PEAK PROFESSIONAL CONTRS INC | B= | C | 03/06/2019 | final OK pending other finals | DANE | DANE | | B= | C | 6125083 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 02/22/2019 | Temp CO: All finals are complete or pending ( Expires: 3/24/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6115162 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 02/21/2019 | Building final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6112980 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 02/21/2019 | Type B walls now OK per splice | DAKOTAB | DAKOTAB | | BFR | P | 6112970 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 02/13/2019 | ADDITIONAL PLAN REVIEW TIME: (No Fee) From: SHELLEY revised wall detail | SHELLEY | SHELLEY | | BSP | P | 6106389 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 01/15/2019 | need to either install braces at 4' OC on top of all type B walls or have the braces removed from the plans / type C walls now OK / backing has been installed for grab bars / discussed accessible elements / training with Greg D | DANE | DANE | | BFR | P | 6078667 |
PEAK PROFESSIONAL CONTRS INC | BFR | R | 01/09/2019 | plan calls braces from top of wall to underside of structure 4' OC at B type walls / A type wall are to be 6" walls per plan but 3 5/8" used / need to install all grab bar backing / framing OK if plans are spliced to show as built conditions with no bracing and 3 5/8" type A walls / discussed accessible elements / discussed need for indicator at front door at final | DANE | DANE | | BFR | R | 6072914 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | P | 12/14/2018 | ADDITIONAL PLAN REVIEW TIME: (No Fee) From: SHELBY Revise lighting | SHELBY | SHELBY | | BSP | P | 6053922 |
SYSTEMS ELECTRIC, INC. | E= | C | 02/19/2019 | | RANDY | RANDY | | E= | C | 6110658 |
SYSTEMS ELECTRIC, INC. | ER | C | 02/19/2019 | | RANDY | RANDY | | ER | C | 6110644 |
SYSTEMS ELECTRIC, INC. | ESL | P | 02/04/2019 | floor outlet, front entrance okay to cover | GARYL | GARYL | | ESL | P | 6096832 |
SYSTEMS ELECTRIC, INC. | ER | P | 01/09/2019 | Rough for walls ok / Discussed accessibility requirements with contractor / No FA / | ROB | ROB | | ER | P | 6073707 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 02/19/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6110151 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/15/2019 | FLEX AND DIFFUSERS OK. THERMOSTATS OK. REMOTE INDICATORS INSTALLED. ROOF OK. MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6108684 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 01/17/2019 | NEED TO ISOLATE PVC FROM RETURN AIR PLENUM. EXHAUST DUCT CONNECTIONS OK ABOVE HARD LIDS. NO ROOF TODAY. | DUSTINS | DUSTINS | | HD | C | 6081759 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/07/2019 | WORKING OFF SPLICE DATED 12/14/18, NO ROOF TODAY, WILL NEED TO SEE BATH EXHAUST CONNECTIONS, ALL TRUNK LINES AND LATERALS OK, OK TO INSULATE | BENH | BENH | | HD | P | 6069830 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/22/2019 | Ok. | DANR | DANR | | P= | C | 6114338 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/21/2019 | No hot water, rest ok. | DANR | DANR | | P= | P | 6113208 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 01/23/2019 | correction made, vent thru roof, check rating for plenum wrapping, | JOSEPHD | JOSEPHD | | PTO | C | 6086158 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/16/2019 | Cold water under sized per plan drawing shows 1-1/4" off main up to water heater - water heater 1" cold, pex support off main, need vtr penetration, need engineer approval fpor pvc in plenum drawing show cast no pvc, rest ok. Note: need plenum wrap all unrated piping in return air plenum, check water heater at final. | DANR | DANR | | PTO | P | 6079595 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 12/21/2018 | Ok | DANR | DANR | | PB | C | 6060945 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 01/11/2019 | PAID (REC#1568926) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised wall type for demising wall. | BPHILLIPS | BPHILLIPS | | XBS | T | 6075915 |
PEAK PROFESSIONAL CONTRS INC | XBS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: BPHILLIPS for Construction: Removed ceiling in workout room. | BPHILLIPS | BPHILLIPS | | XBS | P | 6053911 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: clouded revisions | DALEH | DALEH | | XMS | P | 6053846 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 12/14/2018 | PAID (REC#1563845) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice | SHANEN | SHANEN | | XPS | T | 6053821 |