GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 10/30/2019 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6384139 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/07/2019 | Remodel complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | RICHB | RICHB | | B= | P | 6127294 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/05/2019 | Demo & Framing for Supplies 027 OK pending other Roughs | RICHB | RICHB | | BFR | P | 6098176 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/03/2019 | Framing for all areas except Supplies 027 is OK pending other Roughs - still need to inspect new framing & demo in Supplies 027 when ready | RICHB | RICHB | | BFR | P | 6067680 |
BIBLE ELECTRIC, INC. | E= | C | 02/26/2019 | | GARYL | GARYL | | E= | C | 6117805 |
BIBLE ELECTRIC, INC. | E= | P | 02/14/2019 | marked/dated on EC prints | GARYL | GARYL | | E= | P | 6107201 |
BIBLE ELECTRIC, INC. | ER | P | 02/14/2019 | all ceilings ---- marked/dated on prints | GARYL | GARYL | | ER | P | 6107191 |
BIBLE ELECTRIC, INC. | E= | P | 02/13/2019 | not ready | GARYL | GARYL | | E= | P | 6105974 |
BIBLE ELECTRIC, INC. | ER | P | 02/13/2019 | Lobby ceiling, Note! still need conference room ceiling and final | GARYL | GARYL | | ER | P | 6105964 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 02/11/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 6103863 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 02/11/2019 | FIRE ALARM INSPECTION: ceilings | GARYL | GARYL | | ER | P | 6103862 |
BIBLE ELECTRIC, INC. | ER | P | 02/11/2019 | all ceilings EXCEPT-- lobby and 2-conferance rooms | GARYL | GARYL | | ER | P | 6103856 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 02/06/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | P | 6099775 |
BIBLE ELECTRIC, INC. | ER | R | 02/05/2019 | NO FA called in, 2-recept's in supply room wall okay | GARYL | GARYL | | ER | R | 6098531 |
BIBLE ELECTRIC, INC. | ER | R | 01/16/2019 | can not okay ceilings without FA inspection,,,,,,,,,,,, NOTE! walls and ceilings okay in lobby and bathroom | GARYL | GARYL | | ER | R | 6079771 |
BIBLE ELECTRIC, INC. | ER | P | 01/07/2019 | walls / marked on electricians set of plans | BRET | BRET | | ER | P | 6069936 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 03/06/2019 | HEAT WATER SUPPLY AND RETURN TO NEW HEAT PUMP : UNDER OPERATING PRESSURE / NO VISIBLE LEAKS . CONDENSATE DISPOSAL INSTALLED PER SPLICE . | LIDO | LIDO | | H= | C | 6125343 |
COLORADO SHEET METAL CO., INC. | H= | C | 03/06/2019 | CONDENSATE DRAIN FOR NEW HEAT PUMP INSTALLED PER SPLICE . | LIDO | LIDO | | H= | C | 6125336 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/22/2019 | ENGINEER LETTER RECEIVED APPROVING THE TEST AND BALANCE REPORT READINGS .( SEE IMAGES ) WHAT IS BEING DONE WITH THE CONDENSATE DISPOSAL? REFER TO NOTES FROM INSPECTION DATED 2/13/19 | LIDO | LIDO | | H= | P | 6114029 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/19/2019 | TEST AND BALANCE REPORT REVIEW : HP-009 REGISTER READING 1 AND 2 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED/ THERE IS A NOTE ON THE BALANCE REPORT STATING THE MEDIUM AND LOW SETTING IS NOT WORKING ON THE SPEED CONTROL .HP-011 ALL THE REGISTERS ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. BALANCE REPORT SHOWS A MAU-1 UNIT? A MAKE UP AIR UNIT IS NOT SHOWN ON THE PLANS AND THE OUTSIDE AIR READINGS ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED .NEED A REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. | LIDO | LIDO | | H= | P | 6110114 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/19/2019 | ENGINEER LETTER RECEIVED APPROVING THE NEW HEAT PUMP MODEL INSTALLED. ( SEE IMAGES) | LIDO | LIDO | | H= | P | 6110018 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/13/2019 | ((CONTRACTOR THAT INSTALLED THE HEAT WATER SUPPLY AND RETURN TO NEW HEAT PUMP WILL NEED TO ATTACH TO PERMIT( HEAT WATER SUPPLY AND RETURN PIPING TO NEW HEAT PUMP UNDER OPERATING PRESSURE OK / NO VISIBLE LEAKS , OK TO INSULATE .) NEW HEAT PUMP CONDENSATE DISPOSAL IS TIED INTO EXISTING CONDENSATE DISPOSAL /THIS WILL NEED REVISED / APPROVED PLANS FOR THIS INSTALL, WHERE IS THE CONDENSATE TERMINATING?)) NEW HEAT PUMP INSTALLED IS THE CORRECT MANUFACTURE BUT HAS A DIFFERENT MODEL NUMBER / ENGINEER WILL NEED TO VERIFY THAT THIS MODEL IS OK. NEED TEST AND BALANCE REPORT . SUPPLY AND RETURN GRILLS AND REGISTERS FINAL CONNECTIONS OK/ THERMOSTATS OK.
| LIDO | LIDO | | H= | P | 6106113 |
COLORADO SHEET METAL CO., INC. | HD | P | 01/23/2019 | ABOVE CEILING DUCT ROUGH OK / OK TO WRAP . NEW HEAT PUMP OK. | LIDO | LIDO | | HD | P | 6086357 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 03/06/2019 | | SAMH | SAMH | | P= | C | 6125698 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/06/2019 | Corrections made. | SAMH | SAMH | | PTO | C | 6125696 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/10/2019 | toilet still horizontal dry vented, need to see connection at sewer main, need plan splice for new water pipe connection locations and connecting to 2" rather than 1" line, still need plan splices from original inspection and engineer letter for cast at dwv | JOSEPHD | JOSEPHD | | PTO | P | 6074966 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/04/2019 | toilet to far off side wall, can not have horizontal dry vent under floor at toilet, still need to see over head connections at water pipe, will need to splice plans for removal of floor drain and water supply to refreshment area, need engineer letter for cast iron at dwv, in wall water pipe and dwv ok | JOSEPHD | JOSEPHD | | PTO | P | 6068929 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 03/06/2019 | PAID (REC#1580752) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 3/6/19: Delta 4 revisions | SHANEN | SHANEN | | XPS | T | 6125707 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 03/05/2019 | PAID (REC#1580346) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 3 | DALEH | DALEH | | XMS | T | 6124173 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 03/05/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 3/5/19: Engineers letter for cast iron in lieu of PVC. | SHANEN | SHANEN | | XPS | P | 6124148 |
BIBLE ELECTRIC, INC. | XES | T | 01/09/2019 | PAID (REC#1568445) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | T | 6073782 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 01/04/2019 | PAID (REC#1567245) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1-4-19 remove floor drain added p-trap for water fountain | TCRIPPEN | TCRIPPEN | | XPS | T | 6068422 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 01/03/2019 | PLAN SPLICE FEE: $0 by: SHANEN for Plumbing | SHANEN | SHANEN | | XPS | P | 6067687 |