COLORADO STRUCTURES INC | B= | C | 05/03/2019 | | NICK | NICK | | B= | C | 6186758 |
COLORADO STRUCTURES INC | B= | P | 04/03/2019 | Temp CO: need zoning mech and building ( Expires: 5/3/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6154018 |
COLORADO STRUCTURES INC | B= | P | 04/03/2019 | Need to complete roof of drive up area / All other aspects of final OK / Need mechanical final complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6153927 |
COLORADO STRUCTURES INC | BLA | C | 03/26/2019 | | NICK | NICK | | BLA | C | 6144534 |
COLORADO STRUCTURES INC | B= | P | 03/19/2019 | Need to install accessible check writing station / Need to install all doors and hardware for all offices / Need to complete all exterior addition elements for drive through bank teller area / Need to complete all other finals / Need sweet #'s installed -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), GDS ELECTRIC Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet, ROCKY MOUNTAIN PIPING & PLUMBING INC. Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6137103 |
COLORADO STRUCTURES INC | BFR | C | 03/19/2019 | | NICK | NICK | | BFR | C | 6137075 |
COLORADO STRUCTURES INC | BFN | C | 03/19/2019 | | NICK | NICK | | BFN | C | 6137074 |
COLORADO STRUCTURES INC | BFT | C | 03/19/2019 | | NICK | NICK | | BFT | C | 6137064 |
COLORADO STRUCTURES INC | BFR | P | 03/11/2019 | All dropped lid framing for canopy OK / Column wrap framing OK per approved design | NICK | NICK | | BFR | P | 6130266 |
COLORADO STRUCTURES INC | BIN | P | 02/14/2019 | drive up teller wall insulation okay | NATHAN | NATHAN | | BIN | P | 6107246 |
COLORADO STRUCTURES INC | BFR | P | 02/12/2019 | Eng on file for steel welding and bolting | NICK | NICK | | BFR | P | 6104214 |
COLORADO STRUCTURES INC | BFR | P | 02/11/2019 | Framing for drive up teller exterior wall area OK | NICK | NICK | | BFR | P | 6103226 |
COLORADO STRUCTURES INC | BFR | P | 02/05/2019 | frame of non structural steel studs for parapet at drive through OK | NICK | NICK | | BFR | P | 6098210 |
COLORADO STRUCTURES INC | BSP | P | 01/28/2019 | Met on site with Steve from CSI / Letter from architect on site for use of V455 shaft wall system in place of U415 system, reviewed need to splice new listing into plans / V455 shaft wall system is american gyp listing | NICK | NICK | | BSP | P | 6090082 |
COLORADO STRUCTURES INC | BFR | R | 01/17/2019 | Inspection for U415 shaft wall at existing elevator / American shaft installed, U415 listing is for USG shaft wall system / Please recall inspection | NICK | NICK | | BFR | R | 6081287 |
COLORADO STRUCTURES INC | BFN | P | 01/10/2019 | foundation wall and pilasters at A-B 1-2, partial C-C.2 1.3-1.7 | NATHAN | NATHAN | | BFN | P | 6074380 |
COLORADO STRUCTURES INC | BFT | P | 01/10/2019 | observation letter for footers A-B 1-2 on file, footer observation on 12-18-18 | NATHAN | NATHAN | | BFT | P | 6074368 |
COLORADO STRUCTURES INC | BSP | P | 01/07/2019 | ADDITIONAL PLAN REVIEW TIME: (No Fee) From: BECKYA Added restrooms to work scope.reviewed by Brett on 1/4 | BECKYA | BECKYA | | BSP | P | 6070195 |
COLORADO STRUCTURES INC | BFR | P | 01/02/2019 | Interior finish framing OK per approved plans / Still need to inspect exterior addition framing once installed / Gave OK to use 3rd party for footing/foundation for addition / Still need to inspect Shaft in fill at existing elevator per U415 listing once installed / Reviewed accessible elements / Need all MEP's complete | NICK | NICK | | BFR | P | 6066748 |
GDS ELECTRIC | E= | C | 04/03/2019 | | BRIAN | BRIAN | | E= | C | 6153307 |
GDS ELECTRIC | E= | P | 03/18/2019 | inside ok----still need drive up and canopy | BRIAN | BRIAN | | E= | P | 6136061 |
GDS ELECTRIC | ER | P | 03/08/2019 | drive up canopy --ok -------- NOTE -- NEED UL LISTIMG ON ALL ATM AND TELLER EQUIPMENT | BRIAN | BRIAN | | ER | P | 6128380 |
