ENCORE ELECTRIC, INC. | E= | C | 05/09/2019 | pump 1&2 and associated pumps OK | CRAIGS | CRAIGS | | E= | C | 6194111 |
ENCORE ELECTRIC, INC. | ER | C | 05/09/2019 | boiler 1&2 and associated pumps ---OK | CRAIGS | CRAIGS | | ER | C | 6194110 |
ENCORE ELECTRIC, INC. | E= | P | 03/21/2019 | partial for boiler 1. and 2 not installed at this time | BRET | BRET | | E= | P | 6139869 |
ENCORE ELECTRIC, INC. | ER | P | 03/21/2019 | boiler 3 , boiler 4 and associated pumps , heat exchanger , new panel and transformer | BRET | BRET | | ER | P | 6139868 |
ENCORE ELECTRIC, INC. | E= | L | 03/20/2019 | auto called---called left message----unsure where to inspect----had to keep going | RANDY | RANDY | | E= | L | 6138646 |
ENCORE ELECTRIC, INC. | ER | L | 03/20/2019 | see notes | RANDY | RANDY | | ER | L | 6138628 |
ENCORE ELECTRIC, INC. | ER | P | 03/12/2019 | disconnect relocated per picture will check wiring on next inspection | BRET | BRET | | ER | P | 6131107 |
ENCORE ELECTRIC, INC. | ER | R | 03/08/2019 | need proper work space at disconnect ss-2, ss-1 ok | BRET | BRET | | ER | R | 6127850 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 12/05/2019 | HEAT FINAL OK. ( SEE IMAGES FOR BOILER VENT CONDENSATE DISPOSAL ) | LIDO | LIDO | | H= | C | 6416816 |
HEATING & PLUMBING ENGINEERS, INC | HE | L | 12/04/2019 | Renewed for No Fee at 12/4/2019 3:28:32 PM | JACK | JACK | | HE | L | 6416554 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 05/24/2019 | CONDENSATE DRAIN WAS INSTALLED ON VENT, INSTALLATION INSTRUCTIONS DO NOT SHOW A DRAIN TO BE AN OPTION, DRAIN SHALL NOT BE IN PLACE / IF DRAIN IS TO BE PLUGGED THIS WILL NEED TO BE PER THE MANUFACTURES REQUIREMENTS. IF THE SECTION OF VENT WITH THE DRAIN IS REPLACED THIS WILL REQUIRE A RE- INSPECTION FOR THE VENT.( 4- BOILER OK .) | LIDO | LIDO | | H= | P | 6210335 |
HEATING & PLUMBING ENGINEERS, INC | HV | P | 05/24/2019 | CONDENSATE DRAIN WAS INSTALLED ON VENT, INSTALLATION INSTRUCTIONS DO NOT SHOW A DRAIN TO BE AN OPTION, DRAIN SHALL NOT BE IN PLACE / IF DRAIN IS TO BE PLUGGED THIS WILL NEED TO BE PER THE MANUFACTURES REQUIREMENTS. IF THE SECTION OF VENT WITH THE DRAIN IS REPLACED THIS WILL REQUIRE A RE- INSPECTION FOR THE VENT. | LIDO | LIDO | | HV | P | 6210324 |
HEATING & PLUMBING ENGINEERS, INC | HC | C | 05/24/2019 | 6,400,000 K ADDED TO GAS LOAD. | LIDO | LIDO | | HC | C | 6209618 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 05/22/2019 | STILL NEED BOILERS AND BOILER VENT INSPECTION. | LIDO | LIDO | | HSP | P | 6207631 |
HEATING & PLUMBING ENGINEERS, INC | HI | C | 05/22/2019 | CHANGED TO COMPLETE 5/23/19 (LM) ALL 4 BOILERS :GAS FINAL CONNECTIONS OK | LIDO | LIDO | | HI | C | 6207616 |
HEATING & PLUMBING ENGINEERS, INC | HWP | C | 05/22/2019 | HEAT WATER SUPPLY AND RETURN FROM HPW-1 AND HPW-2 : SEE RECORD OF TEST / UNDER OPERATING PRESSURE NO VISIBLE LEAKS / INSTALLED PER PLAN / OK TO WRAP AND LABEL. 4 BOILERS AND 2 WATER HEATERS HEAT EXCHANGERS : ALL HEAT WATER SUPPLY AND RETURN PIPING COMPLETE. | LIDO | LIDO | | HWP | C | 6207615 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 05/14/2019 | BOILER - B-1 AND B-2 : SEE RECORD OF TEST- TWO 60 lb TEST OK / GAS INSTALLED PER THE APPROVED SPLICE DATED 5/13/19 .NEED TO SEE FINAL GAS CONNECTIONS TO BOILERS. | LIDO | LIDO | | HI | P | 6198665 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 05/13/2019 | BOILER -B-1 AND B-2 / WATER HEATER -WH-2 PLAN PAGE 1.13 ( BDA 9) SEE RECORD OF TEST ( TWO 70 lb TE4ST OK .HEAT WATER SUPPLY AND RETURN INSTALL OK / OK TO WRAP -INSPECTED PER THE APPROVED PLANS . COOLING TOWERS M1.22 ( BDA 13) INSPECTED FINAL TIE-INNS UNDER OPERATING PRESSURE NO VISIBLE LEAKS / INSTALL COMPLETE. WATER SEPARATORS - SS-1 AND SS-2 : CHECK VALVES INSTALLED , INSPECTED UNDER OPERATING PRESSURE NO VISIBLE LEAKS / INSTALL COMPLETE .
