COMMONWEALTH CONSTRUCTION CORPORATION | B= | C | 08/24/2022 | final OK per inspection dated 6/18/20 | DANE | DANE | | B= | C | 7494344 |
COMMONWEALTH CONSTRUCTION CORPORATION | BE | T | 08/09/2022 | PAID (REC#1890738): TCO | JANE | JANE | | BE | T | 7476569 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 06/29/2022 | Temp CO: extension paid 150 1879123 ( Expires: 7/29/2022 12:00:00 AM) | JANE | JANE | | B= | P | 7430159 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 03/23/2022 | Temp CO: Extension - paid $200 1852667 ( Expires: 4/22/2022 12:00:00 AM) | JANE | JANE | | B= | P | 7311336 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 11/10/2021 | PAID (REC#1837605) Temp CO: Extension pending required finals ( Expires: 12/10/2021 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 7172933 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 10/08/2021 | PAID (REC#1817961) Temp CO: extension ( Expires: 11/7/2021 12:00:00 AM) | NELIDA | NELIDA | | B= | T | 7134897 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 09/02/2021 | PAID (REC#1804314) Temp CO: extension ( Expires: 10/2/2021 12:00:00 AM) | NELIDA | NELIDA | | B= | T | 7095765 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 08/03/2021 | Temp CO: extension ( Expires: 9/2/2021 12:00:00 AM) | JANE | JANE | | B= | P | 7059098 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 06/18/2021 | Temp CO: Extension ( Expires: 7/18/2021 12:00:00 AM) | GITA | GITA | | B= | P | 7007905 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 05/20/2021 | Temp CO: extension ( Expires: 6/19/2021 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6975143 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 04/07/2021 | PAID (REC#1764564) Tco extension. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6925416 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 04/07/2021 | Temp CO: extension ( Expires: 5/7/2021 12:00:00 AM) | GITA | GITA | | B= | P | 6925414 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 03/04/2021 | PAID (REC#1754748) tco extension.
| GITA | GITA | | B= | T | 6889014 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 03/04/2021 | Temp CO: extension ( Expires: 4/3/2021 12:00:00 AM) | GITA | GITA | | B= | P | 6889012 |
COMMONWEALTH CONSTRUCTION CORPORATION | BE | T | 02/04/2021 | PAID (REC#1754748) TCO | JANE | JANE | | BE | T | 6859476 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 02/04/2021 | Temp CO: extension ( Expires: 3/6/2021 12:00:00 AM) | JANE | JANE | | B= | P | 6859474 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 01/07/2021 | PAID (REC#1741437) Extension. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6829176 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 01/07/2021 | Temp CO: extension ( Expires: 2/6/2021 12:00:00 AM) | GITA | GITA | | B= | P | 6829172 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 12/10/2020 | PAID (REC#1735859) extension. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6803003 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 12/10/2020 | Temp CO: extension ( Expires: 1/9/2021 12:00:00 AM) | GITA | GITA | | B= | P | 6803002 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 11/12/2020 | PAID (REC#1735859) TCO. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6773461 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 11/12/2020 | Temp CO: extension ( Expires: 12/12/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6773460 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 10/16/2020 | PAID (REC#1722241): TCO.
| GITA | GITA | | B= | T | 6744075 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 10/16/2020 | Temp CO: Extension ( Expires: 11/15/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6744074 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | R | 08/13/2020 | inspection called on wrong permit | NATHAN | NATHAN | | BSP | R | 6672265 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 07/23/2020 | Temp CO: Tco per Bert W to extend. ( Expires: 8/22/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6647232 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | T | 06/24/2020 | PAID (REC#1690771): Temp CO: Pending Mechanical and Zoning final/Trip fee assessed for TCO fee collection ( Expires: 7/24/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6615304 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | P | 06/18/2020 | all items corrected and all paperwork on file. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), AMEN PLUMBING AND HEATING Plumbing Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6610052 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | C | 06/18/2020 | observation letters on file | NATHAN | NATHAN | | BFR | C | 6608966 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | C | 06/18/2020 | | NATHAN | NATHAN | | BIN | C | 6608961 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFI | C | 06/18/2020 | observation on file | NATHAN | NATHAN | | BFI | C | 6608953 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | R | 06/16/2020 | still need all observation paperwork per previous comments, need firecaulk at all penetrations at laundry ceiling 1st and 2nd floor ---3rd floor has been corrected as well as Type B bathrooms all 1st floor. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), AMEN PLUMBING AND HEATING Plumbing Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | R | 6606855 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | R | 06/11/2020 | still need completed summary observation letter for structural and foundation insulation, need 48" clear for side approach at all type B units first floor bathroom vanity , unit 102 need knee and toe clearance at kitchen sink , Thermostats over 48" to operable parts, need firecaulk at all ceiling penetrations in laundry rooms, recheck end draftstop doors for latches. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), AMEN PLUMBING AND HEATING Plumbing Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | R | 6602059 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | R | 06/10/2020 | Canceled spoke With Dean about issues with building 2 permit. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), AMEN PLUMBING AND HEATING Plumbing Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | R | 6600369 |