GDS ELECTRIC | ER | P | 03/05/2019 | tile grid ceilings---ok | BRIAN | BRIAN | | ER | P | 6124293 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 03/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6123604 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 03/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6123602 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 03/04/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6123603 |
GDS ELECTRIC | ER | P | 02/12/2019 | all walls,hard lids, | JOHNN | JOHNN | | ER | P | 6104576 |
GDS ELECTRIC | ER | P | 01/28/2019 | bathroom walls and hard lids ok / still waiting on drive up/teller / | MIGUEL | MIGUEL | | ER | P | 6090311 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/17/2019 | FIRE ALARM INSPECTION: as per the fire alarm prints and contractor all devices to be ceiling mounted ----- will need a above ceiling rough inspection before ceiling can be closed up ----- permit and plans on site | CRAIGS | CRAIGS | | ER | P | 6080907 |
GDS ELECTRIC | ER | P | 01/15/2019 | 1st floor: all walls except: bath rooms, drive thru window, Discussed accessibility requirements with contractor / Electrical wall rough partial, FA not complete,---need FA permit----- do not close walls-------------- / | JOHNN | JOHNN | | ER | P | 6078644 |
GDS ELECTRIC | ESL | P | 01/09/2019 | 4-slab cut areas, 3-floor openings, 1-power and data | GARYL | GARYL | | ESL | P | 6072941 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 04/10/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6160999 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/12/2019 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 6131343 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/13/2019 | ABOVE CEILING SA MAINS / RUN OUTS AND BOX TIE INS OK | JERRYF | JERRYF | | HD | P | 6106246 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/02/2019 | ABOVE CEILING SA LOW PRESSURE MAINS AND RUN OUTS ARE OK - STILL NEED ALL MEDIUM PRESSURE DUCT / BOXES INSPECTED | JERRYF | JERRYF | | HD | P | 6066764 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | P= | C | 04/01/2019 | | JOSEPHD | JOSEPHD | | P= | C | 6150385 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | P= | P | 03/25/2019 | need to see wet bar completed, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6143544 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PTO | C | 01/28/2019 | note: need plan splice for relocated water heater, drinking fountain in hall way, discussed accessible requirements, aav @ wet bar | JOSEPHD | JOSEPHD | | PTO | C | 6090084 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PTO | P | 01/09/2019 | in wall ok at wet bar, note: aav @ wet bar | JOSEPHD | JOSEPHD | | PTO | P | 6073540 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PB | C | 12/03/2018 | revise plans for drinking fountain in hall way by final. | TAYLOR | TAYLOR | | PB | C | 6041208 |
COLORADO STRUCTURES INC | XBS | T | 02/27/2019 | PAID (REC#1581320): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Card reader access locations | SHELLEY | SHELLEY | | XBS | T | 6119222 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | XPS | P | 02/27/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 2/27/19: Delta 1 update fixture schedule. | SHANEN | SHANEN | | XPS | P | 6119204 |
COLORADO STRUCTURES INC | XBS | P | 02/12/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revise UL listing to V455 | DANM | DANM | | XBS | P | 6104451 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | XPS | T | 02/12/2019 | PAID (REC#1575911): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 2/12/19: Delta 2 revision: Relocate water heater. | SHANEN | SHANEN | | XPS | T | 6104425 |