GLR, INC | B= | C | 10/02/2020 | All required inspections are complete | MATTHEWM | MATTHEWM | | B= | C | 6727614 |
GLR, INC | B= | T | 08/21/2020 | PAID (REC#1716963): Temp CO: Extension Pending Engineering final / Trip fee assessed for TCO fee collection ( Expires: 9/20/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6681935 |
GLR, INC | B= | P | 07/08/2020 | Temp CO: TCO extension ( Expires: 8/7/2020 12:00:00 AM) | LONNYS | LONNYS | | B= | P | 6629943 |
GLR, INC | B= | T | 07/08/2020 | PAID (REC#1716965): trip fee assessed for TCO extension. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | LONNYS | LONNYS | | B= | T | 6629942 |
GLR, INC | B= | P | 06/09/2020 | Temp CO: pending required final inspections ( Expires: 7/9/2020 12:00:00 AM) | LONNYS | LONNYS | | B= | P | 6598329 |
GLR, INC | B= | T | 06/09/2020 | PAID (REC#1716967): trip fee assessed to extend TCO. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | LONNYS | LONNYS | | B= | T | 6598321 |
GLR, INC | B= | P | 05/04/2020 | Temp CO: TCO extension ( Expires: 6/3/2020 12:00:00 AM) | LONNYS | LONNYS | | B= | P | 6559725 |
GLR, INC | B= | T | 05/04/2020 | PAID (REC#1677914) trip fee assessed for TCO extension. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | LONNYS | LONNYS | | B= | T | 6559723 |
GLR, INC | B= | P | 03/05/2020 | Temp CO: Need Eng per MM ( Expires: 4/4/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6501106 |
GLR, INC | B= | P | 02/05/2020 | Temp CO: Need Eng. Ok per MM ( Expires: 3/6/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6474061 |
GLR, INC | B= | P | 01/06/2020 | Temp CO: Need eng. Ok per Matt ( Expires: 2/5/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6443766 |
GLR, INC | B= | P | 12/06/2019 | Temp CO: Per Matt ( Expires: 1/5/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6419107 |
GLR, INC | B= | P | 11/08/2019 | Temp CO: still pending engineering ( Expires: 12/8/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6393619 |
GLR, INC | B= | P | 10/31/2019 | . Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), SYSTEMS ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6384543 |
GLR, INC | B= | P | 10/11/2019 | Temp CO: need fire zoning eng health build ( Expires: 11/10/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6366398 |
GLR, INC | B= | P | 10/10/2019 | grab bar behind womens room toilet to be 24" from center on open side and 12" from cebter to wall side / swing bar on mens rest room to be between 39 and 41" from back wall and between 39 and 41" AFF, rest of building okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, M W MECHANICAL INC Mechanical Final Inspection is not Completed yet, SYSTEMS ELECTRIC, INC. Electrical Final Inspection is not Completed yet, THAYER HEATING AND AIR CONDITIONING Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6365002 |
GLR, INC | BSP | P | 10/09/2019 | eng letter for structural steel connections on file | BOBF | BOBF | | BSP | P | 6362728 |
SM PLUMBING & MECHANICAL, LLC | BSP | T | 10/07/2019 | PAID (REC#1635674) ADDITIONAL PLAN REVIEW TIME: $50 From: SHANEN new splice Delta 6 revisions P1 discharge downspout to grade, remove floor sink from walk-in, P2 adjust DWV diagram | SHANEN | SHANEN | | BSP | T | 6360630 |
GLR, INC | BSP | P | 09/20/2019 | above ceiling okay, reviewed accessible elements throughout | BOBF | BOBF | | BSP | P | 6342875 |
GLR, INC | BFR | P | 07/30/2019 | pending other required inspections interior wall framing and hard lids okay / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6282293 |
GLR, INC | BBB | C | 07/12/2019 | letter for bond beams on file | BOBF | BOBF | | BBB | C | 6261217 |
