THE COPESTONE COMPANY | B= | C | 09/28/2021 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 7122849 |
THE COPESTONE COMPANY | B= | P | 09/22/2021 | still pending required external inspections. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | BRIANB | BRIANB | | B= | P | 7115625 |
THE COPESTONE COMPANY | BE | P | 03/25/2021 | | MATTHEWM | MATTHEWM | | BE | P | 6910051 |
THE COPESTONE COMPANY | BE | C | 09/22/2020 | | BECKYA | BECKYA | | BE | C | 6713700 |
THE COPESTONE COMPANY | B= | P | 04/30/2020 | frame and final. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | BOBF | BOBF | | B= | P | 6557383 |
THE COPESTONE COMPANY | BFR | P | 12/19/2019 | 3rd party observation report for welding and bolting structural connections on file | BRIANB | BRIANB | | BFR | P | 6432077 |
THE COPESTONE COMPANY | BBB | C | 12/19/2019 | observation letter for structural masonry on file | BRIANB | BRIANB | | BBB | C | 6432070 |
THE COPESTONE COMPANY | BFN | C | 12/19/2019 | Engineer letter for foundation on file | BRIANB | BRIANB | | BFN | C | 6432069 |
THE COPESTONE COMPANY | BFT | C | 12/19/2019 | Engineer letter for footing on file | BRIANB | BRIANB | | BFT | C | 6432066 |
THE COPESTONE COMPANY | B= | R | 12/18/2019 | need observation letters for foundation components - bond beam - bar joist and connections - all structural steel to complete foundation - bond beam - frame inspections / penetrations in exterior wall over rear doors / went over inspection history with site rep Stephan. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), DILLER ELECTRIC Electrical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | R | 6431435 |
THE COPESTONE COMPANY | BFI | P | 11/08/2019 | Engineer letter for vertical R-10 insulation on file | DAKOTAB | DAKOTAB | | BFI | P | 6392609 |
THE COPESTONE COMPANY | BIN | P | 11/05/2019 | observed batt insulation at exterior walls / per conversation with Pete from Copestone - observation letters for foundation - foundation insulation - bond beam - bar joist and connections - structural steel to follow / pending other rough inspections | BRIANB | BRIANB | | BIN | P | 6388877 |
THE COPESTONE COMPANY | BFI | P | 11/05/2019 | observed remaining horizontal 2" R10 under slab / note - observation letter from CTL for vertical 2" R10 to follow | BRIANB | BRIANB | | BFI | P | 6388869 |
THE COPESTONE COMPANY | BFI | P | 11/04/2019 | PARTIAL / observed horizontal 2" R10 under slab at suites 100 - 108 - 116 only / note - observation letter from CTL for vertical 2" R10 to follow | BRIANB | BRIANB | | BFI | P | 6386947 |
THE COPESTONE COMPANY | BIN | P | 09/17/2019 | PARTIAL / observed batt insulation at exterior wall in utility room only / pending other rough inspections | BRIANB | BRIANB | | BIN | P | 6338205 |
THE COPESTONE COMPANY | BFR | P | 09/12/2019 | PARTIAL / observed interior non-load bearing light gauge wall framing around perimeter and at utility room / observation letter for foundation - bond beam - bar joist and connections - structural steel to follow / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6333533 |
THE COPESTONE COMPANY | BLA | P | 08/12/2019 | lath at top of towers okay only | BRIANB | BRIANB | | BLA | P | 6296611 |
THE COPESTONE COMPANY | BLA | R | 08/09/2019 | LATH -- not ready at towers | SCOTTS | SCOTTS | | BLA | R | 6295414 |
THE COPESTONE COMPANY | BLA | P | 08/08/2019 | PARTIAL / cornice okay only / discussed needing observation letters to complete foundation - bond beam - structural steel inspections with site superintendent Pete | BRIANB | BRIANB | | BLA | P | 6293812 |
THE COPESTONE COMPANY | BFR | P | 07/30/2019 | partial inspection for tower light gauge steel at wall and roof/framing per plan both towers | SCOTTS | SCOTTS | | BFR | P | 6282080 |
THE COPESTONE COMPANY | BSP | P | 07/30/2019 | reinforcing at step downs on floor is per foundation design | SCOTTS | SCOTTS | | BSP | P | 6282075 |
THE COPESTONE COMPANY | BSP | P | 05/28/2019 | structural welding inspection requested / per conservation with site superintendent Chris - observation letter from engineer for structural welding to follow | BRIANB | BRIANB | | BSP | P | 6212136 |
