BCI NATIONAL, INC | B= | C | 10/11/2019 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6366416 |
BCI NATIONAL, INC | B= | P | 10/08/2019 | pending other final inspections / foundation inspections complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BRIANB | BRIANB | | B= | P | 6361070 |
BCI NATIONAL, INC | BFN | C | 10/08/2019 | foundation wall observation letter on file | BRIANB | BRIANB | | BFN | C | 6361068 |
BCI NATIONAL, INC | BFT | C | 10/08/2019 | footing observation letter on file | BRIANB | BRIANB | | BFT | C | 6361067 |
BCI NATIONAL, INC | B= | P | 09/25/2019 | Temp CO: all finals are complete or partialed ( Expires: 10/25/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6348072 |
BCI NATIONAL, INC | B= | P | 09/19/2019 | pending observation letters to complete foundation inspections / no return trip required / also pending other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CARRICK PLUMBING Mechanical Final Inspection is not Completed yet, COOLING CUBED, LLC. Mechanical Final Inspection is not Completed yet, MAGNUM EDGE,INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6341045 |
BCI NATIONAL, INC | BFR | P | 09/12/2019 | received engineering letter for framing modifications onsite / still need to complete foundation inspections / pending other inspections | BRIANB | BRIANB | | BFR | P | 6333294 |
BCI NATIONAL, INC | BFT | P | 09/12/2019 | received open excavation letter onsite / pending copy of footing - foundation wall observation letters | BRIANB | BRIANB | | BFT | P | 6333289 |
BCI NATIONAL, INC | BFR | R | 09/09/2019 | engineering letter for framing modifications missing permitted address / still need to pick up engineering letter for framing modifications | BRIANB | BRIANB | | BFR | R | 6328757 |
BCI NATIONAL, INC | BIN | P | 09/09/2019 | verified 2" Polyiso insulation board at section above roof deck | BRIANB | BRIANB | | BIN | P | 6328746 |
BCI NATIONAL, INC | BSP | R | 08/12/2019 | inspection for above deck roof insulation / insulation covered prior to inspection - unable to verify min. R10 insulation above roof deck | BRIANB | BRIANB | | BSP | R | 6296792 |
BCI NATIONAL, INC | BFR | P | 08/12/2019 | observed hard lid framing over restroom / pending other rough inspections / discussed needing to complete frame inspection - need stamped engineering letter addressing frame corrections and missing observation and open excavation letters to complete foundation inspections with the site superintendent / went over accessible elements with the site superintendent Allen | BRIANB | BRIANB | | BFR | P | 6296787 |
BCI NATIONAL, INC | BIN | R | 07/17/2019 | still need to complete frame inspection - need stamped engineering letter addressing frame corrections and frame items re-inspected / observed R19 batt insulation at exterior walls and R38 batt insulation at ceiling / still need to verify R10 above roof deck / also discussed missing observation and open excavation letters to complete foundation inspections with the site superintendent | BRIANB | BRIANB | | BIN | R | 6266576 |
BCI NATIONAL, INC | BIN | L | 07/16/2019 | gate to site locked - site superintendent unavailable / unable to gain access to perform inspection / no call ahead number provided | BRIANB | BRIANB | | BIN | L | 6265460 |
