JM WESTON HOMES LLC | B= | C | 03/26/2019 | | NICK | NICK | | B= | C | 6144741 |
JM WESTON HOMES LLC | BFR | C | 03/26/2019 | ASW 1000 shaft wall spliced into plans | NICK | NICK | | BFR | C | 6144138 |
JM WESTON HOMES LLC | BIN | C | 03/26/2019 | Insulation certification on file | NICK | NICK | | BIN | C | 6144137 |
JM WESTON HOMES LLC | BFN | C | 03/26/2019 | Eng observation on file for post tension | NICK | NICK | | BFN | C | 6144134 |
JM WESTON HOMES LLC | BFR | P | 02/11/2019 | Still need fix for shaft wall system installed, approved plans call for U375, USG shaft installed / Still need 3rd party observation for post tension / All other framing items completed | NICK | NICK | | BFR | P | 6103499 |
JM WESTON HOMES LLC | BFR | P | 02/08/2019 | Approved plans call for U375, USG shaft system installed / Clean out B vent chase / Still need 3rd party observations for post tension | NICK | NICK | | BFR | P | 6101906 |
JM WESTON HOMES LLC | BSP | P | 02/04/2019 | Double layer 5/8 rock at soffits OK / Still need all 3rd party observation for post tension | NICK | NICK | | BSP | P | 6096740 |
JM WESTON HOMES LLC | BSP | P | 01/18/2019 | Porch lid and post OK / Shear and hold downs OK / Still need 3rd party observation reports for post tension | NICK | NICK | | BSP | P | 6083048 |
JM WESTON HOMES LLC | BFN | P | 01/17/2019 | Foundation design on file / Open hole on file / Still need 3rd party observation reports / #2000psf / No drain required | NICK | NICK | | BFN | P | 6080798 |
JM WESTON HOMES LLC | BFI | P | 11/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFI | P | 6021181 |
JM WESTON HOMES LLC | BFD | P | 11/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFD | P | 6021180 |
JM WESTON HOMES LLC | BFT | P | 11/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 6021179 |
JM WESTON HOMES LLC | BFN | P | 11/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 6021178 |
PEAK ELECTRIC INC. | E= | C | 03/21/2019 | corrections made / | MIGUEL | MIGUEL | | E= | C | 6140352 |
PEAK ELECTRIC INC. | E= | R | 03/20/2019 | grd metal cut in box in both LV panels,--------------------------30 amp a/c prewire only, | JOHNN | JOHNN | | E= | R | 6138022 |
PEAK ELECTRIC INC. | ES | C | 02/06/2019 | Residential Overhead: 200-amp 3 Wire New Residence ok to set meter. / | JOHNN | JOHNN | | ES | C | 6099149 |
PEAK ELECTRIC INC. | ER | C | 02/06/2019 | --------------------------------notes: no mcc, rev ufer, 1#8al, | JOHNN | JOHNN | | ER | C | 6099128 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 03/22/2019 | | MATTM | MATTM | | H= | C | 6141287 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | R | 03/22/2019 | THIS DOES NOT APPEAR TO BE THE CONDENSATE DRAIN. WILL NEED ONSITE INSPECTION. | MATTM | MATTM | | H= | R | 6140602 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 03/21/2019 | TANKLESS WATER HEATER IS MISSING CONDENSATE DRAIN, OK TO ATTACH PICTURE TO NEXT INSPECTION REQUEST NOTES: NO OUTSIDE AIR TO FURNACE RETURN, DIRECT VENT FURNACE, DIRECT VENT TANKLESS WATER HEATER, A/C ROUGH COIL AND LINESET, NO FIREPLACE | MATTM | MATTM | | H= | P | 6140249 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 03/21/2019 | RECEIVED DUCT LEAKAGE REPORT FROM CONTRACTOR, SEE IMAGES. | MATTM | MATTM | | H= | P | 6139178 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 03/19/2019 | RECEIVED COIL CHANGE OF EQUIPMENT LETTER FROM CONTRACTOR, SEE IMAGES. | MATTM | MATTM | | H= | P | 6136247 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 02/07/2019 | RELEASE METER | PAULO | PAULO | | HC | C | 6100286 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 02/07/2019 | NEEDED BY FINAL-- CHANGE OF EQUIPMENT LETTER FOR COIL. note: no outside air to return, direct vent furnace, direct vent tank less water heater, a/c rough and line set. SEE IMAGES. | PAULO | PAULO | | HRR | C | 6100285 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 02/05/2019 | need proper support to dryer exhaust duct (attach photos to permit and recall for inspection). NEEDED BY FINAL-- CHANGE OF EQUIPMENT LETTER FOR COIL. note: no outside air to return, direct vent furnace, direct vent tank less water heater, a/c rough and line set. | PAULO | PAULO | | HRR | P | 6098421 |
L & L GAS SHOP, LLC. | HI | C | 01/30/2019 | 10# test ok. note: 1 1/4" main at 60' to 1- furnace, 1- tank less water heater and 1- range. | PAULO | PAULO | | HI | C | 6092800 |
TRADITIONAL PLUMBING AND HEATING LLC | P= | C | 03/25/2019 | note: no irigation | JOSEPHD | JOSEPHD | | P= | C | 6143135 |
TRADITIONAL PLUMBING AND HEATING LLC | PTO | C | 01/29/2019 | corrections made | JOSEPHD | JOSEPHD | | PTO | C | 6090866 |
TRADITIONAL PLUMBING AND HEATING LLC | PTO | P | 01/28/2019 | need to support meter yolk by water heater, and nail protection at 2" in garage for lav, rest ok note: no irrigation, aav @ 1 master lav, cwv @ 1 master lav, | JOSEPHD | JOSEPHD | | PTO | P | 6089888 |
TRADITIONAL PLUMBING AND HEATING LLC | PB | C | 12/12/2018 | | MALYNDA | MALYNDA | | PB | C | 6050208 |
TRADITIONAL PLUMBING AND HEATING LLC | PB | P | 11/13/2018 | Stub-ins OK | SHANEN | SHANEN | | PB | P | 6023907 |