COMMONWEALTH CONSTRUCTION CORPORATION | B= | R | 06/08/2020 | unit 102 need knee and toe clearance at kitchen sink, thermostat over 48", firecaulk all penetrations through all roof ceiling and floor ceiling assemblies, draft stop doors at attic missing, need all structural summary observation and foundation insulation observation, need clear floor space at type B option A and B bathroom at sinks , west stack and stopped at bottom floor center stack . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), AMEN PLUMBING AND HEATING Plumbing Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | R | 6597290 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 04/20/2020 | draftstop at attic need door to be self closing and self latching. Ceiling insulation at roof entire okay. | NATHAN | NATHAN | | BIN | P | 6545918 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFN | P | 04/20/2020 | Need foundation insulation observation, Engineers observation for compaction, footer and foundation on file. | NATHAN | NATHAN | | BFN | P | 6544835 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 03/13/2020 | drywall screw inspection walls and ceiling per U356, U344, U305 and L563, P545 units 107-310 | NATHAN | NATHAN | | BSP | P | 6510814 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | R | 03/11/2020 | 101, 302, 402 tub and shower enclosures installed before reinspection was done for drywall attachment. | NATHAN | NATHAN | | BSP | R | 6508076 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/27/2020 | drywall screw inspection per P545, and L563 at ceiling and walls per U305, U344, U356 at units 105-306 EXCEPT MECHANICAL ROOM CEILING> | NATHAN | NATHAN | | BSP | P | 6495217 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/26/2020 | units 102,103, 202, 105, 106 drywall and sheer okay except mechanical room ceiling,
Discussed new floor ceiling L563 and roof ceiling assemblies P545 presented for use of American Gypsum with Ben H mechanical inspector. Plan splice will be needed for new listing | NATHAN | NATHAN | | BSP | P | 6493484 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | C | 02/24/2020 | need all structural observation paperwork for footer, foundation, drain, foundation insulation, collars installed on pipes units 101-304 | NATHAN | NATHAN | | BSP | C | 6490982 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/24/2020 | 101-304 drywall screw inspection units 102,103, 202 not ready, 302 mechanical room and bathroom not ready, mechanical ceilings all units not done. Remaining units okay. | NATHAN | NATHAN | | BSP | P | 6490977 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/21/2020 | 107-310 RC at walls and ceiling okay | NATHAN | NATHAN | | BSP | P | 6489446 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/19/2020 | Wall and ceiling RC at bunits 101-306 okay.with completed required inspections. | NATHAN | NATHAN | | BSP | P | 6486523 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | R | 02/18/2020 | RC inspection stopped, need all ends supported at walls and around electric boxes, fans and supply air vents, many screws missing at rc to floor ceiling need new floor ceiling and roof ceiling listing for use of American Gypsum. | NATHAN | NATHAN | | BIN | R | 6485276 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | L | 02/14/2020 | field cancelled/ RC not ready | SCOTTS | SCOTTS | | BSP | L | 6482552 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 02/14/2020 | Exterior Thermal -- stacks 07/08/09/10 exterior thermal is per energy plan | SCOTTS | SCOTTS | | BIN | P | 6482548 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/13/2020 | RC channel install per P 522 in live unit on 3rd floor at far North west corner okay | BOBF | BOBF | | BSP | P | 6481530 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 02/11/2020 | Discussed P522 and UL L563 both listing require USG not American Gypsum that is stocked on site. need new listing for American Gypsum or correct drywall. | NATHAN | NATHAN | | BSP | P | 6479601 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 02/11/2020 | all units walls and rim completed at exteriors / CCRR-1121 received for spray foam insulation at rim and is acceptable to use in building type and rated assemblies. | NATHAN | NATHAN | | BIN | P | 6479592 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 02/11/2020 | Still need all 4" pipes firestopped and gypcrete at dead air chases, frame okay at 107 dryer box has been wrapped. | NATHAN | NATHAN | | BFR | P | 6479578 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 02/05/2020 | 101-304 stack insulation at walls only okay with completed required inspections . Discussed RC at ceiling and netting used for blown insulation. | NATHAN | NATHAN | | BIN | P | 6474847 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 02/03/2020 | Frame and Firecaulking 107 need dryer box five sided, still need all 4" pipes and dead spaces completed ,complete all required rough inspections 108-310 okay, | NATHAN | NATHAN | | BFR | P | 6472832 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 01/30/2020 | Frame and Firestop/ Firecaulking units 105-306 okay frame items corrected, Engineering repairs on file. | NATHAN | NATHAN | | BFR | P | 6469940 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 01/28/2020 | 101-304 Firestops completed except dead air chase gypcrete | NATHAN | NATHAN | | BFR | P | 6467039 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 01/27/2020 | 101-304 Frame and Firecaulking all engineering paperwork for floor and trusses picked up repairs are completed. 1st-3rd floor 301-304 need firecaulking at sprinkler heads at side of patio's, dead air chases missing gypcrete and drywall at ceiling 4" Radon pipe penetration need specific listing presented for inspection, seal all penetrations in top plates through out remaining units and back rock Dryer Box per details at rated wall. | NATHAN | NATHAN | | BFR | P | 6465553 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 01/24/2020 | shower valves at accessible units discussed rated penetrations,
104,109 tub/shower walls firecaulking okay | NATHAN | NATHAN | | BFR | P | 6463769 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 01/15/2020 | drywall attachment P522 listing at breezeway ceilings | NATHAN | NATHAN | | BSP | P | 6454323 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 01/09/2020 | Drywall screw inspection in bathroom only 107, 109 not ready, 105, 106, 205-310 okay | NATHAN | NATHAN | | BSP | P | 6448439 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 01/09/2020 | RC breezeway ceiling entire okay | NATHAN | NATHAN | | BSP | P | 6448433 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 01/07/2020 | 105-310 tub/shower wall insulation okay | NATHAN | NATHAN | | BIN | P | 6445924 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 01/07/2020 | drywall screw at tub/shower wall unit 303 missing stud and unit 104 missing common wall drywall, units 101-103,201-204, 301,302,304 okay per U305 and U344 | NATHAN | NATHAN | | BSP | P | 6445923 |
