MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 06/11/2019 | final OK pending other finals | DANE | DANE | | B= | C | 6227027 | MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 04/15/2019 | observed light gauge stl wall framing and hard lid framing in restroom / reviewed accessible elements with site superintendent Dewey / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6166457 | EL PASO ELECTRIC, LLC. | E= | C | 06/10/2019 | E= OK ---- | GREGM | GREGM | | E= | C | 6225423 | EL PASO ELECTRIC, LLC. | E= | R | 06/06/2019 | need gfci breaker for washer-----gfci above water heater is not readily accessible | RANDY | RANDY | | E= | R | 6222765 | EL PASO ELECTRIC, LLC. | ER | C | 06/06/2019 | ceilings ok | RANDY | RANDY | | ER | C | 6222754 | BJ COMPANY, LLC | E= | C | 06/05/2019 | FIRE ALARM INSPECTION: fire alarm rough ok per Randy; contractor does not need card signed | MATTHEW | MATTHEW | | E= | C | 6220532 | EL PASO ELECTRIC, LLC. | ER | P | 05/17/2019 | interior walls were put on wrong permit-----walls ok | RANDY | RANDY | | ER | P | 6203606 | EL PASO ELECTRIC, LLC. | EP | R | 05/17/2019 | panels not ready | RANDY | RANDY | | EP | R | 6203582 | EL PASO ELECTRIC, LLC. | ER | P | 05/13/2019 | bathroom hard lids | RANDY | RANDY | | ER | P | 6197475 | BJ COMPANY, LLC | ER | P | 05/10/2019 | FIRE ALARM INSPECTION: FA rough ok-----did not sign red card | RANDY | RANDY | | ER | P | 6196207 | EL PASO ELECTRIC, LLC. | ER | P | 04/08/2019 | wall rough in--okay to rock walls except at panel | CHIPO | CHIPO | | ER | P | 6158664 | HVAC SOLUTIONS, INC. | H= | C | 05/31/2019 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 6216080 | HVAC SOLUTIONS, INC. | H= | P | 05/31/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. CORRECTION TO ELBOW MADE, SEE IMAGES. | NANCY | NANCY | | H= | P | 6215788 | HVAC SOLUTIONS, INC. | H= | P | 05/20/2019 | 30 GAUGE ELBOW INSTALLED FOR EXHAUST IN ROOM 208 / CHANGE OUT ELBOW TO 26 GAUGE. MISSING RELOCATED THERMOSTATS FOR VAV - 208, 209, 210, 214. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6204979 | HVAC SOLUTIONS, INC. | HD | P | 04/25/2019 | NEED TO COMPLETE DRYER EXHAUST DUCT AND TERMINATION AND EF-1 EXHAUST DUCT AND TERMINATION. ABOVE CEILING SUPPLY DUCT ROUGH AND FLEX CONNECTIONS TO GRILLS AND REGISTERS OK / OK TO WRAP. RETURN AIR LAY-IN GRILLS IN PLACE. NEED TEST AND BALANCE REPORT BY FINAL / ALL RELOCATED THERMOSTATS NEED TO BE 48" TO THE TOP OFF FINISHED FLOOR. | LIDO | LIDO | | HD | P | 6178361 | EL PASO PLUMBING, INC. | P= | C | 06/07/2019 | remodel | TED | TED | | P= | C | 6224128 | EL PASO PLUMBING, INC. | PB | C | 05/14/2019 | suite 230 drain through floor into ceiling of unit below, test and design ok | TED | TED | | PB | C | 6199289 | EL PASO PLUMBING, INC. | PB | T | 05/10/2019 | PAID (REC#1597543) AFTER-HOURS INSPECTION: $200 From: SCANNING Okay Per Joel for after hours inspeection scheduled w/ Scott | SCANNING | SCANNING | | PB | T | 6195372 | EL PASO PLUMBING, INC. | PB | R | 05/01/2019 | need access to under floor drain lines for inspection | TED | TED | | PB | R | 6183877 | EL PASO PLUMBING, INC. | PTO+ | P | 04/17/2019 | in walls and ceiling water piping insulation ok | TED | TED | | PTO+ | P | 6168239 | EL PASO PLUMBING, INC. | PTO | P | 04/15/2019 | dwv in walls and ceiling ok, water piping in walls and ceiling ok, still need to insulate water lines | TED | TED | | PTO | P | 6166050 | EL PASO PLUMBING, INC. | XPS | T | 05/09/2019 | PAID (REC#1597222): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 5/9/19: Delta 3 revisions re-route 2" drain to S-2 in room 203 & added 2" drain per drawing note 3. | SHANEN | SHANEN | | XPS | T | 6194040 | HVAC SOLUTIONS, INC. | XMS | T | 04/15/2019 | PAID (REC#1593116): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: DELTA 2 ADDED DRYER VENT | DALEH | DALEH | | XMS | T | 6165718 | HVAC SOLUTIONS, INC. | XMS | P | 04/10/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised to have ventless dryer | JUSTINC | JUSTINC | | XMS | P | 6162054 |
|
|