GLR, INC | BFR | P | 07/11/2019 | pending other required inspections, - eye brow framing on north and west sides of building okay, hat channel installation at CMU walls okay, canopy framing above entry okay , interior wall framing at Northeast corner and wall framing for offices and pharmacy at back of building okay, still need to inspect rest tooms and consult room next to drive through / need eng letter for Bond beams and all strucural steel connections and Bar joist connections | BOBF | BOBF | | BFR | P | 6260896 |
GLR, INC | BFI | C | 06/27/2019 | observation letter for foundation insulation on file | BRIANB | BRIANB | | BFI | C | 6245918 |
GLR, INC | BBB | P | 05/31/2019 | Okay to use 3rd party engineer for Bond beam inspections | BOBF | BOBF | | BBB | P | 6215659 |
GLR, INC | BFN | C | 05/28/2019 | Engineer letter for foundation on file -- Eufer noted / | BOBF | BOBF | | BFN | C | 6211151 |
GLR, INC | BFT | C | 05/28/2019 | open hole on file, 2000# , bearing pressure verified | BOBF | BOBF | | BFT | C | 6211148 |
GLR, INC | BFT | P | 05/21/2019 | Engineer letter for footing and foundation on file, eufer noted / still need stamped open hole | BOBF | BOBF | | BFT | P | 6205522 |
GLR, INC | BFT | R | 05/03/2019 | letter uploaded did not have eng stamp, will stamped letter for footing | BOBF | BOBF | | BFT | R | 6186082 |
GLR, INC | BFN | P | 05/02/2019 | AUTHORIZED INSPECTION BY ENGINEER / spoke with site superintendent Curt - will be using RMG to perform inspection / stamped observation letter to follow | BRIANB | BRIANB | | BFN | P | 6185511 |
GLR, INC | BFT | P | 04/25/2019 | AUTHORIZED INSPECTION BY ENGINEER / spoke with site superintendent Curt - will be using RMG to perform inspection / stamped observation letter to follow | BRIANB | BRIANB | | BFT | P | 6177561 |
SYSTEMS ELECTRIC, INC. | E= | C | 11/04/2019 | New store complete | CHIPO | CHIPO | | E= | C | 6387001 |
SYSTEMS ELECTRIC, INC. | E= | P | 10/04/2019 | Items still need to be inspected to complete final are as follows: Check for GFCI protection of break room receps, trash compactor, one light pole near west parking lot entry, all signs, and plug n play exterior soffit lights-----all else okay | CHIPO | CHIPO | | E= | P | 6357796 |
SECURITY TECHNOLOGY SERVICES LLC | E= | C | 10/04/2019 | FIRE ALARM INSPECTION: Fire Alarm complete | CHIPO | CHIPO | | E= | C | 6357786 |
SECURITY TECHNOLOGY SERVICES LLC | ER | C | 09/27/2019 | FIRE ALARM INSPECTION: Fire alarm rough in complete | CHIPO | CHIPO | | ER | C | 6350278 |
SYSTEMS ELECTRIC, INC. | ER | C | 09/20/2019 | Above ceilings complete / rough in complete | CHIPO | CHIPO | | ER | C | 6342259 |
SYSTEMS ELECTRIC, INC. | EUG | C | 09/12/2019 | Grounding of light pole bases complete | CHIPO | CHIPO | | EUG | C | 6332693 |
SYSTEMS ELECTRIC, INC. | ES | C | 09/09/2019 | Commercial Service: 600 Amp 4 wire commercial service--okay to set meter | CHIPO | CHIPO | | ES | C | 6328196 |
SYSTEMS ELECTRIC, INC. | ES | P | 08/15/2019 | Commercial Service: Ground rod inspection for concrete pour okay---no action needed by utility | CHIPO | CHIPO | | ES | P | 6301729 |
SYSTEMS ELECTRIC, INC. | ER | P | 08/08/2019 | hall hard lid , bath and office hard lids --ok / outside soffit's ok | BRIAN | BRIAN | | ER | P | 6293392 |
SYSTEMS ELECTRIC, INC. | ER | P | 07/22/2019 | vestibule walls OK | CRAIGS | CRAIGS | | ER | P | 6271590 |
SYSTEMS ELECTRIC, INC. | ER | P | 07/18/2019 | walls in the back of the store and mezz walls , high lighted on the plans----- irr uffer clamp | CRAIGS | CRAIGS | | ER | P | 6268058 |
SYSTEMS ELECTRIC, INC. | ER | P | 07/11/2019 | walls only, MARKED/DATED on EC's prints | GARYL | GARYL | | ER | P | 6259847 |
SYSTEMS ELECTRIC, INC. | EUG | P | 06/25/2019 | Trenches from light pole to light pole complete | CHIPO | CHIPO | | EUG | P | 6242650 |
SYSTEMS ELECTRIC, INC. | EUG | P | 06/04/2019 | only underground left to inspect is cut between light poles 2 and 3----all else okay | CHIPO | CHIPO | | EUG | P | 6219474 |