COMMONWEALTH CONSTRUCTION CORPORATION | BIN | P | 01/06/2020 | insulation at exterior tub/shower walls units 101-304 okay | NATHAN | NATHAN | | BIN | P | 6444421 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 01/03/2020 | unit 207 firecaulking at tub/shower area only corrected. | NATHAN | NATHAN | | BFR | P | 6443239 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 01/02/2020 | Firecaulking at tub wall penetrations only with completed required inspections 107-310, unit 207 need firecaulking at breezeway wall electric wire to top plate. | NATHAN | NATHAN | | BSP | P | 6441993 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 12/31/2019 | breezeway nailing for listing U344 okay except west breezeway south end level one drywall does not go behind landing steel beam | NATHAN | NATHAN | | BSP | P | 6440914 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 12/30/2019 | firecaulking at tub/shower walls with completed required inspections 101-306 okay, | NATHAN | NATHAN | | BSP | P | 6439822 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | R | 12/23/2019 | 3rd floor units 301-304 truss repairs completed, 2nd floor floor truss repairs not per detail 202, 204 1st floor floor truss repairs not per detail 102, 104 Need exterior breezeway rated assembly needs to be inspected before covering, Remaining frame items not inspected, dryer box in walls need to be back racked per cabinet detail see sticker on back of box, still need to putty pad electric boxes and firecaulking throughout. | NATHAN | NATHAN | | BFR | R | 6436139 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 12/17/2019 | met with superintendent Mike, PM Jason Olson, and framing foreman Mitch, discussed frame items , firecaulking, rated listing inspections and inspection sequencing. | NATHAN | NATHAN | | BFR | P | 6430380 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 12/13/2019 | 1st floor frame 105-110 unit 106 stud bearing and spacing at bathroom wall over 3" from floor truss and over 16" spacing, 105 have 30" overspan floor truss, 110 E truss not repaired per detail, mechanical room truss E missing gusset at ledger side and exterior end see orange marks | NATHAN | NATHAN | | BFR | P | 6427826 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | P | 12/12/2019 | 2nd floor 205,206,207,208,209,210 straps at plate breaks and FHA at lineset, exhaust fans installed in rated floor ceiling assembly, 207 floor truss repair needed next to interior wall, unit 208 and 210 drilled E floor joist over laundry wall . | NATHAN | NATHAN | | BFR | P | 6426265 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 12/09/2019 | 304, 306 need H10, 307 H10 and nail LGT2 at girder, missing MST12 at A truss in east breezeway, 310, H10 and SUR26 at hip jack, 308 H10 | NATHAN | NATHAN | | BSP | P | 6421619 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | R | 12/06/2019 | partial floor frame inspection and frame inspection at bathroom walls for possible prerock at 01-04 stack floor 1-3 , need overspan floor trusses corrected per engineers letter units 202, 204 x 2, 104, 102, broken floor truss at 201 need repair letter and fixed, need all MEP inspections and fire caulking completed also insulation will be needed after all other inspections then prerock can begin, engineer letters for changes on stamped plan need to come from design proffesional who stamped the plans, truss and floor truss repairs can come from truss manufacture. all repairs and changes must be approved spliced or engineer stamped depending on issue. | NATHAN | NATHAN | | BFR | R | 6419783 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | R | 12/04/2019 | walked top floor 01,02,02,04 stack discussed frame items needing corrected, many broken trusses and dislodged gusset plates at webs, need plans and trusses approved through RBD, missing nails in hangers, wrong hardware installed in spots, straps at plates and hold downs not installed completely. | NATHAN | NATHAN | | BFR | R | 6416857 |
COMMONWEALTH CONSTRUCTION CORPORATION | BFR | R | 12/02/2019 | Discussed rated assemblies not being continuous behind stringers and landing framing at breezeway, W4 wall detail calls for U305 which is a single wall single not double wall at bathrooms on ground floor, design professional to specify all systems used inside the listings, plans are still pending truss review for roof and floor trusses, floor trusses need strong backs installed, | NATHAN | NATHAN | | BFR | R | 6413593 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 10/17/2019 | discussed issues with Mike from Commonwealth and items needed for inspections and corrected with plans. | NATHAN | NATHAN | | BSP | P | 6372602 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 10/02/2019 | Spoke with Mike and Mike, trusses still pending on permit, dryer and washer boxes are not rated and in rated walls, discussed rated assemblies and listings. | NATHAN | NATHAN | | BSP | P | 6354487 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 08/19/2019 | trusses still pending units built to 2nd floor beginning 3rd floor | NATHAN | NATHAN | | BSP | P | 6306159 |
COMMONWEALTH CONSTRUCTION CORPORATION | BSP | P | 07/24/2019 | Reviewing plans and checking inspections trusses still pending. Trusses need to be reviewed and spliced into plan set. All listed assemblies need to be printed and on site for review. | NATHAN | NATHAN | | BSP | P | 6274618 |
ADVANCED ELECTRIC, LLC | ES | C | 06/08/2020 | Commercial Service: 1600A new service ok / no action required / | MIGUEL | MIGUEL | | ES | C | 6596875 |
ADVANCED ELECTRIC, LLC | E= | C | 06/08/2020 | splice of one-line received / corrections made / | MIGUEL | MIGUEL | | E= | C | 6596853 |
BW ELECTRIC, INC. | E= | C | 06/05/2020 | FIRE ALARM INSPECTION: FA complete / | MIGUEL | MIGUEL | | E= | C | 6595290 |
BW ELECTRIC, INC. | E= | C | 06/05/2020 | FIRE ALARM INSPECTION: riser room complete / | MIGUEL | MIGUEL | | E= | C | 6595273 |
ADVANCED ELECTRIC, LLC | EP | C | 05/28/2020 | 100A house panel ok / | MIGUEL | MIGUEL | | EP | C | 6586103 |
ADVANCED ELECTRIC, LLC | E= | P | 05/28/2020 | trash enclosure,trash room, attic spaces in each corridor ok / | MIGUEL | MIGUEL | | E= | P | 6586102 |
ADVANCED ELECTRIC, LLC | E= | P | 05/22/2020 | exterior receptacles ok / install disconnecting means at trash enclosure / | MIGUEL | MIGUEL | | E= | P | 6581762 |
ADVANCED ELECTRIC, LLC | EP | P | 05/19/2020 | 100A panels in 101,102,103,104,201,202,203,204,301,302,303,304 ok / | MIGUEL | MIGUEL | | EP | P | 6576594 |
ADVANCED ELECTRIC, LLC | E= | P | 05/14/2020 | corrections made in 108 / | MIGUEL | MIGUEL | | E= | P | 6572083 |
ADVANCED ELECTRIC, LLC | EP | P | 05/14/2020 | corrections made in 109, 209,309 / units 105,106,205,206,305,306 ok / | MIGUEL | MIGUEL | | EP | P | 6572082 |
ADVANCED ELECTRIC, LLC | EP | P | 05/12/2020 | units 107,108,109,110,207,208,209,210,207,208,309,310 / 108-correct closet fixture clearance, remove GFCIs above counter top / correct panel schedules in 109, 209,309 / 309 - dishwasher on 20A breaker, #14 wire / | MIGUEL | MIGUEL | | EP | P | 6568946 |
ADVANCED ELECTRIC, LLC | E= | P | 05/08/2020 | corrections in 107 and 109 ok / units 108,110,208,210,308,310 / 108-closet light does not meet clearances, re-phase white conductor at water heater j-box, ARC shield at outlet right of range / 110,208,210,308,310 ok / | MIGUEL | MIGUEL | | E= | P | 6566223 |
ADVANCED ELECTRIC, LLC | ER | C | 05/06/2020 | trash room ok / | MIGUEL | MIGUEL | | ER | C | 6563000 |
ADVANCED ELECTRIC, LLC | E= | P | 05/06/2020 | units 107,109,207,209,302,309 / 107-add outlet above kitchen counter right of range to meet spacing ,remove GFCI above kitchen counter in corner and protect at panel , hot ground reverse right of range in face, outlets need to be flush in backsplash or add ARC sheilds / 209-no power to receptacle by kitchen switch / 109,207,307,309 ok / ALL A/C UNITS 15A FUSED OK / | MIGUEL | MIGUEL | | E= | P | 6562990 |
