KTK GENERAL CONTRACTING LIMITED | B= | C | 04/17/2019 | | JANE | JANE | | B= | C | 6168088 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 04/11/2019 | Temp CO: waiting for finals on mechanical, both contractors ( Expires: 5/11/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6162911 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 04/09/2019 | complete other finals/rest ok. Additional Inspections Required (computer generated): ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, ANYTHING HVAC, LLC. Mechanical Final Inspection is not Completed yet, LEGACY AIR HVAC, LLC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6159766 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 04/08/2019 | complete other roughs -- groove in front of accessible door over 1/4" in height change -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: falconfire@falconfirepd.org or 495-4050), ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, ANYTHING HVAC, LLC. Mechanical Final Inspection is not Completed yet, LEGACY AIR HVAC, LLC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6158458 |
KTK GENERAL CONTRACTING LIMITED | BFR | P | 02/22/2019 | complete all MEP roughs/ frame is per plan -- reviewed accessibility | SCOTTS | SCOTTS | | BFR | P | 6114542 |
ADVANCED ELECTRIC GROUP | E= | C | 04/11/2019 | Thanks for the pictures | CRAIG | CRAIG | | E= | C | 6162281 |
ADVANCED ELECTRIC GROUP | EP | C | 04/08/2019 | 400 amp 4/w past through lugs ok | CRAIG | CRAIG | | EP | C | 6159148 |
ADVANCED ELECTRIC GROUP | ER | P | 03/28/2019 | CEILING IN BACK ROOM OK ------ | GREGM | GREGM | | ER | P | 6147270 |
ADVANCED ELECTRIC GROUP | ER | P | 03/01/2019 | hard lid ceiling in main area / hallway / bathrooms ok | CRAIG | CRAIG | | ER | P | 6121471 |
ADVANCED ELECTRIC GROUP | ER | P | 02/25/2019 | WALLS ONLY | CRAIG | CRAIG | | ER | P | 6116907 |
ADVANCED ELECTRIC GROUP | EUG | P | 02/14/2019 | called in wrong | CRAIG | CRAIG | | EUG | P | 6107838 |
ADVANCED ELECTRIC GROUP | ESL | P | 02/08/2019 | 42 - 3/4" power and data ----------- 1 - 1/2" pvc for data | CRAIG | CRAIG | | ESL | P | 6102368 |
LEGACY AIR HVAC, LLC | H= | C | 04/15/2019 | | MARKB | MARKB | | H= | C | 6166333 |
LEGACY AIR HVAC, LLC | HC | C | 04/15/2019 | ADDING WATER HEATER TO METER PER PLAN FOR INTERIOR FINISH | MARKB | MARKB | | HC | C | 6166332 |
LEGACY AIR HVAC, LLC | HI | C | 04/15/2019 | | MARKB | MARKB | | HI | C | 6166322 |
ANYTHING HVAC, LLC. | H= | C | 04/15/2019 | Engineer letter received addressing TAB report and equipment | MARKB | MARKB | | H= | C | 6165222 |
LEGACY AIR HVAC, LLC | H= | P | 04/09/2019 | Can final once contractor request a final. | MARKB | MARKB | | H= | P | 6160547 |
LEGACY AIR HVAC, LLC | HRP | C | 04/09/2019 | Corrections made | MARKB | MARKB | | HRP | C | 6160543 |
ANYTHING HVAC, LLC. | H= | P | 04/09/2019 | ITEMS THAT NEED TO BE ADDRESSED PER TEST AND BALANCE REPORT - Need engineer to address RTU change in manufacturer and model. EF-1 is not within 10% of schedule. DIFFUSER AND OUTSIDE AIR READINGS ARE WITHIN 10% OF PLANS | MARKB | MARKB | | H= | P | 6159646 |
LEGACY AIR HVAC, LLC | HRP | P | 04/05/2019 | Complete suction line insulation behind ice machine and label unit on roof. NO PRESSURE TEST REQUIRED - FACTORY LINESET WITH NO CONCEALED FITTINGS. | MARKB | MARKB | | HRP | P | 6156719 |