THE COPESTONE COMPANY | BBB | P | 04/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / courtesy visit - met with Copestone superintendent Chris and went over approved design and inspection scheduling / observation letter from CTL to follow | BRIANB | BRIANB | | BBB | P | 6164462 |
THE COPESTONE COMPANY | BFI | P | 04/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from CTL to follow | BRIANB | BRIANB | | BFI | P | 6164449 |
THE COPESTONE COMPANY | BFN | P | 04/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from CTL to follow | BRIANB | BRIANB | | BFN | P | 6164448 |
THE COPESTONE COMPANY | BFT | P | 04/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / courtesy visit - met with Copestone superintendent Chris and went over approved design and inspection scheduling / observation letter from CTL to follow | BRIANB | BRIANB | | BFT | P | 6164442 |
DILLER ELECTRIC LLC | E= | C | 03/16/2020 | Corrected breakers for series ratings splice uploaded / | ROB | ROB | | E= | C | 6511251 |
DILLER ELECTRIC LLC | E= | P | 02/28/2020 | Latest splice not scanned yet / | ROB | ROB | | E= | P | 6495510 |
DILLER ELECTRIC LLC | E= | R | 01/31/2020 | Breakers identified on Series Rating schedule are Cutler Hammer and Panels are Sq. D / | ROB | ROB | | E= | R | 6470925 |
DILLER ELECTRIC LLC | E= | P | 12/20/2019 | Series Rating Tested Combination Schedule needs to show the equipment used / Need to frame access for ufer ground / | ROB | ROB | | E= | P | 6434339 |
DILLER ELECTRIC LLC | E= | P | 12/18/2019 | Need series rated label and circuit #'s on RTU disconnects / | ROB | ROB | | E= | P | 6430816 |
DILLER ELECTRIC LLC | ES | P | 11/13/2019 | Commercial Service: Ok to set meters for Suite 108 400 amp / Suites 100, 116, 124, 132, 140, 148, 156, 164, 172, 180 all 200 amp / ----------------------------------NOTE: Panel A needs 42k breakers not Panel G /--------- | ROB | ROB | | ES | P | 6397811 |
DILLER ELECTRIC LLC | E= | C | 09/27/2019 | FIRE ALARM INSPECTION: FA ok / Inspected on 9.26.2019 / | ROB | ROB | | E= | C | 6349902 |
DILLER ELECTRIC LLC | E= | C | 09/27/2019 | FIRE ALARM INSPECTION: Complete inspection on 9.26.2017 / | ROB | ROB | | E= | C | 6349883 |
DILLER ELECTRIC LLC | ER | C | 09/27/2019 | FIRE ALARM INSPECTION: Complete inspection on 9.26.2017 / | ROB | ROB | | ER | C | 6349882 |
DILLER ELECTRIC LLC | ES | P | 09/26/2019 | Commercial Service: 2500 amp 4 wire--Ok to energize and set House Meter / ---------------------/ Need ufer access framed and installed / Need water pipe clamp and bonding around manifold /Panel G needs 42k branch breakers / Need to install fault current and series labeling / | ROB | ROB | | ES | P | 6348986 |
DILLER ELECTRIC LLC | ES | R | 09/25/2019 | Need brass tags on meters / Need access framed for ufer ground / Need water pipe and steel gec's / Replace damaged PVC ror CT meter and install bushings at each end / Both grounds need to terminate at same ground bar in Panel H / Panel G need 42k branch breakers / NOTE: Will need fault current and series rating labeling by final / | ROB | ROB | | ES | R | 6347402 |
DILLER ELECTRIC LLC | ER | P | 09/11/2019 | Rough ok for exterior wall signs and lighting and mech room/ | ROB | ROB | | ER | P | 6331479 |
DILLER ELECTRIC LLC | EUG | P | 07/16/2019 | EUG ok on backside of building, from NW corner to next pole going east / Ok between poles on west side of parking lot / Completes polelights and sign / | ROB | ROB | | EUG | P | 6264827 |
DILLER ELECTRIC LLC | EUG | P | 07/15/2019 | PVC on west end between 2 pole lights doesn't appear to be deep enough / PVC between 2 islands ok / | ROB | ROB | | EUG | P | 6263470 |
DILLER ELECTRIC LLC | EUG | P | 07/11/2019 | EUG ok for south pole light to center island pole light / connecting pipe between 2 east islands / west pole light to northeast pole light / Sign to building stub out / | ROB | ROB | | EUG | P | 6260271 |
DILLER ELECTRIC LLC | EUG | P | 07/03/2019 | EUG ok for pole lights / From north side of building to east pole to center pole / | ROB | ROB | | EUG | P | 6252706 |