ADVANCED ELECTRIC, LLC | E= | P | 05/01/2020 | 106 ok / 105 and all fully accessible units requires ADA hood, can not tamper with UL listing by re-wiring hood to meet requirements / A/C units need fuses installed / all 25A breakers in panels / units ending in 7 and 9 are min 12A max 20A , rest of units are min 10A max 15A / | MIGUEL | MIGUEL | | E= | P | 6558917 |
ADVANCED ELECTRIC, LLC | E= | P | 04/29/2020 | units 105,106, 205, 206, 305, 306 / 105-- gluing floors / 106-kitchen outlet right of range not gfci protected / typical to all units thus far- AFCI protection required micro, dishwasher, disposal, fridge and kitchen outlets / | MIGUEL | MIGUEL | | E= | P | 6556074 |
ADVANCED ELECTRIC, LLC | EP | P | 04/28/2020 | units 102,104,202,204,302,304 / install AFCI breakers where required / | MIGUEL | MIGUEL | | EP | P | 6554629 |
ADVANCED ELECTRIC, LLC | E= | P | 04/28/2020 | units 102,104,202,204,302,304 / 102- install double throw switch to control hood and hood lights independent from each other , if under kitchen sink remains open GFCI protection is required on disposal outlet / 25A A/C breaker typical through out / AFCI protection required through out in all units / | MIGUEL | MIGUEL | | E= | P | 6554628 |
ADVANCED ELECTRIC, LLC | EP | P | 04/27/2020 | 100A panels in 101,103,201,203,301,303 / install AFCI breakers where required / | MIGUEL | MIGUEL | | EP | P | 6552700 |
ADVANCED ELECTRIC, LLC | E= | P | 04/27/2020 | corrections made in 101,103,201,203,301,303 / waiting on A/C units and breaker locks in panels / | MIGUEL | MIGUEL | | E= | P | 6552698 |
ADVANCED ELECTRIC, LLC | E= | P | 04/24/2020 | units 101,103,201,203,301,303- typical to all----dishwasher requires GFCI protection, on ded 15A breaker , re-phase white conductors in panel on 2p breakers , 25A A/C breaker, inspect unit still , breaker lock on hood circuit / 103-install exterior GFCI / 301-hot ground reverse at outlet on face of cabinet by kitchen sink / AFCI protection required through out / | MIGUEL | MIGUEL | | E= | P | 6551461 |
ADVANCED ELECTRIC, LLC | ER | P | 04/16/2020 | sprinkler room ok / check surface mounted equipment on final / | MIGUEL | MIGUEL | | ER | P | 6542751 |
ADVANCED ELECTRIC, LLC | ES | P | 04/15/2020 | Commercial Service: 1600A 3w service ok to energize / ok to set meters for house panel, 101,102,103,104,105,106,107,108,109,110,201,202,203,204,205,206,207,208,209,210,301,302,303,304,305,306,307,308,309,310 / ALL UNITS ARE 100A / 31 UNITS TOTAL / RBD NOTES:one-line needs spliced to reflect what was installed- 250AL GEC from bus to cold water, 1/0 AL MC cable feeding sub panels, and 5 sets instead of 4 sets of (3) 600AL service conductors / | MIGUEL | MIGUEL | | ES | P | 6541279 |
BW ELECTRIC, INC. | E= | R | 04/13/2020 | FIRE ALARM INSPECTION: not ready / | MIGUEL | MIGUEL | | E= | R | 6538763 |
BW ELECTRIC, INC. | ER | P | 04/13/2020 | FIRE ALARM INSPECTION: still need riser room / | MIGUEL | MIGUEL | | ER | P | 6538762 |
BW ELECTRIC, INC. | E= | L | 04/09/2020 | FIRE ALARM INSPECTION: need POC | JOHNN | JOHNN | | E= | L | 6536150 |
BW ELECTRIC, INC. | ER | L | 04/09/2020 | FIRE ALARM INSPECTION: need POC and call ahead # | JOHNN | JOHNN | | ER | L | 6536147 |
ADVANCED ELECTRIC, LLC | EUG | P | 03/10/2020 | 1" from riser room to S pole light and trash enclosure / | MIGUEL | MIGUEL | | EUG | P | 6505613 |
ADVANCED ELECTRIC, LLC | ER | P | 02/06/2020 | corrections made in 108,208, 110 / | MIGUEL | MIGUEL | | ER | P | 6475672 |
ADVANCED ELECTRIC, LLC | ER | P | 02/05/2020 | correction 107 made / 108 add outlet in short wall / 208 add outlet in bedroom / 110 add dining outlets x2 / 210, 308, 310 ok / | MIGUEL | MIGUEL | | ER | P | 6474927 |
ADVANCED ELECTRIC, LLC | ER | P | 02/04/2020 | 107 drop bath outlet to meet requirements / 207,307,109,209,309 ok / | MIGUEL | MIGUEL | | ER | P | 6473695 |
ADVANCED ELECTRIC, LLC | ER | P | 01/29/2020 | units 105, 106, 205, 206, 305, 306 ok / | MIGUEL | MIGUEL | | ER | P | 6468536 |
ADVANCED ELECTRIC, LLC | EUG | P | 01/22/2020 | 3-4" PVC from pad location to gear at 48" to top / | MIGUEL | MIGUEL | | EUG | P | 6460458 |
BW ELECTRIC, INC. | ER | P | 01/15/2020 | FIRE ALARM INSPECTION: 107-110 ; 207-210 ;307-310 ok / provide info of voltage rating of cable, cable in same boxes w/ 120V smokes / | MIGUEL | MIGUEL | | ER | P | 6453990 |
BW ELECTRIC, INC. | ER | P | 12/20/2019 | FIRE ALARM INSPECTION: center tower --units --105--106--205--206--306--306---ok boxes and wire / | BRIAN | BRIAN | | ER | P | 6434356 |
BW ELECTRIC, INC. | E= | R | 12/19/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | R | 6432886 |
BW ELECTRIC, INC. | ER | P | 12/19/2019 | FIRE ALARM INSPECTION: units 101--102--103--104--201--202--203--204--301--302--303--304--ok / | BRIAN | BRIAN | | ER | P | 6432884 |
ADVANCED ELECTRIC, LLC | ER | P | 12/19/2019 | can not have cords in the hallow part of the ceiling for dryer booster fans / units 102-104-202-204 / ---units 101 103--201--203--301--3032--303--304 ok | BRIAN | BRIAN | | ER | P | 6432782 |
ADVANCED ELECTRIC, LLC | ER | P | 12/09/2019 | corrections made in 301, 302, 303, 304 / 202, 204 will need access for exhaust fan in mech room , typical per inner units ,all else ok in units / 201, 203 ok / FA contractor needs to call in inspections / | MIGUEL | MIGUEL | | ER | P | 6421288 |
ADVANCED ELECTRIC, LLC | ER | R | 12/05/2019 | in 301, 302, 303, 304: remove outlet in mech/ laundry room from dining room circuit / 6/3 AL range / 1/0 AL to panel, will need EP inspection when feeders and circuits are landed / no MCCs / need to attach fire alarm permit and request inspections / Discussed accessibility requirements with contractor / | MIGUEL | MIGUEL | | ER | R | 6418310 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | C | 08/18/2022 | ADDED NOTES 8/23/22: Engineer letter on shut down of dampers received from Architect Engineer of record (SEE IMAGES), CONTRACTOR COMPLETE. Mechanical splice on file for previous notes (E-Plan pg.#619-625/H4.0,H4.1,H5.0,H5.1,H5.2). FINAL PENDING-- ENGINEER TO ADDRESS SHUT DOWN OF UNITS SINCE SYSTEM IS DYNAMIC AND CRD'S ARE STATIC ONLY AND METER VERIFICATION LETTER FROM C.S.U. | PAULO | PAULO | | H= | C | 7487609 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 08/10/2022 | Mechanical splice on file for previous notes (E-Plan pg.