ELECTRIC LLC | ER | P | 12/21/2018 | Walls and hard lid ceilings ok / Discussed ansi 117 requirements with contractor / | ROB | ROB | | ER | P | 6061245 |
AIRTECH MECHANICAL, INC. | H= | C | 02/21/2019 | CORRECTIONS MADE ( SEE IMAGES) | LIDO | LIDO | | H= | C | 6112869 |
AIRTECH MECHANICAL, INC. | H= | P | 02/20/2019 | PARTIAL PENDING: FIRE ROPE FOR KEF-1 FAN AT DROP IS NOT FULLY ATTACHED TO THE GREASE DUCT/ ROPE IS HANGING DOWN INSIDE DUCT, SEAL EDGE OF GREASE DUCT DROP AT CURB.OK FOR CONTRACTOR TO ATTACH PICTURES TO NEXT INSPECTION REQUEST. | LIDO | LIDO | | H= | P | 6111995 |
AIRTECH MECHANICAL, INC. | H= | P | 02/15/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) STILL NEED THE CORRECTIONS LISTED FROM INSPECTION FROM 2/14/19 / OK FOR CONTRACTOR TO ATTACH PICTURES TO NEXT INSPECTION REQUEST.
| LIDO | LIDO | | H= | P | 6108268 |
AIRTECH MECHANICAL, INC. | H= | P | 02/14/2019 | PARTIAL PENDING :NEED THE FOLLOWING ITEMS - TEST AND BALANCE REPORT, LABEL THERMOSTATS, SEAL TOP OF MAKE UP AIR DUCT IN KITCHEN, ADD SUPPORT TO WATER HEATER VENT ABOVE CEILING, KEF-1 EXHAUST FAN EXTENSION ON ROOF, NEED FIRE ROPE IN PLACE FOR KEF-1 EXHAUST FAN BETWEEN GREASE DUCT DROP AND FAN , SEAL EDGE OF GREASE DUCT DROP AT CURB , | LIDO | LIDO | | H= | P | 6107907 |
AIRTECH MECHANICAL, INC. | HI | P | 02/11/2019 | NEED REVISED GAS PLAN TO SHOW WHAT OUTLET SIZES ARE REQUIRED FOR THE COOK LINE EQUIPMENT.GAS FINAL CONNECTION TO EQUIPMENT AND RESTRAINTS OK. | LIDO | LIDO | | HI | P | 6103634 |
AIRTECH MECHANICAL, INC. | H= | P | 02/11/2019 | NEED FAN EXTENSION FOR KEF-1, NEED TO LABEL CONDENSERS ON THE ROOF FOR COOLER/ FREEZER. NEED REFRIGERATION CALCS FOR COOLER/FREEZER / PLAN PAGE M-2 (BDA 5) SHOWS LEAK DETECTION/ AND MONITORING SYSTEM TO BE INSTALLED /THIS IS NOT INSTALLED . GREASE DUCT ACCESS DOOR IS NOT COMPLETE . NEED TO SEAL MAKE UP AIR DUCT IN KITCHEN , NEED TO LABEL THERMOSTATS. WATER HEATER VENT IS LESS THAN 8 FEET FROM PARAPET REFER TO HSP NOTES .NEED TEST AND BALANCE REPORT. DUCT ROUGH AND GRILLS AND REGISTERS FINAL CONNECTIONS OK .INTERLOCKS OK.
