INTEGRITY POOL BUILDERS, LLC | B= | C | 09/23/2021 | | BERTW | BERTW | | B= | C | 7118491 |
INTEGRITY POOL BUILDERS, LLC | B= | R | 08/17/2021 | Still missing open excavation observation as noted in the soils report from June 4 2018 / Site inspection for Auto cover / enclosure emergency numbers and safety equipment ok | PAULP | PAULP | | B= | R | 7075119 |
INTEGRITY POOL BUILDERS, LLC | BSP | P | 04/27/2021 | Stamped Pool Shell detail on file | PAULP | PAULP | | BSP | P | 6947723 |
INTEGRITY POOL BUILDERS, LLC | BSP | P | 04/23/2021 | Stamped soils report on file / Still need Open Excavation Observation as mentioned in soils not to exceed 4000 psf | PAULP | PAULP | | BSP | P | 6944391 |
INTEGRITY POOL BUILDERS, LLC | BSP | R | 04/21/2021 | No soils report attached / image uploaded has no stamp and is only a request for customer signatures / this is same letter rejected from yesterday upload | PAULP | PAULP | | BSP | R | 6941095 |
INTEGRITY POOL BUILDERS, LLC | B= | R | 04/20/2021 | Soils receipt without engineer stamp on file from June 4 2018 / still need stamped open excavation observation and site inspection for safety / Schedule Final after uploads are received and accepted -- Schedule a new Building Final when above items are complete. UPDATE: 04-21-21 by Paul P-- Upon Further Review, / spoke to contractor by phone and explained Mechanical permit needs to be attached and completed/ Engineer STAMPED Open Excavation observation also needs to be uploaded before another building Final site inspection will be completed | PAULP | PAULP | | B= | R | 6939563 |
INTEGRITY POOL BUILDERS, LLC | B= | R | 04/13/2021 | Need to attach mechanical permit and complete required inspections / Missing stamped Open Excavation Observation / see notes from August 4 2020 | PAULP | PAULP | | B= | R | 6930826 |
INTEGRITY POOL BUILDERS, LLC | BE | L | 04/07/2021 | Renewed online for 1/2 Fee at 4/7/2021 2:12:29 PM (RECEIPT #: 1762824) | WEBSITE | WEBSITE | | BE | L | 6925493 |
INTEGRITY POOL BUILDERS, LLC | BFN | P | 08/04/2020 | Engineer letter for foundation on file -- Eufer noted / Still need open hole letter and mechanical attached to permit | NICHOLEM | NICHOLEM | | BFN | P | 6659818 |
INTEGRITY POOL BUILDERS, LLC | B= | R | 07/30/2020 | Need to attach mechanical permit for boiler and complete required inspections / Need soils report reference in plan, open hole, concrete and reinforcing observations / No inspection performed | NICHOLEM | NICHOLEM | | B= | R | 6655300 |
GREAT AMERICAN ELECTRIC LLC | E= | C | 07/28/2020 | corrections made / #8 equipotential bond removed from panel and exterior WP box secured / | MIGUEL | MIGUEL | | E= | C | 6652904 |
GREAT AMERICAN ELECTRIC LLC | ER | C | 07/28/2020 | encapsulation inspection done by underwater camera ok / | MIGUEL | MIGUEL | | ER | C | 6652903 |
GREAT AMERICAN ELECTRIC LLC | ER | R | 07/23/2020 | encapsulation inspection missed, may need to drain pool / niche box ok / bonding to pool cover / | MIGUEL | MIGUEL | | ER | R | 6647342 |
GREAT AMERICAN ELECTRIC LLC | E= | R | 07/23/2020 | remove #8 equipotential bond wire from heater to pool panel / secure GFCI outside of pool room / encapsulation inspection missed, may need to drain pool / GFCI protection provided to equipment / | MIGUEL | MIGUEL | | E= | R | 6647341 |
GREAT AMERICAN ELECTRIC LLC | EE | L | 07/20/2020 | Renewed for $88.00 at 7/20/2020 10:41:05 AM (Receipt#1697168) | RITA | RITA | | EE | L | 6642544 |
GREAT AMERICAN ELECTRIC LLC | ER | P | 05/30/2019 | deck bonding ok/ still need to bond equipment and cover / still need encapsulation inspection for wet niche / | MIGUEL | MIGUEL | | ER | P | 6214758 |
GREAT AMERICAN ELECTRIC LLC | ESL | P | 03/20/2019 | #8 CU to equipment room, light shell, 4 corners , 2 cover locations / | MIGUEL | MIGUEL | | ESL | P | 6138097 |
GREAT AMERICAN ELECTRIC LLC | EUG | C | 03/20/2019 | 2-1" PVC and 1-#8 CU from equipment room to pool re-bar, light, cover motor location / | MIGUEL | MIGUEL | | EUG | C | 6138085 |
DUCT BROTHERS INC | H= | C | 08/09/2021 | CORRECTION MADE / SEE IMAGES | MICHAELM | MICHAELM | | H= | C | 7064302 |
DUCT BROTHERS INC | H= | P | 08/05/2021 | PROPERLY TERMINATE BOILER INTAKE VENT AS PER INSTALLATION MANUAL / OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / Inspection for previous install / NOTE: DIRECT VENT BOILER FOR POOL | MICHAELM | MICHAELM | | H= | P | 7061825 |