#619-625/H4.0,H4.1,H5.0,H5.1,H5.2). FINAL PENDING-- ENGINEER TO ADDRESS SHUT DOWN OF UNITS SINCE SYSTEM IS DYNAMIC AND CRD'S ARE STATIC ONLY AND METER VERIFICATION LETTER FROM C.S.U. | PAULO | PAULO | | H= | P | 7478190 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 06/12/2020 | MECHANICAL FINAL OK PENDING SPLICE FOR DELETED BOOSTER FANS AND SPLICE FOR RELOCATED RETURNS, AND METER VERIFICATION LETTER FROM C.S.U. | BENH | BENH | | H= | P | 6602527 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 06/10/2020 | BUILDING 3: NEED SPLICE FOR DELETED BOOSTER FANS AND RELOCATED RETURNS , INSPECTION WAS FOR UNITS: 101,102, 107,108,109,110,207,208,209,210,307,308,309,310, ALL UNITS OK, STILL NEED CONCENTRIC CAP ON UNIT 303 AND NEED TO VERIFY CONDENSER UNIT LABELING AND LEVELING FOR ALL UNITS | BENH | BENH | | H= | P | 6599359 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 06/09/2020 | BUILDING 303 NEED CONCENTRIC CAP FOR VENT ON ROOF, UNIT 101 AND 102 THERMOSTAT TO BE TERMINATED NO HIGHER THAN 48" TO TOP OF THERMOSTAT, FURNACE VENT TO HAVE 2 STEP PROCESS PURPLE PRIMER AND GLUE , NEED INSULATION FOR SUCTION LINE ALL THE WAY TO EVAPORATOR CABINET, UNITS 103,104,105,106 ,201,202,203,204,205,206 ,301,302, AND 304 OK | BENH | BENH | | H= | P | 6597870 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 06/03/2020 | INSPECTION WAS FOR UNITS 301,302,303,304, NEED 30" OF SERVICE TO THE FURNACE, NEED TO PLUG UNUSED HOLES IN FURNACE, NEED TO SEAL EVAPORATOR COIL TO FURNACE, NEED TO LEVEL AND LABEL ALL CONDENSERS | BENH | BENH | | H= | P | 6591610 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | R | 05/28/2020 | CONTRACTOR TO WALK JOB PRIOR TO CALLING INSPECTION, NO CORRECTIONS TO UNITS FROM PREVIOUS INSPECTION, STOPPED INSPECTION RECALL WHEN READY | BENH | BENH | | H= | R | 6585532 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 05/21/2020 | BUILDING 3: NEED SPLICE FOR DELETED DRYER VENT BOOSTER FANS, UL LISTNG CHANGED TO P545 AND EXHAUST FANS ARE NOT APPROVED FOR LISTING REFER TO INSPECTION DATE 3/13/2020, FOLLOWING INSPECTION WAS FOR UNITS 301-,302,303,304: NEED THE FOLLOWING: SECONDARY PROTECTION FOR CONDENSATE DRAINS, NEED LIQUID LINE BRAZED IN TO EVAPORATOR COILS, NEED GASKET ON GAS LINE ENTERING FURNACE, NEED ACCESS DOORS ON RETURN RADIATION DAMPERS IN MECHANICAL ROOMS, SEAL RETURN PLENUMS AT FURNACE, NEED TO SECURE CONDENSATE DRAINS, NEED TO LABEL ALL CEILING RADIATION DAMPERS IN MECHANICAL ROOM, NEED INSTALLATION INSTRUCTIONS FOR INDOOR AND OUTDOOR COILS, MISSING CONCENTRIC CAP ON ROOF FOR UNIT 303, LABEL AND LEVEL CONDENSERS | BENH | BENH | | H= | P | 6579387 |
KIMBEL MECHANICAL SYSTEMS, INC. | HC | C | 05/14/2020 | UNLOCK METER THANKS | BENH | BENH | | HC | C | 6572291 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | C | 05/01/2020 | 30- 10 LB TEST OK | BENH | BENH | | HI | C | 6558177 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 04/30/2020 | THIS INSPECTION WAS FOR CONSULTATION ABOUT WHAT I NEED FOR GAS INSPECTION DUE TO BUILDING BEING SET ON FIRE, WILL NEED PRESSURE TEST AND SHEET ROCK REMOVED TO VERIFY NO DAMAGE TO GAS LINES | BENH | BENH | | HSP | P | 6556464 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 04/27/2020 | INSPECTION WAS FOR CONSULTATION WITH CONTRACTOR AND NEW G.C. ON WHAT IS REQUIRE FOR FINAL AND DISTANCE FROM DAMPERS AND SHEET ROCK SO CONTRACTOR CAN INSTALL REGISTERS, ALSO CONTRACTOR NEEDS TO PUT EXHAUST FLAPPERS ON ALL EXTERIOR AND MISSING CONCENTRIC CAP ON WEST SIDE OF BUILDING, NEED FIRE DAMPER ACCESS STICKERS IN MECHANICAL ROOMS, NEED TRANSFER GRILLE CUT IN TO LAUNDRY/MECHANICAL ROOMS | BENH | BENH | | H= | P | 6552037 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 04/23/2020 | BUILDING 3: INSPECTION WAS FOR UNIT 101: WILL NEED REVISED APPROVED PLANS ALLOWING DUCT TO GO FROM SQUARE TO ROUND, NEED THERMOSTAT INSTALLED, MISSING MAKE UP AIR GRILLE TO LAUNDRY ROOM, CONDENSER TO BE LABELED WHAT UNIT IT SERVES, CONDENSER TO BE LEVEL, LINE SET NEEDS TO BE TIED INTO INDOOR COIL AND CONDENSATE SECONDARY PLUGGED AT COIL, NEED TO LABEL FIRE DAMPER ACCESS, SUPPLY OPENINGS TO HAVE 1/16" MAXIMUM DISTANCE FROM SHEET ROCK TO DAMPER OPENINGS, NEED EXHAUST FAN DAMPER INSTALLATION INSTRUCTIONS TO CHECK SHEET ROCK CLEARANCES, NEED TO ADDRESS SHUT DOWNS OF FURNACE SINCE SYSTEM IS DYNAMIC AND DAMPERS ARE FOR STATIC SYSTEM ONLY | BENH | BENH | | H= | P | 6549198 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | R | 04/20/2020 | NOT READY MOCK 1 UNIT UP AND CALL FOR INSPECTION WHEN READY, HAVE DUCT WORK TIED INTO FURNACES, VENT TIED IN TO FURNACE, CONDENSATE DRAINS INSTALLED AND COMPLETED, REGISTERS LEFT OFF TO VERIFY DISTANCE FROM DAMPERS TO SHEET ROCK, THERMOSTATS INSTALLED AND IN ALL A UNITS TERMINATE THERMOSTAT NO HIGHER THAN 48" TO TOP, HAVE LINESETS BRAZED INTO CONDENSERS AND INDOOR COIL | BENH | BENH | | H= | R | 6544952 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 04/20/2020 | CEILING RADIATION DAMPER INSTRUCTIONS ATTACHED, SEE IMAGES | BENH | BENH | | H= | P | 6544620 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 04/17/2020 | WENT OVER INSTALLATION IN MECHANICAL ROOMS OF FURNACE INSTALLATION CLEARANCES TO DAMPER AND SHEET ROCK, NEED ALL SPLICES IN FOR BOOSTER FANS DELETED AND RETURN RELOCATIONS, CONDENSATES COMPLETED, CONDENSERS INSTALLED, THERMOSTATS INSTALLED AT 48" TO TOP OF THERMOSTAT IN ALL A UNITS, VENTS TO FURNACE COMPLETED, MOCK 1 UNIT UP COMPLETELY AND CALL FOR INSPECTION | BENH | BENH | | HSP | P | 6543627 |
KIMBEL MECHANICAL SYSTEMS, INC. | HC | C | 04/15/2020 | RELEASE 30 METERS FOR THIS ADDRESS THANKS | BENH | BENH | | HC | C | 6541913 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 04/15/2020 | updated 4/30/2020: HAD FIRE AT COMPLEX NEED PRESSURE TEST END UPDATE, SPLICE ATTACHED SHOW CSST , SEE IMAGES | BENH | BENH | | HI | P | 6540735 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 04/10/2020 | INSPECTION WAS ABOUT WHAT IS NEEDED FOR FINAL ON BUILDING 3, MOCK 1 UNIT UP AND HAVE INSTALLATION INSTRUCTIONS ON SITE FOR CEILING RADIATION DAMPERS TO CHECK CLEARANCES FROM DAMPER TO SHEET ROCK, HAVE INSTALLATION INSTRUCTIONS FOR FURNACE, IN ALL ACCESSIBILTY UNITS TERMINATE THERMOSTATS NO HIGHER THAN 48" TO TOP OF THERMOSTAT,HAVE CONDENSATE DRAINS COMPLETED, LINE SET TIED IN AND CONDENSER INSTALLED WITH INSTRUCTIONS, CALL FOR AN INSPECTION WHEN 1 UNIT IS READY | BENH | BENH | | HSP | P | 6537255 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 03/13/2020 | UL LISTING HAS CHANGED TO P545 AND EXHAUST FAN CEILING RADIATION DAMPERS ARE NOT APPROVED FOR THIS LISTING, ENGINEER TO ADDRESS, ALSO WILL NEED SPLICE FOR DELETED BOOSTER FANS FOR DRYER VENT , DRYER VENTS IN UNIT 105 AND 209 ARE OK NOW DUE TO ZERO LOSS ELBOWS INSTALLED, | BENH | BENH | | HD | P | 6510138 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | L | 03/04/2020 | CANCELED BY CONTRACTOR AT CALL AHEAD NOT READY | JERRYF | JERRYF | | HI | L | 6499421 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 02/01/2020 | BUILDING 3: BY FINAL WILL NEED TO SEE ALL FURNACES INSTALLED AND VENTS CONNECTED AND CONDENSATE DRAINS COMPLETED AND CONDENSERS INSTALLED AND VERIFY SHUT DOWNS OF ALL FURNACE, ALL ACCESSIBLE UNITS THERMOSTAT TO TERMINATE AT 48" FROM THE FLOOR TO THE TOP OF THERMOSTAT, ALL UNITS ABOVE CEILING AND CEILING RADIATION DAMPERS OK, EXCEPT UNIT 105, 209 DRYER VENT IS TOO LONG, | BENH | BENH | | HD | P | 6471700 |
KIMBEL MECHANICAL SYSTEMS, INC. | HRP | C | 02/01/2020 | BUILDING 3: 300 LB TEST OK TO ALL REMAINING UNITS FOR BUILDING | BENH | BENH | | HRP | C | 6471626 |