ANYTHING HVAC, LLC. | H= | P | 04/05/2019 | FINAL PENDING - Test And Balance Report | MARKB | MARKB | | H= | P | 6156699 |
ANYTHING HVAC, LLC. | H= | R | 04/03/2019 | ----Need refrigeration contractor attached to permit for ice machine---- Can put on a final partial once refrigeration contractor is attached. CONDENSATE DISPOSAL FOR WATER HEATER COMPLETE. Still need test and balance report. | MARKB | MARKB | | H= | R | 6154097 |
LEGACY AIR HVAC, LLC | HI | R | 04/03/2019 | High test - Gas piping per plan | MARKB | MARKB | | HI | R | 6154089 |
ANYTHING HVAC, LLC. | HD | C | 03/27/2019 | ----Need refrigeration contractor attached to permit for ice machine---- FOR FINAL - get ref contractor attached, complete condensate for water heater and provide test and balance report. ABOVE CEILING DUCT - SUPPLY/RETURN/GRILLS FOR RTU-1 PER PLAN. ALL OTHER FLEX AND DIFFUSERS COMPLETE. SMOKE SHUTDOWN AND REMOTE INDICATORS VERIFIED. | MARKB | MARKB | | HD | C | 6146665 |
ANYTHING HVAC, LLC. | HV | P | 03/27/2019 | Need to complete condensate for water heater. WATER HEATER VENT COMPLETE PER MANUFACTURER INSTRUCTIONS. | MARKB | MARKB | | HV | P | 6146648 |
ANYTHING HVAC, LLC. | HD | P | 02/19/2019 | ABOVE CEILING DUCT - SUPPLY/EXHAUST MAINS/BRANCHES FOR RTU-2 INSTALLED PER PLAN OK TO WRAP. No flex, diffusers or volume dampers | MARKB | MARKB | | HD | P | 6111002 |
PLUMBING BY GEORGE LTD. | P= | C | 04/05/2019 | correction made | TED | TED | | P= | C | 6156277 |
PLUMBING BY GEORGE LTD. | P= | P | 04/04/2019 | need yard hydrant supply run off irrigation backflow, need water hammer on ice maker supply, rest ok | TED | TED | | P= | P | 6154851 |
PLUMBING BY GEORGE LTD. | PTO | C | 03/01/2019 | insulation ok | TED | TED | | PTO | C | 6121098 |
PLUMBING BY GEORGE LTD. | PTO | P | 02/26/2019 | water piping ok, insulation as needed in walls ok, still need over head insulation | TED | TED | | PTO | P | 6117317 |
PLUMBING BY GEORGE LTD. | PTO | P | 02/25/2019 | dwv ok, still working on water piping in mech. room | TED | TED | | PTO | P | 6116174 |
PLUMBING BY GEORGE LTD. | PB | C | 02/11/2019 | under slab water lines and trap primer lines | TED | TED | | PB | C | 6103224 |
PLUMBING BY GEORGE LTD. | PB | P | 02/05/2019 | grease lines test and design ok, still will need to run trap primer and under slab water lines to complete base | TED | TED | | PB | P | 6097623 |
PLUMBING BY GEORGE LTD. | PB | P | 02/01/2019 | to many questions on grease lines, need plumber on site for answers, sanitary drains ok | TED | TED | | PB | P | 6094928 |
KTK GENERAL CONTRACTING LIMITED | XBS | T | 02/27/2019 | PAID (REC#1579058) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised back room to include furred wall. | SHELLEY | SHELLEY | | XBS | T | 6118544 |
KTK GENERAL CONTRACTING LIMITED | XMS | P | 02/06/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised total developed length and changed sheet number | JUSTINC | JUSTINC | | XMS | P | 6099242 |
KTK GENERAL CONTRACTING LIMITED | XBS | T | 02/04/2019 | PAID (REC#1577892) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: minor layout changes | LBENNETT | LBENNETT | | XBS | T | 6096894 |
PLUMBING BY GEORGE LTD. | XPS | T | 02/04/2019 | PAID (REC#1573973) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 2/4/19: Addendum A relocated hand sink and piping. | SHANEN | SHANEN | | XPS | T | 6096818 |