BCI NATIONAL, INC | BFR | P | 07/03/2019 | contractor to provide letter next inspection for joists/joist connection/header previously called out -- anchor bolts corrected -- missing 2 H2.5 above bathroom wall per letter viewed in email -- still need 3rd party engineering | SCOTTS | SCOTTS | | BFR | P | 6252806 |
BCI NATIONAL, INC | BFR | R | 06/27/2019 | items from previous frame inspection are incomplete / went over notes from previous frame inspection with the site superintendent / need complete re-inspection | BRIANB | BRIANB | | BFR | R | 6246805 |
BCI NATIONAL, INC | BLA | R | 05/31/2019 | incorrect inspection requested and cancelled onsite / no inspection performed | BRIANB | BRIANB | | BLA | R | 6216288 |
BCI NATIONAL, INC | BFR | R | 05/29/2019 | missing mechanical connection at all BCI roof joist - need clarification for no detail found on approved design / anchor bolts incomplete at sill plate / top flange of BCI roof joist drilled over cooler area / BCI 60 2.0 roof joist installed where the approved design requires TJI360 / TJI210 - drive up / missing solid blocking under parapet walls / need clarification for triple 2x12 header installed at the exterior wall opening along south elevation at the drive location not found on the approved design / observed drive up canopy post - post to beam connections / need to complete other rough inspections - including foundation inspections / reviewed accessible elements with site rep | BRIANB | BRIANB | | BFR | R | 6212988 |
BCI NATIONAL, INC | BFR | R | 05/15/2019 | PARTIAL / PARAPET - RAISED ROOF AREA / missing ledger loks at raised roof area / parapet wall framing okay | BRIANB | BRIANB | | BFR | R | 6200674 |
BCI NATIONAL, INC | BFI | P | 04/24/2019 | observed 2" rigid foam at foundation walls / reviewed inspection processes and scheduling with the site superintendent | BRIANB | BRIANB | | BFI | P | 6177130 |
BCI NATIONAL, INC | BFN | P | 04/24/2019 | observation letter from Vivid for foundation wall to follow | BRIANB | BRIANB | | BFN | P | 6177057 |
BCI NATIONAL, INC | BFT | R | 04/16/2019 | missing stamped open excavation letter for inspection / GC has opted to use a licensed design professional to perform the footing inspection / stamped observation letter for foundation footing by Vivid to follow | BRIANB | BRIANB | | BFT | R | 6167858 |
BCI NATIONAL, INC | BFT | R | 04/15/2019 | not ready for inspection / contractor to reschedule / will need complete re-inspection | BRIANB | BRIANB | | BFT | R | 6166072 |
CASCADE ELECTRIC, LLC. | E= | C | 09/10/2019 | Electrical complete / | ROB | ROB | | E= | C | 6330293 |
CASCADE ELECTRIC, LLC. | E= | P | 09/03/2019 | Need disconnect for cooler fans and seal the inside of raceway penetrations / High recpts on south and east walls need GFCI protection / usb recpts on south and east walls need GFCI protection / | ROB | ROB | | E= | P | 6322285 |
CASCADE ELECTRIC, LLC. | ER | P | 08/22/2019 | Rough ok for grid ceiling / | ROB | ROB | | ER | P | 6310900 |
CASCADE ELECTRIC, LLC. | ER | L | 08/21/2019 | Notified by Cascade before going to site / | ROB | ROB | | ER | L | 6309156 |
