JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | C | 12/31/2019 | plumbing signed off | JANE | JANE | | B= | C | 6440836 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 12/02/2019 | Temp CO: Ok per BW ( Expires: 1/1/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6412436 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 10/30/2019 | Temp CO: needs two more weeks ( Expires: 11/29/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6384118 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 10/01/2019 | . Additional Inspections Required (computer generated): KCA COMPANIES INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6353081 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 09/30/2019 | Temp CO: Per Mechanical finals ( Expires: 10/30/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6352699 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 08/01/2019 | Temp CO: all the finals are complete or partialed ( Expires: 8/31/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6284366 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | B= | P | 07/29/2019 | American shaft wall system installed at old elevator location, approved plans call for U415 USG listing / Need to complete all other finals / All other elements of final OK. Additional Inspections Required (computer generated): AMERICAN PRIDE PLUMBING Plumbing Final Inspection is not Completed yet, KCA COMPANIES INC. Mechanical Final Inspection is not Completed yet, TRUSTED ELECTRIC Electrical Final Inspection is not Completed yet. ADDED COMMENT ON 8/1/19 SPLICE IN FOR V455 SHAFT WALL ASSEMBLY CHANGED TO PARTIAL | NICK | NICK | | B= | P | 6280560 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | BFR | P | 02/21/2019 | Frame for office 253 OK / Still need to inspect new shaft wall system per U415 for infill of elevator | NICK | NICK | | BFR | P | 6113061 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | BFR | P | 01/25/2019 | Need to complete frame for office 253 / Still need to inspect U415 shaft wall system at existing elevator location per approved plans / Could not find point of contact on site to review accessible elements / Permit is for interior finish, need restrooms to meet accessible requirements / Need sink for to be dropped to 34" at final / Need to attach mechanical and plumbing / Need all MEP's complete | NICK | NICK | | BFR | P | 6088445 |
TRUSTED ELECTRIC | E= | C | 07/31/2019 | | JOHNN | JOHNN | | E= | C | 6283722 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 06/26/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6244527 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 06/26/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6244516 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 06/26/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6244518 |
TRUSTED ELECTRIC | E= | P | 06/19/2019 | need fire alarm complete / panel sch / label the disco's on the VAV boxes / | BRIAN | BRIAN | | E= | P | 6236288 |
TRUSTED ELECTRIC | ER | R | 06/19/2019 | Ceiling rough ok, FA not complete ---------do not close ceiling-------------- / | BRIAN | BRIAN | | ER | R | 6236284 |
TRUSTED ELECTRIC | ER | P | 06/13/2019 | above ceiling ok except conference room, FA, and surface mounted fixtures / sign circuit j box located on 3rd floor SE corner, no disconnect yet / | MIGUEL | MIGUEL | | ER | P | 6229917 |
TRUSTED ELECTRIC | ER | P | 02/19/2019 | all walls,ok, Electrical Rough ok, need FA permit, FA not complete ---------------do not sheetrock--------------- / | JOHNN | JOHNN | | ER | P | 6110806 |
TRUSTED ELECTRIC | ER | P | 01/25/2019 | walls/see plans/ Electrical Rough ok/ FA not complete ---------------do not sheetrock--------------- / Discussed accessibility requirements with contractor / | JOHNN | JOHNN | | ER | P | 6088043 |
KCA COMPANIES INC. | H= | C | 12/31/2019 | TAB Report good. | JACK | JACK | | H= | C | 6440834 |
KCA COMPANIES INC. | H= | P | 08/01/2019 | MET WITH SENIOR INSPECTOR AND WENT OVER ISSUES FROM PREVIOUS DAY AND WE ARE ABLE TO SIGN PERMIT OFF PENDING TAB REPORT | BENH | BENH | | H= | P | 6284620 |
KCA COMPANIES INC. | H= | P | 07/31/2019 | NOT READY STILL HAVE ELECTRICAL SERVICE CLEARANCE ISSUES FOR FAN POWERED BOX 211,210,207 AND 202, ON THE INLET SIDE OF FAN POWERED BOX TITUS MANUFACTURE CALLS FOR 3 TIMES DIAMETER OF STRAIGHT GOING IN TO INLET SIDE OF FAN POWERED BOX FOR 211, 210, 207 | BENH | BENH | | H= | P | 6283026 |
KCA COMPANIES INC. | HD | P | 07/01/2019 | PLEASE PROVIDE INSTALLATION INSTRUCTIONS FOR FAN POWERED BOXES TO MAKE SURE THERE ARE NOT ANY REQUIREMENTS FOR SO MUCH STRAIGHT PIPE ON INLET FOR MEDIUM PRESSURE(211,210,207), ALSO ALL FAN POWERED BOXES WILL REQUIRE 36" CLEARANCE TO ELECTRICAL SERVICE (211,210,207,202) TRUNK LINES AND LATERALS AND FLEX AND DIFFUSERS ABOVE CEILING OK | BENH | BENH | | HD | P | 6249744 |
AMERICAN PRIDE PLUMBING | P= | C | 08/01/2019 | corrections made | JOSEPHD | JOSEPHD | | P= | C | 6284610 |
AMERICAN PRIDE PLUMBING | P= | P | 07/26/2019 | leak at drinking fountain, still need plan splice for drinking fountain relocation, need engineer letter for aav @ drinking fountain, will need alternate material and methods for single drinking fountain and bottle filler, drinking fountain lacking accessible knee clearance, need to see hot water insulation in ceiling, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6279115 |
AMERICAN PRIDE PLUMBING | PTO | C | 03/21/2019 | Ok. Note: at final check over head hot water insulation, by final add drinking fountain to scope of work, will need plan splice to show drinking fountain location, will need engineer letter for aav @ drinking fountain, will need approval for single drinking fountain with bottle filler | DANR | DANR | | PTO | C | 6139429 |
AMERICAN PRIDE PLUMBING | PTO | P | 03/12/2019 | lost test dwv, plans call for 3/4" to hot water, will need plan splice to show drinking fountain location, will need engineer letter for aav @ drinking fountain, and 1/2 to hot water, will need approval for single drinking fountain with bottle filler, need to protect water lines touching wall stub and hanger bolt for dwv, re-inspect all | JOSEPHD | JOSEPHD | | PTO | P | 6132202 |
JP COOPER CONSTRUCTION/INTERIOR FINISHES LLC | XBS | T | 07/31/2019 | PAID (REC#1618748) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Floor plan revisions, removed drinking fountain, and revised shaftwall assembly. | SHELLEY | SHELLEY | | XBS | T | 6284160 |
AMERICAN PRIDE PLUMBING | XPS | P | 07/31/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 7/31/19: Deleting drinking fountain shown on P pages, upgrading existing drinking fountain to accessible height with a bottle filler, see page A1.1 for location. | SHANEN | SHANEN | | XPS | P | 6283260 |