ROBERT SCOTT GENERAL CONTRACTORS, INC. | B= | C | 02/26/2020 | | NICK | NICK | | B= | C | 6493103 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BTR | C | 08/15/2019 | | NICK | NICK | | BTR | C | 6301831 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFR | C | 08/01/2019 | Letter from architect on file for ledger | NICK | NICK | | BFR | C | 6285208 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BLA | C | 07/17/2019 | By final need weep screen at back patio to be 1/2" above concrete serface / Lath OK | NICK | NICK | | BLA | C | 6266914 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFR | P | 07/12/2019 | For letter on site about ledger from architect, stamp is unable to be red. Need new copy of letter with stamp from architect that is legible / All other framing items completed | NICK | NICK | | BFR | P | 6261750 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BIN | R | 07/10/2019 | Insulation OK / Need to complete frame | PARKER | PARKER | | BIN | R | 6259360 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFR | P | 07/08/2019 | Need to complete dry in of roof (plumbing jacks) / Need Eng for ledger installed at 2nd bedroom for trusses / Need to install double H2.5T for all bearing locations of D trusses / Need to glue shims of beam pockets in crawl space / Need to back fill under footing where plumbing gone through | NICK | NICK | | BFR | P | 6255748 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFD | C | 03/27/2019 | Drain of usable space OK / Damp proof OK / Daylights to front of house | NICK | NICK | | BFD | C | 6146087 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFN | C | 03/21/2019 | Formwork & reinforcement for foundation walls and interior pads OK per plans / ufer observed in garage wall | RICHB | RICHB | | BFN | C | 6140386 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFT | C | 03/21/2019 | Formwork & reinforcement for continuous footing OK per plans | RICHB | RICHB | | BFT | C | 6140374 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFT | P | 03/19/2019 | Open Hole received - 2000 psf, drain required at usable, 10% surface grading required | RICHB | RICHB | | BFT | P | 6136337 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFT | P | 03/19/2019 | Foundation Design received - 2000 psf | RICHB | RICHB | | BFT | P | 6136333 |
ROBERT SCOTT GENERAL CONTRACTORS, INC. | BFT | P | 03/18/2019 | Spoke with Contractor via phone - Authorized 3rd party engineer inspection with all observation paperwork to follow / need stamped copy of Foundation Design | RICHB | RICHB | | BFT | P | 6135966 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | E= | C | 01/28/2020 | | JOHNN | JOHNN | | E= | C | 6466569 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | E= | T | 01/21/2020 | PAID (REC#1658555) NO CORRECTIONS MADE, | JOHNN | JOHNN | | E= | T | 6458737 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | E= | R | 01/14/2020 | new correction: crawler furnace was tapped: 14 awg to 12 awg, and has open j box,-------other corrections ok, | JOHNN | JOHNN | | E= | R | 6452735 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | E= | R | 12/23/2019 | garage door opener needs gfci, furnace needs dedicated coircuit, has garage door opener on it, crawler: missing plate on furnace and gfci, #10 nm cable laying on ground, need box,plate,cap off,staple, oven: remove black tape from connector in disco, rear patio outlet in use cover mounted upside down, nail plate at hood, open j box under cooktop, also needs nm connector and grd, --------15 amp a/c,ok | JOHNN | JOHNN | | E= | R | 6435505 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | ES | C | 07/05/2019 | Residential Underground: new 200 amp, 3-wire service | GARYL | GARYL | | ES | C | 6254496 |
ROCKY MOUNTAIN ELECTRICAL SERVICES INC | ER | C | 07/05/2019 | crawls space--okay, no mcc., no cen/vac, no bathroom floor heat , | GARYL | GARYL | | ER | C | 6254495 |
GENE'S HEATING AND AIR LLC | H= | C | 12/26/2019 | note 2 direct vent furnaces , louver doors to upstairs furnaces. upstairs unit coil only no line set or condenser , crawler conditioned , a/c complete | DAVIDH | DAVIDH | | H= | C | 6436686 |
KROME GAS AND PLUMBING CO., INC. | HI | C | 07/05/2019 | 10 lb test okay, note 1 1/4" main 2 furnaces , 1 water heater , 1 fireplace ,1 cook top and bbq | DAVIDH | DAVIDH | | HI | C | 6254540 |
GENE'S HEATING AND AIR LLC | HC | C | 07/03/2019 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6252351 |
GENE'S HEATING AND AIR LLC | HRR | C | 07/03/2019 | complete | DAVIDH | DAVIDH | | HRR | C | 6252349 |
GENE'S HEATING AND AIR LLC | HRR | P | 07/02/2019 | will need furnace install manual to verify vent clearance to a window note a/c coil. outside air tied to return air of furnace damper.direct vent furnace | DAVIDH | DAVIDH | | HRR | P | 6251793 |
GENE'S HEATING AND AIR LLC | HRR | P | 07/02/2019 | scanned equip change letter see image | DAVIDH | DAVIDH | | HRR | P | 6250807 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 06/24/2019 | | DAVIDH | DAVIDH | | HV | C | 6241891 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 06/19/2019 | ---will need to see non combustible material installed per the manufacturers instructions OK to attach a picture of the installed material at next inspection request.--------Framing and Vent clearances OK for main level fire place,-- | TREVORH | TREVORH | | HV | P | 6237154 |
FAIRWAY PLUMBING & HEATING, INC. | P= | C | 01/13/2020 | PVB installed. | SAMH | SAMH | | P= | C | 6451558 |
FAIRWAY PLUMBING & HEATING, INC. | PTO | C | 07/02/2019 | note: irrigation stub, aav @ 1 master lav, cwv @ 1 master lav, | JOSEPHD | JOSEPHD | | PTO | C | 6251698 |