KIMBEL MECHANICAL SYSTEMS, INC. | HRP | P | 01/31/2020 | NOT ON TEST RE INSPECT ALL | BENH | BENH | | HRP | P | 6471624 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/31/2020 | BUILDING 3: UNITS 107, 110, 208, 210 AND 309 ALL DUCT AND CEILING RADIATION DAMPERS ABOVE CEILING OK, NEED THE FOLLOWING: UNIT 105 DRYER VENT HAS EXCEEDED ITS LIMIT WITH ALL ELBOWS INSTALLED, UNIT 108: NEED NAIL PROTECTION FOR LINE SET,UNIT 109: WOOD IS SPLIT IN BEDROOM #1 ON BOOT RAILS FOR CEILING RADIATION DAMPER, UNIT 207: NEED 2 SCREWS IN DAMPER SUPPORTS IN MECHANICAL ROOM, UNIT 209: DRYER VENT HAS EXCEEDED IT LIMIT WITH ALL ;ELBOWS INSTALLED AND NEED 2 SCREWS IN RADIATION DAMPER SUPPORT, UNIT 307: SUPPORT DRYER VENT EVERY 4 FEET AND IN BEDROOM WOOD IS SPLIT WHERE BOOT RAILS ARE INSTALLED, UNIT 308: COMPLETE INSULATION ON TRUNK LINE IN ATTIC ABOVE MECHANICAL ROOM, SUPPORT DRYER VENT, WOOD IS SPLIT IN BEDROOM #1 WHERE BOOT RAILS ARE INSTALLED, UNIT 310: DRYER VENT IS MISSING NAIL PROTECTION | BENH | BENH | | HD | P | 6471623 |
KIMBEL MECHANICAL SYSTEMS, INC. | HV | C | 01/31/2020 | BUILDING 3: ALL FURNACE VENTS FOR ENTIRE BUILDING OK | BENH | BENH | | HV | C | 6471615 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/31/2020 | BUILDING 3: NEED THE FOLLOWING: PLAN REVISION FOR RETURNS RELOCATED, TRUNK LINES CHANGED FROM ROUND TO SQUARE , SHUT DOWN OF ALL FURNACES SINCE DAMPERS ARE STATIC AND SYSTEM IS DYNAMIC, AND DELETION OF BOOSTER FANS UNIT 107: TIGHTEN STRAPS ON MAIN TRUNK LINE, UNIT 109: NEED SCREWS IN KITCHEN EXHAUST FAN SUPPORT, UNIT 207: DRYER VENT HAS EXCEEDED ITS LENGTH PER DRYER INSTALLATION INSTRUCTIONS, NEED TO USE UL LISTED TAPE ON BATH EXHAUST, UNIT 209: NEED 2 SCREWS IN BOOT RAILS FOR RADIATION DAMPERS IN MECHANICAL ROOM, CAN'T SPLICE BOOT RAIL ON RADIATION DAMPER, DRYER HAS EXCEEDED ITS LIMIT PER DRYER INSTALLATION INSTRUCTIONS | BENH | BENH | | HD | P | 6470546 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | T | 01/31/2020 | PAID (REC#1659434): AFTER-HOURS INSPECTION: $200 From: TERRI 1/31/20 4PM | TERRI | TERRI | | HD | T | 6470310 |
KIMBEL MECHANICAL SYSTEMS, INC. | HV | P | 01/29/2020 | BUILDING 3: UNIT 205,206,305,306 FURNACE VENTS OK, STILL NEED TO UNIT 105 AND 106 TO COMPLETE CENTER TOWER | BENH | BENH | | HV | P | 6467457 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/29/2020 | BUILDING 3: UNIT 205,206,305, 307 ABOVE CEILING OK | BENH | BENH | | HD | P | 6467454 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/28/2020 | BUILDING #3 NEED LETTER FROM ENGINEER APPROVING DELETION OF BOOSTER FANS FOR DRYER VENT, UNIT 205: SUPPORT DRYER VENT EVERY 4 FEET, CAN'T SPLICE CEILING RADIATION DAMPER SUPPORTS, NEED INSULATION ON LINE SET IN WALL UNIT 206: SUPPORT DRYER VENT EVERY 4 FEET, NEED 2 SCREWS ON KITCHEN EXHAUST DAMPER, NEED NAIL PROTECTION FOR DRYER VENT AND LINE SET IN MECHANICAL ROOM, NEED INSULATION FOR LINE SET IN WALL UNIT 305: SUPPORT DRYER VENT EVERY 4 FEET, NEED NAIL PROTECTION FOR LINE SET IN MECHANICAL ROOM UNIT 306: CAN'T SPLICE CEILING RADIATION DAMPER SUPPORT, NEED 2 SCREWS IN BATH EXHAUST DAMPER, NEED NAIL PROTECTION FOR LINE SET IN MECHANICAL ROOM, NEED INSULATION ON LINE SET IN BEDROOM #1 | BENH | BENH | | HD | P | 6466031 |
KIMBEL MECHANICAL SYSTEMS, INC. | HRP | P | 01/24/2020 | 12- 300 LB TEST OK ON UNITS: 101- 104, 201 - 204, 301 - 304 | BENH | BENH | | HRP | P | 6463934 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/24/2020 | BUILDING 3: STILL NEED LETTER FROM ENGINEER APPROVING DELETED BOOSTER FANS FOR DRYER, UNITS: 101- 104, 201- 204, 301 - 304 ABOVE CEILING OK | BENH | BENH | | HD | P | 6463878 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 01/23/2020 | 10 LB TEST OK ON UNITS 106,301,305, CAN'T RELEASE METER UNTIL REVISED APPROVED PLANS ARE SUBMITTED SHOWING CSST REPLACEMENT FOR METALLIC GAS PIPE | BENH | BENH | | HI | P | 6461557 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/23/2020 | BUILDING 3: SHEET H5.2 (BDA 155) UNITS 201,202,203,204 LINE SET TO BE SUPPORTED EVERY 6 FEET, NEED 2 SCREWS ON CEILING RADIATION DAMPERS IN MECHANICAL ROOM ON UNIT 204, UNIT 203 LINE SET LIQUID LINE TOUCHING DRYER VENT, ALL UNITS: FLEX CANNOT TOUCH SPRINKLER LINE | BENH | BENH | | HD | P | 6461549 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/22/2020 | BUILDING 3: SHEET H5.2 (BDA 155) UNIT 301 AND 303 NEED 2 SCREWS IN BOTTOM OF RAILING FOR CEILING RADIATION DAMPERS AND SUPPORT LINE SET EVERY 6 FEET, UNIT 302 AND 304 REQUIRE A BOOSTER FAN FOR DRYER VENT AND ACCESS FOR SERVICE ON BOOSTER FAN AND NEED 2 SCREWS IN THE BOTTOM OF RAILING TO TRUSSES ON ALL CEILING RADIATION DAMPERS AND SUPPORT LINE SET EVERY 6 FEET | BENH | BENH | | HD | P | 6460012 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 01/21/2020 | BUILDING 3: 10 LB TEST OK ON ALL UNITS EXCEPT FOR UNITS 106, 301, AND 305, STILL NEED NAIL PROTECTION FOR METER BANK ON INTERIOR SIDE | BENH | BENH | | HI | P | 6457908 |
KIMBEL MECHANICAL SYSTEMS, INC. | HV | P | 01/16/2020 | BUILDING 3: UNITS: 101 - 104,201- 204, 301- 304 NEED PROPER SLOPE AND HANGERS AT ELBOWS ON EXHAUST IN ATTIC | BENH | BENH | | HV | P | 6454848 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 01/15/2020 | UNIT 103: NEED THE FOLLOWING: ENGINEER TO ADDRESS HOW UNITS ARE GOING TO SHUT DOWN SINCE DAMPERS ABOVE FURNACE ARE FOR A STATIC SYSTEM ,NEED REVISED APPROVED PLANS FOR CHANGE OF ROUND TO SQUARE ON MAIN TRUNK LINE AND RETURN IS NOT INSTALLED PER PLANS THAT WILL ALSO REQUIRE A REVISION, NEED INSTALLATION INSTRUCTIONS ONSITE FOR FURNACE,BATH EXHAUST FANS, AND DRYER BOOSTER FANS, CONTRACTOR TO CALL HV INSPECTION FOR FURNACE VENTS WHEN READY, ANY LINE SET BRAZED IN CONCEALED LOCATION REQUIRES AN HRP INSPECTION AND FOR THE GAUGE TO BE AT 300 PSI AT TIME OF INSPECTION, CEILING RADIATION DAMPERS NEED TO BE A MINIMUM OF 3/4" OFF TRUSS PER INSTALLATION INSTRUCTIONS, KITCHEN EXHAUST DUCT NEEDS TO BE SUPPORTED, TRUNK LINE IN MECHANICAL ROOM NEEDS SUPPORT TO STRUCTURE, MISSING TRANSFER OPENING TO LAUNDRY ROOM, BATH EXHAUST AND DRYER VENT ARE TERMINATED ABOVE ELECTRICAL PANEL ON WEST SIDE OF BUILDING AND NEED TO MOVE OUT OF THAT SPACE PER CONVERSATION WITH ELECTRICAL INSPECTOR | BENH | BENH | | HD | P | 6453403 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 01/14/2020 | LETTER FROM AIRE TECHNOLOGIES APPROVING 14" TAKEOFF OFF DUCT BOARD PLENUM UPLOADED, SEE IMAGES | BENH | BENH | | HSP | P | 6451904 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 12/26/2019 | BUILDING 3:NEED REVISED PLANS FOR CSST INSTALLATION SINCE BLACK PIPE IS WHAT IS SUBMITTED, PROTECT ALL CSST IN EXTERIOR WALL AT METER BANK, NEED MANUFACTURERS NAIL PROTECTION, AT NEXT ONLY GAS PIPE TO BE AT 10 PSI NOT 15 PSI 10 LB TEST OK FOR UNIT: 101, 102,103,104, 201, 202,203,204, 310,302,303,304 | BENH | BENH | | HI | P | 6436679 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 12/23/2019 | NEED THE FOLLOWING: REVISED PLANS FOR SQUARE TRUNK LINE INSTALLATION, NAIL PROTECTION FOR LINE SETS, LINE SET TO BE SUPPORTED EVERY 6 FEET, NEED MINIMUM CLEARANCE OF 1" FROM RADIATION DAMPER AND TRUSSES, NEED INSTALLATION INSTRUCTIONS FOR FURNACE AND INLINE FANS AND EXHAUST FAN | BENH | BENH | | HD | P | 6435177 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 12/23/2019 | RECEIVED ENGINEER LETTER FOR APPROVAL OF DAMPERS, EXHAUST FANS, SEE IMAGES | BENH | BENH | | HSP | P | 6434894 |
