NUNN CONSTRUCTION, INC. | B= | C | 10/13/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6366525 |
NUNN CONSTRUCTION, INC. | B= | P | 08/14/2019 | state plumbing certificate of completion on file. / final OK pending other finals Additional Inspections Required (computer generated): VISION AIR HVAC, INC. DBA VISION MECHANI Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6299770 |
NUNN CONSTRUCTION, INC. | B= | P | 08/13/2019 | final OK pending receipt of state certificate of plumbing completion / still need state plumbing certificate of completion - final inspection certificate of partial completion status received / state electrical final completion certificate received / stamped letter of compliance for CMU bond beams or lintels above doors at restrooms and storage rooms received / all other items from previous inspection corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): VISION AIR HVAC, INC. DBA VISION MECHANI Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6299069 |
NUNN CONSTRUCTION, INC. | B= | R | 08/08/2019 | need certificates of completion for state electrical and plumbing inspections / need to complete all other finals / family restroom - sink is above 34" to the rim and rear grab bar is too far out of the corner - must extend minimum 12" toward the corner and minimum 24" to the open side from the center line of the toilet / women's restroom - need to install main door handle and rear grab bar is in wrong position / men's restroom - missing all grab bars in ambulatory stall that is by the door and need coat hook no higher than 48" in ambulatory stall and need to install door handle at main door. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), VISION AIR HVAC, INC. DBA VISION MECHANI Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6293406 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/29/2019 | framing at hard lids ceilings at new restrooms and storage rooms at common area by stairs OK pending other roughs / discussed accessible elements / discussed state electrical and plumbing inspections | DANE | DANE | | BFR | P | 6279938 |
NUNN CONSTRUCTION, INC. | BFR | P | 06/25/2019 | Grid X hard lid ceiling at area 2 / need stamped detail changing soffit front wall from 6" steel framing to 3 5/8" studs and Grid X going to the 3 5/8" vertical studs with no horizontal studs / Grid X ceiling framing OK pending other roughs and receipt of new detail / need to attach mechanical permit and have inspections | DANE | DANE | | BFR | P | 6243147 |
VISION AIR HVAC, INC. | H= | C | 10/13/2019 | RECEIVED STAMPED ENGINEER LETTER APPROVING THE TEST AND BALANCE REPORT READINGS ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6366524 |
VISION AIR HVAC, INC. | H= | P | 10/10/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 6364249 |
VISION AIR HVAC, INC. | H= | P | 08/20/2019 | TEST AND BALANCE REPORT REVIEW: VAV 6.2 ALL SUPPLY REGISTER READINGS ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. MISSING CF-1 ,CF-2, CF-3 READINGS. NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS . | LIDO | LIDO | | H= | P | 6306597 |
VISION AIR HVAC, INC. | H= | R | 08/14/2019 | DOCUMENT ATTACHED TO THE INSPECTION REQUEST IS NOT THE TEST AND BALANCE REPORT. PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | R | 6299519 |
VISION AIR HVAC, INC. | H= | P | 08/07/2019 | PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6292451 |
VISION AIR HVAC, INC. | HWP | C | 08/07/2019 | TWO 50 lb TESTS OK FOR HEAT WATER SUPPLY AND RETURN TO RP-1,2,3,4 / RP-1,2,3,4 INSTALL OK. | LIDO | LIDO | | HWP | C | 6292448 |
VISION AIR HVAC, INC. | HD | P | 07/19/2019 | NEED REVISED / APPROVED SPLICE FOR 6- RELOCATED 12" SUPPLY RUNS IN COMMON AREA BETWEEN COUNSELING AND STUDENT STORE. COMMON AREA : 3- CF-2 CIRCULATING FANS OK. PLAN PAGE M1.2 : NEED HEAT WATER SUPPLY AND RETURN PIPING FOR RADIANT INSTALLED AND PUT ON TEST AT 1.5 TIMES THE OPERATING PRESSURE FOR INSPECTION. NEED REVISED AND APPROVED SPLICE FOR TRANSFER AIR CHANGES . ALL EXHAUST DUCT ROUGH OK . | LIDO | LIDO | | HD | P | 6270717 |
VISION AIR HVAC, INC. | XMS | T | 08/01/2019 | PAID (REC#1619526) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice showing existing ducts above ceiling | TCRIPPEN | TCRIPPEN | | XMS | T | 6284926 |
NUNN CONSTRUCTION, INC. | XBS | T | 07/24/2019 | PAID (REC#1617457) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised ceiling details | SHELLEY | SHELLEY | | XBS | T | 6275069 |
NUNN CONSTRUCTION, INC. | XBS | T | 07/01/2019 | PAID (REC#1610776) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise toilet room construction | MICHAELA | MICHAELA | | XBS | T | 6250147 |