CASCADE ELECTRIC, LLC. | ES | P | 08/07/2019 | Commercial Service: 400 amp 4 wire new service / Ok to energize / | ROB | ROB | | ES | P | 6291173 |
CASCADE ELECTRIC, LLC. | ES | R | 08/05/2019 | Mark line and load on conductors in CT cabinet / 1/2" EMT sleeve on the GEC needs to be bonded at both ends or can use PVC / Bond neutral and ground bars in panel with minimum 1/0 CU / Note for final : All branch breakers need to be 22k AIC and label fault current with the date calculated on panel doors / | ROB | ROB | | ES | R | 6288266 |
CASCADE ELECTRIC, LLC. | ER | P | 06/28/2019 | Rough for walls ok / | ROB | ROB | | ER | P | 6248249 |
CASCADE ELECTRIC, LLC. | ER | R | 06/03/2019 | Still no roof / | ROB | ROB | | ER | R | 6217909 |
CASCADE ELECTRIC, LLC. | ER | R | 05/28/2019 | Needs to be dried in / | ROB | ROB | | ER | R | 6211465 |
CASCADE ELECTRIC, LLC. | EUG | P | 05/17/2019 | EUG for pole lights, menu boards, future car charger, and future 2" to SE corner / | ROB | ROB | | EUG | P | 6202767 |
CARRICK GAS PIPING | H= | C | 09/24/2019 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6345240 |
CARRICK GAS PIPING | H= | P | 09/23/2019 | PARTIAL PENDING : CONTRACTOR TO REQUEST A FINAL INSPECTION. | LIDO | LIDO | | H= | P | 6345100 |
MAGNUM EDGE,INC. | H= | C | 09/23/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) LETTER FOR WATER HEATER VENT TERMINATIONS IS NOT REQUIRED. | LIDO | LIDO | | H= | C | 6343850 |
ALNOR INC. | H= | C | 09/23/2019 | RECEIVED STAMPED ENGINEER LETTER FOR REFRIGERATION LEAK DETECTION ALARM NOT TO BE INSTALLED . ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6343782 |
MAGNUM EDGE,INC. | HSP | P | 09/20/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | HSP | P | 6342137 |
ALNOR INC. | H= | P | 09/19/2019 | LETTER ATTACHED IS NOT EXCEPTED .IF THE GAS DETECTION WITH ALARM PER PLAN PAGE M-1 AND M-2. IS NOT TO BE INSTALLED A STAMPED ENGINEER LETTER IS REQUIRED. | LIDO | LIDO | | H= | P | 6340492 |
MAGNUM EDGE,INC. | H= | P | 09/18/2019 | PARTIAL PENDING: NEED STAMPED ENGINEER LETTER FOR WATER HEATER VENT TERMINATING OUT THE SIDE OF THE BUILDING / PLAN SHOWS THIS TERMINATION OUT THE ROOF. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6339513 |
MAGNUM EDGE,INC. | HSP | P | 09/18/2019 | PERMANENT ACCESS LADDER WAS REMOVED DUE TO LADDER NOT MEETING CODE REQUIREMENTS / LADDER REMOVAL OK SINCE ROOF HEIGHT IS UNDER 16 FEET AND DOES NOT REQUIRE A PERMANENT ACCESS LADDER PER THE MECHANICAL CODE. | LIDO | LIDO | | HSP | P | 6338941 |
MAGNUM EDGE,INC. | H= | P | 09/17/2019 | INSPECTED MECHANICAL ON 9/16/19 . NEED TO RESEARCH PERMANENT LADDER BEING REMOVED PARTIAL PENDING : NEED TO SEAL WATER HEATER INTAKE AND VENT PENETRATION THROUGH EXTERIOR WALL. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6337535 |
MAGNUM EDGE,INC. | HV | P | 09/17/2019 | INSPECTED WATER HEATER VENT ON 9/16/19. NEED TO SEAL WATER HEATER INTAKE AND VENT PENETRATION THROUGH EXTERIOR WALL. | LIDO | LIDO | | HV | P | 6337529 |
ALNOR INC. | H= | P | 09/16/2019 | MISSING REFRIGERATION GAS DETECTION WITH ALARM / REFER TO PLAN PAGE M-1 AND M-2. REST OK. | LIDO | LIDO | | H= | P | 6336723 |