KIMBEL MECHANICAL SYSTEMS, INC. | HD | P | 12/10/2019 | BUILDING 3:NEED TO ADDRESS HOW UNITS WILL SHUT DOWN SINCE DAMPERS ARE FOR A STATIC SYSTEM ONLY WILL NEED REVISED PLANS FOR GAS SINCE CSST WAS INSTALLED AND BLACK PIPE WAS SUBMITTED, NEED INSTALLATION INSTRUCTIONS FOR FURNACE, DRYER AND INLINE EXHAUST FANS, CEILING RADIATION DAMPERS ON 3RD FLOOR ARE NOT APPROVED FOR UL P522 ROOF /CEILING ASSEMBLY AND WILL NEED TO DO FURTHER RESEARCH TO SEE IF EXHAUST FANS ARE APPROVED FOR UL L563 FLOOR CEILING ASSEMBLY | BENH | BENH | | HD | P | 6422528 |
AMEN PLUMBING- HEATING | P= | C | 06/23/2020 | Plumbing was completed under new contractor 20957. | JACK | JACK | | P= | C | 6614494 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 06/23/2020 | See images for Engineers letter. | SAMH | SAMH | | P= | C | 6613701 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 06/23/2020 | See images for Engineers letter. | SAMH | SAMH | | PTO | C | 6613699 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 06/23/2020 | | SAMH | SAMH | | PB | C | 6613694 |
KIMBEL MECHANICAL SYSTEMS, INC. | P=S | R | 06/19/2020 | Need Engineers stamp on letter. | SAMH | SAMH | | P=S | R | 6610448 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | R | 06/19/2020 | Need Engineers stamp on letter. | SAMH | SAMH | | P= | R | 6610437 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/21/2020 | Need Engineers letter for insulation. | SAMH | SAMH | | P= | P | 6579454 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/20/2020 | 2nd and 3rd floors complete. | SAMH | SAMH | | P= | P | 6577887 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/19/2020 | Walked 1st floor. Need trap guards in Water entry room, and all Accessible bathrooms. Toilet is over 18" from wall in 102. Trip lever needs to be on open side of wall at room 102. | SAMH | SAMH | | P= | P | 6576970 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 04/27/2020 | Consultation for Plumbing Final. | SAMH | SAMH | | P= | P | 6552772 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 02/13/2020 | still need engineers letter allowing not to insulate all waters (per plan), rest ok | JOHNS | JOHNS | | PTO | P | 6481966 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 02/07/2020 | cancelled by contractor via text message, will reschedule for Monday, STILL NEED ENGINEERS LETTER | JOHNS | JOHNS | | PTO | L | 6476957 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 02/03/2020 | hose bibs ok. | TAYLOR | TAYLOR | | PTO | P | 6472897 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/31/2020 | ok for hose bibs only MINUS @ 102 leak @ west hose bib, freeze pro @ east hose bib, and freeze pro @ 108
still need- E letter for not insulating water lines, middle and east tower 1st floor tub / shwr valves, 1st floor water closets, and 1st floor accessible measuements @ middle and east tower | JOHNS | JOHNS | | PTO | P | 6471383 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/28/2020 | discussed accessible elements | JOHNS | JOHNS | | PTO | P | 6466132 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/23/2020 | ok for west tower corrections only MINUS need engineers letter allowing to not insulate water lines (on plans)
still need other tower corrections | JOHNS | JOHNS | | PTO | P | 6461678 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/22/2020 | ok for tub correction @ 104 only, all other tub corrections @ west tower still apply, low test @ 2nd 3rd floor tub valves
still need all items listed on 1/17/20 | JOHNS | JOHNS | | PTO | P | 6460107 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/21/2020 | ok for tubs, water closets, and tub valves @ 103, 101, 106, 205, 206, 305, and 306 MINUS @ 103 leak at tub and still need tub @ 305
still need all tub / shwr valves tested, all 1 st floor water closets, shwrs, and all accessible measurements @ 1st floor
ok for tubs, water closets, and valves @ 207, 20-8, 209, 210, 307, 308, 309, and 110 MINUS need to test all valves
still need 1 st floor water closets, tub/shwrs, valves, and accessible measurements @ thiis area
still need areas mentioned @ previous results
| JOHNS | JOHNS | | PTO | P | 6458284 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/17/2020 | ok for west tower 2nd and 3rd floor @ both sides of hall way water closets, tub tests, and tub valves minus @ 103, 104, and 201 for upper tub taps not level, @ 202 re attach strap for tub drain, @ 203 open 3" pipe above laundry, and need to test all tub valves
still need-- 1st floor west tower water closets, tubs / shwrs to include valves, and west tower 1st floor accessible measurements, remainder of fernco repairs (re test required), remainder of tub / shwr valves installed to include 1st floor accessible measurements, all hose bibs (units 102 (x2)/ 104 (x2)/ 108/ and 110 ), all pipes insulated per plan, remainder of flanges set, remainder tub tests, remainder of 1st floor accessible measurements | JOHNS | JOHNS | | PTO | P | 6456368 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/14/2020 | ok for fernco repair @ 203 only
still need remainder of fercnos replaced and all items noted on 1/2/20 inspection results | JOHNS | JOHNS | | PTO | P | 6452602 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/06/2020 | ok for correction @ 110 only
still need all other items listed on 1/2/20 results | JOHNS | JOHNS | | PTO | P | 6444052 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/03/2020 | ok for ferco repairs @ 307/ 310/ 210/ and 110 only, STILL have back grade @ 110
still need all items listed @ previous results | JOHNS | JOHNS | | PTO | P | 6442891 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 01/02/2020 | ok for previous corrections MINUS still have back grade @ 110 kitchen
ok for fernco repairs @ 107/ 109/ 209/ and 309 STILL NEED repair @ ferco in unit 307 (re test required)
still need-- all ferco repairs (test required at all units not listed above), all tub / shwr valves installed, all hose bibs (units 102 (x2)/ 104 (x2)/ 108/ and 110 ), all pipes insulated per plan, all flanges set, all tub tests, all accessible measurements and any remaining not listed here | JOHNS | JOHNS | | PTO | P | 6441611 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/20/2019 | ok for dwv @ 107/ 109/ 207/ 209/ 307/ 309 and corrections from yesterday minus secure all flanges, @ 107 low test @ lav vent line, 310 support and strap 2" attic vents per code, and still need correction @ 110 and 208, need all ferncos removed through out and install engineers spec mission bands (re test required @ all repairs)