DILLER ELECTRIC LLC | EUG | P | 06/21/2019 | partial trenches between light poles south side of building | CRAIGS | CRAIGS | | EUG | P | 6239474 |
DILLER ELECTRIC LLC | ESL | C | 05/15/2019 | PVC conduit in slab okay | CHIPO | CHIPO | | ESL | C | 6200622 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 12/06/2019 | 2 PSI LETTER FROM CSU ON FILE, REGULATORS AND LABELS COMPLETE | MARKB | MARKB | | H= | C | 6419787 |
FRONTIER MECHANICAL SYSTEMS INC | H= | L | 11/25/2019 | No access provided to roof. Need 2psi approval from CSU. Need medium pressure stickers at meter stubs and inspection on roof. | MARKB | MARKB | | H= | L | 6410299 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 11/13/2019 | Roof ladder complete | MARKB | MARKB | | H= | C | 6398383 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 10/17/2019 | FINAL PENDING - Install roof ladder | MARKB | MARKB | | HSP | P | 6371396 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 10/16/2019 | CHANGE OF EQUIPMENT RECEIVED FROM ENGINEER - SEE IMAGES | MARKB | MARKB | | HSP | P | 6369699 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | R | 10/15/2019 | RTU'S installed are not what plan calls for. Need units labeled. Need permanent building roof ladder installed. | MARKB | MARKB | | H= | R | 6369482 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | L | 10/09/2019 | 30 min call ahead sent. Riser room locked and no access to roof. | MARKB | MARKB | | H= | L | 6363784 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 08/01/2019 | OK TO RELEASE 11 - 2PSI METERS | MARKB | MARKB | | HC | C | 6285823 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 08/01/2019 | 10 PSI PRESSURE TEST ON ALL 11 LINES OK AND PIPING PER PLAN. FOR FINAL - Need 2 psi approval letter from CSU, Label all stubs with unit numbers, final connections on roof with regulators and medium pressure labels. | MARKB | MARKB | | HI | C | 6285816 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 12/11/2019 | Image of trap guard received from contractor. | DANR | DANR | | P= | C | 6423808 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 11/25/2019 | Need trap guard water entry floor drain - picture ok, rest ok. | DANR | DANR | | P= | P | 6410345 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 09/17/2019 | Ok. Note: check water entry at final. Need plans splice for moving 1" irrigation line over head. | DANR | DANR | | PTO | C | 6338012 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | C | 08/09/2019 | south side tower roof drains | TED | TED | | PRD | C | 6295099 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 08/01/2019 | north side roof drains | TED | TED | | PRD | P | 6284988 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/01/2019 | mech. room floor drain vent through roof | TED | TED | | PTO | P | 6284979 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 06/13/2019 | sanitary and grease lines run out under footer, water run in under footer, grease trap vent run up on outside wall | TED | TED | | PB | C | 6230248 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 05/03/2019 | deep sanitary and grease (2 grease systems) inside footers (not run under footer to outside at this time), water entrance room floor drain, test and design ok | TED | TED | | PB | P | 6186760 |
DILLER ELECTRIC LLC | XES | T | 02/27/2020 | PAID (REC#1664980): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised plans to indicate as-built series rated combination. | BERTHA | BERTHA | | XES | T | 6494459 |
DILLER ELECTRIC LLC | XES | T | 01/28/2020 | PAID (REC#1658642) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line | SHELBY | SHELBY | | XES | T | 6466038 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 11/22/2019 | PAID (REC#1646404) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 11/22/19: See pages L1.1 and L1.2 for plumbing scope of work, added 1" irrigation line. | SHANEN | SHANEN | | XPS | T | 6408215 |
DILLER ELECTRIC LLC | XES | T | 11/13/2019 | PAID (REC#1644264) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line to indicate available fault current. | BERTHA | BERTHA | | XES | T | 6398407 |