MAGNUM EDGE,INC. | HV | P | 09/10/2019 | NEED THE WATER HEATER INSTALLATION INSTRUCTIONS ON SITE FOR INSPECTION / CONTRACTOR TO ADD 1 MORE WATER HEATER TO THERE SCOPE OF WORK. | LIDO | LIDO | | HV | P | 6330686 |
MAGNUM EDGE,INC. | H= | P | 09/09/2019 | PARTIAL PENDING : CONTRACTOR THAT INSTALLED THE WATER HEATER VENT ATTACHED TO THE PERMIT. PERMANENT ROOF ACCESS LADDER DOES NOT MEET CODE REQUIREMENTS - REFER TO 2015 IMC SECTION 306.5 ( 3) (7) . INSTALL ECONOMIZER. TOP OF THERMOSTAT IS INSTALLED OVER 48" ABOVE FINISHED FLOOR. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6328359 |
CARRICK GAS PIPING | H= | P | 08/08/2019 | PARTIAL PENDING : CONTRACTOR THAT INSTALLED THE TWO TANK-LESS WATER HEATER VENTS WILL NEED TO ATTACH TO THE PERMIT AND CALL FOR INSPECTION. ((FINAL GAS CONNECTION TO EQUIPMENT OK.)) | LIDO | LIDO | | H= | P | 6293529 |
CARRICK GAS PIPING | HC | C | 06/28/2019 | RELEASE METER | LIDO | LIDO | | HC | C | 6248466 |
CARRICK GAS PIPING | HI | C | 06/28/2019 | CONTRACTOR INSTALLING WATER HEATER VENTS NEEDS TO ATTACH TO PERMIT OR ADD WATER HEATER VENTS TO THERE SCOPE OF WORK . 10 LB test ok / installed per plan . Need to see final connection to equipment. | LIDO | LIDO | | HI | C | 6248465 |
MAGNUM EDGE,INC. | HD | P | 05/23/2019 | THE FOLLOWING CONTRACTOR WILL NEED TO ATTACH TO PERMIT -CONTRACTOR INSTALLING WALK IN COOLER / FREEZER, CONTRACTOR INSTALLING THE TWO WATER HEATER VENTS, CONTRACTOR INSTALLING THE GAS. ABOVE CEILING SUPPLY AND RETURN DUCT ROUGH OK / OK TO WRAP. EF-1 DUCT ROUGH OK. | LIDO | LIDO | | HD | P | 6208957 |
BM PLUMBING INC | P= | C | 09/18/2019 | correction made | TED | TED | | P= | C | 6339887 |
BM PLUMBING INC | P= | P | 09/17/2019 | toilet still to far off sidewall | TED | TED | | P= | P | 6338167 |
BM PLUMBING INC | P= | P | 09/13/2019 | toilet to far off side wall, install tempering valve on hand sink, install trap guards, need ice maker water hammer, note: R.P. irrigation backflow in meter room | TED | TED | | P= | P | 6334706 |
BM PLUMBING INC | P= | L | 09/12/2019 | Field cancel. | DANR | DANR | | P= | L | 6333098 |
BM PLUMBING INC | PTO | C | 07/16/2019 | Ok. | DANR | DANR | | PTO | C | 6265079 |
BM PLUMBING INC | PTO | P | 07/12/2019 | need to insulate all hot water piping, even 1/2'' | TED | TED | | PTO | P | 6261817 |
BM PLUMBING INC | PRD | C | 07/11/2019 | ok | TED | TED | | PRD | C | 6260193 |
BM PLUMBING INC | PTO | P | 07/11/2019 | need to insulate hot water piping, rest ok | TED | TED | | PTO | P | 6260187 |
BM PLUMBING INC | PTO | L | 07/10/2019 | Field cancel not ready, will need PRD inspection for roof drains. | DANR | DANR | | PTO | L | 6258493 |
BM PLUMBING INC | PB | C | 05/06/2019 | Ok. | DANR | DANR | | PB | C | 6188109 |
BM PLUMBING INC | PB | P | 05/03/2019 | inside grease line test ok, need grease trap vents inside building installed using dwv fittings and tested | TED | TED | | PB | P | 6187163 |
BM PLUMBING INC | PB | P | 05/02/2019 | Low test Grease waste, rest ok Grease and dwv. Note: by final need engineer approval for trough drain instead of floor sink at ice maker. | DANR | DANR | | PB | P | 6185587 |
BM PLUMBING INC | PB | P | 05/01/2019 | Not ready, re-inspect all. | DANR | DANR | | PB | P | 6183872 |