still need-- all tub / shwr valves installed, all hose bibs (units 102 (x2)/ 104 (x2)/ 108/ and 110 ), all pipes insulated per plan, all flanges set, all tub tests, all accessible measurements and any remaining not listed here | JOHNS | JOHNS | | PTO | P | 6433817 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/19/2019 | ok for dwv / main waters/ and domestic waters only @ 108/ 110/ 208/ 210/ 308/ 310 and water entry, @ 108 leak @ lav vent, 110 back grade @ kitchen, 208 check slope for lav @ upper, 210 s-trap @ washer floor drain, need all flanges set, need all tub valves set, hosebibs, insulation @ waters, hammer arrestors @ all washer box supplies, rest ok for these rooms
still need all previous dwv / h20 corrections, tub tests, and accessible measurements | JOHNS | JOHNS | | PTO | P | 6432231 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/19/2019 | ok for dwv / main water/ domestic waters @ 108/ 110/ 208/ 210/ 308/ 310 and water entry minus dwv @ water entry, @ 108 leak @ lav vent, 110 back grade @ kitchen, 208 check slope @ lav for upper, 210 s-trap @ washer floor drain, need all flanges set, need all tub valves set, waters insulated, hose bibs, rest ok for these rooms
still need all previous corrections, tub test, and accessible measurements, remaning dwv / h20 | JOHNS | JOHNS | | PTO | P | 6432215 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 12/18/2019 | field cancelled, (plbr had leak and cancelled inspection) | JOHNS | JOHNS | | PTO | L | 6430870 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/17/2019 | called in by accident, these rooms were looked @ on 12/10/19 for water pipe only | JOHNS | JOHNS | | PTO | P | 6430199 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/13/2019 | ok for middle tower dwv corrections only
still need all previous dwv corrections, water corrections / tub tests / and accessible measurements | JOHNS | JOHNS | | PTO | P | 6427499 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/12/2019 | ok for previous dwv corrections @ middle tower only minus 105 / 205 / and 305 water closet vent lost test
still need previous dwv corrections @ west tower, water corrections / tub tests / and accessible measurements | JOHNS | JOHNS | | PTO | P | 6425998 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/11/2019 | set all flanges, mid span @ 2" and smaller lines, test 1st floor washer boxes and kitchen @ 105, 105 / 205 / 305 lost test, rest ok for dwv @ 105 / 106 / 205 / 206 / 305 / and 306 only
still need water corrections / hose bibs / tub test / and accessible measurements | JOHNS | JOHNS | | PTO | P | 6423649 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/10/2019 | looked at water pipe only center block, still need to see all tub and shower valves installed in these units. rest of water ok @ 105,106,107,109,205,206,207,209,305,306,307,309 | JOSEPHD | JOSEPHD | | PTO | P | 6422078 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 12/09/2019 | cancelled per call from contractor @ 8:15 am | JOHNS | JOHNS | | PTO | L | 6420234 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/06/2019 | P-trap supports DWV the following units: 201-202-203-204-301-302-303-304. | DANR | DANR | | PTO | P | 6418595 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/05/2019 | ok for 1st floor washer box tests, previous dwv corrections minus set all flanges and strap trap lines
still need domestic water corrections / accessible measurements / tub tests @ west tower / remaining towers | JOHNS | JOHNS | | PTO | P | 6417148 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/04/2019 | ok for main / domestic waters @ 101-304, minus pipe insulation (per plans), hammer arrestors @ all washer boxes, and hose bibs
still need dwv corrections/ accessible measurements / and tub inspections for west tower (101-304) | JOHNS | JOHNS | | PTO | P | 6416018 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/03/2019 | BLDG 3
set all flanges, need to flow test all first floor washer box's, @ 102 back grade @ kitchen drain, @ 101 back grade @ upr water closet, need mid span backing @ all 2" and smaller lines, strap all trap lines, rest ok for rm#'s 101 - 304 DWV only.
NOTE: vtr, check water htrs, water entry, and softner @ final, need to verify hammer arrestors @ all washer boxes @ final, ground floor units w/ tubs= TYPE B ground floor units w/ shwrs =TYPE A, by final need pics of all 1st floor flanges secured, verify water closet side measurements and water closet positioning on final
still need main waters / domestic waters / tubs / and accessible measurements for these rooms | JOHNS | JOHNS | | PTO | P | 6414406 |
KIMBEL MECHANICAL SYSTEMS, INC. | P16 | P | 09/12/2019 | any plbg revisions / engineers letter needed / special inspections will be posted here
1. will allow flow test @ 1st floor w.b. off sets - 9/12/19 PTO ---COMPLETE 12/5/19-- | JOHNS | JOHNS | | P16 | P | 6333887 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 09/12/2019 | more of a consultation for testing reqs @ washer boxes | JOHNS | JOHNS | | PTO | P | 6333876 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 06/27/2019 | Mechanical room dwv ok, plans marked. | DANR | DANR | | PB | P | 6247139 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 06/25/2019 | east units ok | JOSEPHD | JOSEPHD | | PB | P | 6243549 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 06/21/2019 | need to see north west 4" run to kitchen sinks backfilled and graded, ok to cover first 4 units west side except previously stated area, still need to see rest of building | JOSEPHD | JOSEPHD | | PB | P | 6239967 |
AMEN PLUMBING- HEATING | PB | P | 05/28/2019 | 3- 2" under breeze ways ok | JOSEPHD | JOSEPHD | | PB | P | 6211803 |
AMEN PLUMBING- HEATING | PB | P | 04/18/2019 | hosebibb lines run under floor ok | JOSEPHD | JOSEPHD | | PB | P | 6169868 |
AMEN PLUMBING- HEATING | PB | P | 04/15/2019 | deep under ground ok | JOSEPHD | JOSEPHD | | PB | P | 6165898 |
KIMBEL MECHANICAL SYSTEMS, INC. | XMS | T | 06/16/2022 | PAID (REC#1879128) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to remove booster fans, revise duct layout, and return air path. Changes okay per JE | JUSTINC | JUSTINC | | XMS | T | 7413275 |
BW ELECTRIC, INC. | XES | T | 06/04/2020 | PAID (REC#1879127) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised GEC. | BERTHA | BERTHA | | XES | T | 6594360 |
BW ELECTRIC, INC. | XES | T | 06/04/2020 | PAID (REC#1879127) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised breakers. | BERTHA | BERTHA | | XES | T | 6594355 |
BW ELECTRIC, INC. | XES | T | 06/02/2020 | PAID (REC#1879127) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised service conductor, GEC and available fault current. | BERTHA | BERTHA | | XES | T | 6590119 |
COMMONWEALTH CONSTRUCTION CORPORATION | XBS | P | 04/22/2020 | PLAN SPLICE: (No Fee) by: BPHILLIPS for Construction: Revised R/C assembly listing. | BPHILLIPS | BPHILLIPS | | XBS | P | 6547361 |
COMMONWEALTH CONSTRUCTION CORPORATION | XBS | T | 12/03/2019 | PAID (REC#1648308) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided floor and roof trusses with stamped layout. | BPHILLIPS | BPHILLIPS | | XBS | T | 6414853 |