| LIDO | LIDO | | H= | P | 6103631 |
AIRTECH MECHANICAL, INC. | HSP | P | 02/11/2019 | WATER HEATER VENT IS LESS THAN 8 FEET FROM THE PARAPET WALL . REFER TO 2009 IFGC 503.6.4 SECTION . | LIDO | LIDO | | HSP | P | 6103042 |
AIRTECH MECHANICAL, INC. | HSP | P | 02/04/2019 | ON SITE CONSULT WITH CONTRACTOR ABOUT WATER HEATER VENT TERMINATION ON ROOF. | LIDO | LIDO | | HSP | P | 6096529 |
AIRTECH MECHANICAL, INC. | HC | C | 01/29/2019 | OK TO RELEASE 2lb GAS METER / ADDED GAS LOAD TO ALREADY SET METER IS 1,425,000 BTU'S . | LIDO | LIDO | | HC | C | 6090723 |
AIRTECH MECHANICAL, INC. | HI | P | 01/28/2019 | NEED REVISED GAS PLAN TO SHOW WHAT OUTLET SIZES ARE REQUIRED FOR THE COOK LINE EQUIPMENT . NEED TO CAP ALL COOK LINE GAS OUTLETS. NEED TO LABEL ALL MEDIUM PRESSURE GAS. NEED INSTALLATION INSTRUCTIONS FOR GAS REGULATORS. 10 lb TEST OK GAS PIPE INSTALL ON ROOF AND INSIDE BUILDING UP TO COOK LINE ADS WATER HEATER OK.(STILL NEED NEED FINAL GAS CONNECTIONS TO EQUIPMENT AND EQUIPMENT RESTRAINTS ) | LIDO | LIDO | | HI | P | 6090030 |
AIRTECH MECHANICAL, INC. | HD | P | 01/08/2019 | FINAL GREASE DUCT LIGHT INSPECTION OK / OK TO APPLY FIRST LAYER AND SECOND LAYER OF WRAP , PROVIDE PICTURES TO INSPECTOR OF THE FIRST LAYER . | LIDO | LIDO | | HD | P | 6071534 |
AIRTECH MECHANICAL, INC. | HD | P | 01/04/2019 | GREASE DUCT LIGHT TEST: CURB DROP OK / OK TO APPLY 1ST AND SECOND LAYER OF WRAP / PROVIDE PICTURES OF 1ST AND 2ND LAYER OF WRAP TO INSPECTOR . HORIZONTAL GREASE DUCT LIGHT TEST OK . STILL NEED TO INSPECT TWO CONNECTIONS TO HOOD AND DROP CONNECTION TO TOP OF STACK ELBOW ON HORIZONTAL DUCT . | LIDO | LIDO | | HD | P | 6069349 |
AIRTECH MECHANICAL, INC. | HD | P | 12/28/2018 | GREASE DUCT LIGHT INSPECTION : MORE THAN SIX HOLES STOPPED INSPECTION / RE-INSPECT ALL. IT IS OK FOR GREASE DUCT DROP TO BE LIGHT TESTED PRIOR TO INSTALLATION THROUGH CURB AND PICTURES OF 1ST AND 2ND LAYER OF WRAP PROVIDED TO THE INSPECTOR . ( FIRE WRAP INSTALLATION INSTRUCTIONS WILL NEED TO BE PROVIDED FOR FIRE WRAP INSPECTION ) | LIDO | LIDO | | HD | P | 6064962 |
AIRTECH MECHANICAL, INC. | HD | P | 12/26/2018 | WALL BEHIND KITCHEN HOOD OK. | LIDO | LIDO | | HD | P | 6063037 |
RR PLUMBING | P= | C | 02/13/2019 | correction made | TED | TED | | P= | C | 6105827 |
RR PLUMBING | P= | P | 02/07/2019 | need tempering valve on hand sinks, install missing insulation on water piping, need 5 foot clearance to lav from toilet side wall, | TED | TED | | P= | P | 6100843 |
RR PLUMBING | PTO | C | 12/26/2018 | correction made | TED | TED | | PTO | C | 6062226 |
RR PLUMBING | PTO | P | 12/21/2018 | waiter area hand sink vent below flood rim of sink, need hot water return line at sushi bar sink wall, closet rings are over 18'' from side wall (22''), test ok dwv ok | TED | TED | | PTO | P | 6061259 |
RR PLUMBING | PB | C | 11/17/2018 | Underground ok. | DANR | DANR | | PB | C | 6028817 |
RR PLUMBING | PB | T | 11/16/2018 | PAID (REC#1557006) AFTER-HOURS INSPECTION: $200 From: TERRI 11/17/18 AM | TERRI | TERRI | | PB | T | 6028191 |
RR PLUMBING | PB | P | 11/16/2018 | Field cancel via phone call. | DANR | DANR | | PB | P | 6027764 |
RR PLUMBING | PB | P | 11/15/2018 | Re-grade and bed all sanitary and grease piping, missing 2 floor sinks on grease, add all work to scope missing 2 toilets - 1 urinal - 8 floor sinks - 2 floor drains, ok to bury West grease deep trunk line. | DANR | DANR | | PB | P | 6027270 |
RR PLUMBING | PB | R | 11/14/2018 | Not ready, need proper test on underground piping, re-inspect all. | DANR | DANR | | PB | R | 6025625 |
AIRTECH MECHANICAL, INC. | XMS | T | 02/11/2019 | PAID (REC#1575552) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 5 ref. calcs | DALEH | DALEH | | XMS | T | 6103914 |
AIRTECH MECHANICAL, INC. | XMS | T | 02/11/2019 | PAID (REC#1575370) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical new splice pages per inspector request adjusted schedule and Iso, | TCRIPPEN | TCRIPPEN | | XMS | T | 6102998 |
AIRTECH MECHANICAL, INC. | XMS | T | 01/02/2019 | PAID (REC#1566816) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 2 | DALEH | DALEH | | XMS | T | 6066916 |
KEY CONSTRUCTION | XBS | T | 12/11/2018 | PAID (REC#1562686) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised wall height in several locations and removed wall in dining. | SHELLEY | SHELLEY | | XBS | T | 6048822 |