THE COPESTONE COMPANY | B= | C | 10/25/2019 | Items corrected | DAKOTAB | DAKOTAB | | B= | C | 6381269 |
THE COPESTONE COMPANY | B= | P | 08/28/2019 | missing signage for bathrooms -- sinks installed both bathrooms within 60" clearance and one sink over 34" -- complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ALPHALETE MECHANICAL LLC Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6317330 |
THE COPESTONE COMPANY | BFR | P | 03/26/2019 | wall framing ok/complete other rough inspections/ Reviewed Accessible Elements / | SCOTTS | SCOTTS | | BFR | P | 6144798 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 08/15/2019 | Electrical complete / | ROB | ROB | | E= | C | 6302023 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 03/25/2019 | Walls only | JOSEPH | JOSEPH | | ER | P | 6142833 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 09/18/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6338923 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 09/17/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 6337517 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/15/2019 | HEAT FINAL OK;. PARTIAL PENDING TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6302557 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/11/2019 | ALL SUPPLY, RETURN, AND EXHAUST ABOVE CEILING DUCT ROUGH OK / OK TO WRAP. EXHAUST FAN ON ROOF OK / NEED TO LABEL FOR UNIT ADDRESS. (NEED TEST AND BALANCE REPORT BY FINAL.) | LIDO | LIDO | | HD | P | 6163267 |
ALPHALETE MECHANICAL LLC | P= | C | 10/24/2019 | Corrections made. | SAMH | SAMH | | P= | C | 6378989 |
ALPHALETE MECHANICAL LLC | P= | P | 10/23/2019 | Lacking 5' clearance at Men's restroom sink. Rest OK. Note: Plan splice for grease waste attached to M19255 | SAMH | SAMH | | P= | P | 6377527 |
ALPHALETE MECHANICAL LLC | P= | L | 10/11/2019 | sent call ahead, 12:50, door locker no lock box code, still need plan splice for grease waste | TED | TED | | P= | L | 6366023 |
ALPHALETE MECHANICAL LLC | P= | R | 08/08/2019 | Not ready. Still need plan splice for grease waste, and complete white box plan. | SAMH | SAMH | | P= | R | 6294030 |
ALPHALETE MECHANICAL LLC | PTO | P | 04/09/2019 | bathrooms in wall ok, still need to complete rest white box plan | TED | TED | | PTO | P | 6160271 |
ALPHALETE MECHANICAL LLC | PTO | P | 04/02/2019 | field cancel | TED | TED | | PTO | P | 6152163 |
ALPHALETE MECHANICAL LLC | PB | C | 02/28/2019 | correction made, still need plan change splice | TED | TED | | PB | C | 6120386 |
ALPHALETE MECHANICAL LLC | PB | R | 02/27/2019 | grease drain piping not to plan design and missing vents, need plan revised, note: sanitary base ok | TED | TED | | PB | R | 6119235 |