| LIDO | LIDO | | HWP | P | 6197121 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 04/04/2019 | PLAN SPLICES DATED 1/30/19 ARE NOT COMPLETELY APPROVED / NEED ELECTRICAL APPROVED. | LIDO | LIDO | | HSP | P | 6154404 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 04/01/2019 | M1.13 (BDA9) BOILER ROOM : SEE RECORD OF TEST/ 30 LB FLOW TEST FOR HEAT WATER SUPPLY OK / HWP-1 OK / TEMP CONNECTION TO 6" MAIN UNDER OPERATING PRESSURE NO VISIBLE LEAKS . 6" MAINS FOR HEAT WATER SUPPLY AND RETURN UNDER OPERATING PRESSURE OK. | LIDO | LIDO | | HWP | P | 6150880 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 03/20/2019 | BOILER # 3 AND #4 AND WH-1 HEAT WATER SUPPLY AND RETURN : SEE RECORD OF TEST/ 70 lb TEST OK/ INSTALLED PER PLAN . | LIDO | LIDO | | HWP | P | 6138315 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 03/20/2019 | PLAN PAGE M1.13 ( BDA- 9) SHOWS 6 BOILERS TO BE INSTALLED / ONLY 4 ARE BEING INSTALLED / NEED REVISED AND APPROVED PLANS .GAS INSTALLED FOR BOILER # 3 AND #4 : 1-1/2" INSTALLED OFF 4" JUST BEFORE BOILER / PLAN SHOWS 3" NEED REVISED AND APPROVED PLANS TO MATCH INSTALL .SEE RECORD OF TEST/ 60lb TEST OK.
| LIDO | LIDO | | HI | P | 6138311 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 02/14/2019 | PLAN PAGE M1.22 ( BDA 13) SS-1 AND SS-2 SOLID WATER SEPARATOR PIPING SUPPLY AND RETURN FROM COOLING TOWERS PASSING THROUGH A ELEVATOR EQUIPMENT ROOM OK. | LIDO | LIDO | | HWP | P | 6107429 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 02/11/2019 | MECHANICAL INSPECTOR WILL NEED ACCESS TO ELEVATOR EQUIPMENTS ROOM FOR INSPECTIONS OF THE SSS AND THE SSR PIPING SYSTEM . | LIDO | LIDO | | HSP | P | 6103017 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 02/08/2019 | PLAN PAGE M1.22 ( BDA 13) NEED TO RESEARCH SS-1 AND SS-2 SOLID WATER SEPARATOR PIPING SUPPLY AND RETURN FROM COOLING TOWERS PASSING THROUGH A ELEVATOR EQUIPMENT ROOM. NEED REVISED / APPROVED PLANES FOR SUPPLY AND RETURN INSTALLED PER RFI-#4 THIS IS A DIFFERENT ROUTE / RFI IS ATTACHED TO IMAGES . SEE RECORD OF TEST - 75 lb TEST FOR SS-1 AND SS-2 SOLID WATER SEPARATOR PIPING SUPPLY AND RETURN FROM COOLING TOWERS OK . | LIDO | LIDO | | HWP | P | 6101881 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 04/25/2019 | Ok. | DANR | DANR | | P= | C | 6178220 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/07/2019 | Need inspection on domestic - cold - hot - recirc tie into main, ok to insulate piping, back flow assembly, need back flow protection hose end ball valves on domestic water, need inspection to heat exchangers, rest ok. | DANR | DANR | | PTO | P | 6126577 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/30/2018 | Ok for floor drain piping and vent drawing M1.21. | DANR | DANR | | PTO | P | 6039796 |
ENCORE ELECTRIC, INC. | XES | T | 05/13/2019 | PAID (REC#1598072): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised service. | BERTHA | BERTHA | | XES | T | 6197589 |
HEATING & PLUMBING ENGINEERS, INC | XPS | P | 01/31/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 1/31/19 | SHANEN | SHANEN | | XPS | P | 6093156 |
HEATING & PLUMBING ENGINEERS, INC | XMS | T | 01/30/2019 | PAID (REC#1574482): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised schedules, layout, phasing and schedules. New sheets added | JUSTINC | JUSTINC | | XMS | T | 6092622 |