ALEXANDHER BUILDING CO, INC. | B= | C | 04/08/2019 | | NICK | NICK | | B= | C | 6158835 |
ALEXANDHER BUILDING CO, INC. | B= | P | 04/01/2019 | Temp CO: need p and b finals ( Expires: 5/1/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6151473 |
ALEXANDHER BUILDING CO, INC. | B= | P | 04/01/2019 | Building final OK pending mechanical and plumbing complete. Additional Inspections Required (computer generated): GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6150938 |
ALEXANDHER BUILDING CO, INC. | BFR | C | 04/01/2019 | | NICK | NICK | | BFR | C | 6150931 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 03/08/2019 | Eng on file for stair landing framing / All framing OK per Eng design for stair landing / All framing OK / Need mechanical and plumbing complete / Reviewed accessible elements | NICK | NICK | | BFR | P | 6128547 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 02/01/2019 | Approved plans show hangers for pot to beam connections for interior stairs, at time of inspection bolts installed for post to beam location / All other framing OK / Reviewed accessible elements / Need all MEP's complete | NICK | NICK | | BFR | P | 6095019 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 12/19/2018 | Partial frame inspection for upper level restroom / Need to splice plans to show steel stud framing where approved plans call for wood framing / Need to show new half wall frame at upper level / Reviewed accessible elements / Need all MEP's complete / Still need to inspect lower level restroom frame and stair framing once installed | NICK | NICK | | BFR | P | 6057944 |
THE WIRE NINJA LLC | E= | C | 03/25/2019 | | MIGUEL | MIGUEL | | E= | C | 6143260 |
THE WIRE NINJA LLC | ER | C | 02/01/2019 | rough complete both floors | JOHNN | JOHNN | | ER | C | 6094996 |
THE WIRE NINJA LLC | ER | P | 12/14/2018 | 1st floor walls,see plans | JOHNN | JOHNN | | ER | P | 6053464 |
DRUMMOND PLUMBING LLC | H= | C | 04/01/2019 | | JERRYF | JERRYF | | H= | C | 6150974 |
AIRTECH MECHANICAL, INC. | H= | C | 03/29/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6148414 |
AIRTECH MECHANICAL, INC. | H= | P | 03/26/2019 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 6144441 |
DRUMMOND PLUMBING LLC | HC | C | 03/21/2019 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6139652 |
DRUMMOND PLUMBING LLC | HI | C | 03/21/2019 | NEED PLAN REVISED TO MATCH INSTALLED SYSTEM | JERRYF | JERRYF | | HI | C | 6139642 |
DRUMMOND PLUMBING LLC | HI | R | 03/20/2019 | CANCELED BY INSPECTOR UPON ARRIVAL - WORK STILL IN PROGRESS - BY FINAL WILL NEED PLAN REVISED TO MATCH INSTALLED | JERRYF | JERRYF | | HI | R | 6137903 |
DRUMMOND PLUMBING LLC | HV | C | 03/19/2019 | DIRECT VENT WATER HEATER | JERRYF | JERRYF | | HV | C | 6136627 |
AIRTECH MECHANICAL, INC. | HD | P | 03/01/2019 | EXHAUST CONNECTION OK IN BUILDING AT FUTURE INSPECTION NEED TO VERIFY ON ROOF | JERRYF | JERRYF | | HD | P | 6121242 |
AIRTECH MECHANICAL, INC. | HD | P | 02/11/2019 | ABOVE CEILING SA MAINS AND RUN OUTS AND EXHAUST OK - STILL NEED EXHAUST TIE IN AT FAN | JERRYF | JERRYF | | HD | P | 6103356 |
DRUMMOND PLUMBING LLC | P= | C | 04/03/2019 | corrections made see image (aav letter, condensate) | JOSEPHD | JOSEPHD | | P= | C | 6153099 |
DRUMMOND PLUMBING LLC | P= | P | 04/02/2019 | need engineer letter for aav's, need condensate line at water heater vent run, can upload images, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6152393 |
DRUMMOND PLUMBING LLC | P= | P | 04/01/2019 | can not test water sewer not connected outside, re-inspect all, need t&p line ran, need engineer letter for aav's | JOSEPHD | JOSEPHD | | P= | P | 6150706 |
DRUMMOND PLUMBING LLC | PB | C | 04/01/2019 | connection made and stubbed out | JOSEPHD | JOSEPHD | | PB | C | 6150704 |
DRUMMOND PLUMBING LLC | PTO | P | 03/01/2019 | vents ok, still need to see connection at new sewer stub in, top out complete | JOSEPHD | JOSEPHD | | PTO | P | 6121248 |
DRUMMOND PLUMBING LLC | PTO | P | 01/25/2019 | all dwv and water pipe test ok, need to see roof penetrations, and still need to see sewer main connected, need plan splice for changes in base plumbing still and for aav's at S-1, all SS-1, & MSB-1 sinks, and for vent sizing | JOSEPHD | JOSEPHD | | PTO | P | 6088267 |
DRUMMOND PLUMBING LLC | PTO | P | 01/16/2019 | lost test at 2nd floor dwv, need washer box drain to change to 3" at first fixture down stream, need engineer letter for aav @ laundry sink, need plan splice for change in venting not connecting to 3" vent running out new 2" vent instead, and for added floor drain on 2nd floor | JOSEPHD | JOSEPHD | | PTO | P | 6079728 |
DRUMMOND PLUMBING LLC | PB | P | 01/10/2019 | test ok, need to see connection from hall way thru foundation, will need new under ground lay out spliced to plans to address lack of 4" main running thru unit and base now being stubbed out thru foundation, proceed at own risk | JOSEPHD | JOSEPHD | | PB | P | 6074635 |
DRUMMOND PLUMBING LLC | XMS | P | 01/24/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised water heater location and gas routing | JUSTINC | JUSTINC | | XMS | P | 6087493 |
THE WIRE NINJA LLC | XES | P | 01/03/2019 | PLAN SPLICE: (No Fee) by: CRAIG for Electrical: as builts | CRAIG | CRAIG | | XES | P | 6067392 |
ALEXANDHER BUILDING CO, INC. | XPS | T | 01/03/2019 | PAID (REC#1571696) Delta 1 revisions New water heater schedule and detail. Rerouted main level water piping and added recirc. line. Relocated drain tie-in and new piping layout. Added floor drain at new water heater location. | SHANEN | SHANEN | | XPS | T | 6067371 |