SYSTEMS ELECTRIC, INC. | EUG | P | 05/30/2019 | Trenches for north side light poles okay | CHIPO | CHIPO | | EUG | P | 6214496 |
SYSTEMS ELECTRIC, INC. | ESL | C | 05/17/2019 | pvc only----note copper water line | BRIAN | BRIAN | | ESL | C | 6203137 |
THAYER HEATING AND AIR CONDITIONING | H= | C | 10/18/2019 | OK | JERRYF | JERRYF | | H= | C | 6372843 |
M W MECHANICAL INC | H= | C | 10/17/2019 | THIS CONTRACTORS SCOPE IS COVERED UNDER THAYER HEATING | MARKB | MARKB | | H= | C | 6372583 |
M W MECHANICAL INC | H= | P | 10/08/2019 | THAYER HEATING IS FINISHING WORK SCOPE FOR MW. CAN FINAL ONCE THAYER HEATING CLAIMS FULL WORK SCOPE ON PERMIT. | MARKB | MARKB | | H= | P | 6362059 |
I.C.E. HEATING & COOLING | H= | C | 10/08/2019 | All final connections complete. | MARKB | MARKB | | H= | C | 6362052 |
I.C.E. HEATING & COOLING | HC | C | 10/08/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6362046 |
I.C.E. HEATING & COOLING | HI | C | 10/08/2019 | Gas piping matches new gas splice. | MARKB | MARKB | | HI | C | 6362045 |
THAYER HEATING AND AIR CONDITIONING | H= | P | 10/08/2019 | FOR FINAL - Correct permit scope by adding: 1 condensing unit, 4 rtu's, 1 unit heater & 1 vent. Complete condensate line for mini-split in office. Install remote indicator for smoke duct detectors and provide a test and balance report for review. | MARKB | MARKB | | H= | P | 6362042 |
THAYER HEATING AND AIR CONDITIONING | HRP | C | 10/08/2019 | MINI-SPLIT HEAD, LINESET & CONDENSER COMPLETE - NO CONCEALED FITTINGS. | MARKB | MARKB | | HRP | C | 6362033 |
THAYER HEATING AND AIR CONDITIONING | HV | C | 10/08/2019 | UNIT HEATER VENT COMPLETE. | MARKB | MARKB | | HV | C | 6362028 |
THAYER HEATING AND AIR CONDITIONING | HD | C | 10/08/2019 | THAYER HEATING WILL BE PICKING UP AND FINISHING SCOPE FOR MW MECHANICAL. ABOVE CEILING DUCT - RTU-3 SUPPLY/RETURN MAINS/BRANCHES/FLEX/ DIFFUSERS COMPLETE. FLEX & DIFFUSERS COMPLETE FOR RTU'S 1, 2 &4. ALL TRANSFER DUCTS COMPLETE. SMOKE DUCT DETECTORS INSTALLED UNITS. | MARKB | MARKB | | HD | C | 6362026 |
COLORADO COMMERCIAL REFRIGERATION, INC | H= | C | 10/07/2019 | | MARKB | MARKB | | H= | C | 6359899 |
COLORADO COMMERCIAL REFRIGERATION, INC | HRP | C | 10/01/2019 | FOR FINAL - Can final once requested by contractor. WALK IN COOLER - 375 PSI PRESSURE TEST, INSULATION, CONDENSER, SUPPORT AND CONDENSATE LINES COMPLETE - No alarm required for reach in. SELF CONTAINED UNITS HAVE EVAP. PANS | MARKB | MARKB | | HRP | C | 6353663 |
I.C.E. HEATING & COOLING | HI | P | 09/27/2019 | Gas piping to unit heater does not tee off main 21/2 line as plans call for. Rest OK. Unit heater line is not concealed over any hard lids. 10 PSI PRESSURE TEST OK but may require a new test once correction is made. | MARKB | MARKB | | HI | P | 6350566 |
M W MECHANICAL INC | HD | P | 08/19/2019 | ABOVE CEILING DUCT - SUPPLY/RETURN, DROPS/MAINS/BRANCHES FOR RTU-1, 2, &4 INSTALLED PER PLAN OK TO WRAP. No flex, diffusers or exaust | MARKB | MARKB | | HD | P | 6305631 |
M W MECHANICAL INC | HSP | P | 07/30/2019 | NOTE TO GAS CONTRACTOR NEED PERMIT PRIOR TO STARTING WORK AND APPEARS GAS LINE WILL RUN OVER HARD LID AREA AT BATH ROOMS FOR UNIT HEATER AT LOADING DOCK. CALL INSPECTION BEFORE COVER | JON | JON | | HSP | P | 6282580 |
M W MECHANICAL INC | HD | P | 07/30/2019 | EF-1 AND EF-2 FANS AND DUCTS OK OK ABOVE HARD LIDS. 1- HEAT RUN IN BREAK ROOM AND 1 HEAT RUN EACH IN THE 2 BATH ROOMS, AND 1 RETURN ABOVE HARD LID. THIS INCLUDES THE RISERS SUPPLY AND RETURN THAT DROP DOWN FROM RTU TO UNDER MEZZANINE. STILL NEED EXHAUST DUCT RISERS UP THROUGH ROOF INSPECTED WHEN READY | JON | JON | | HD | P | 6282564 |
SM PLUMBING & MECHANICAL, LLC | P= | C | 10/08/2019 | Correction made. | DANR | DANR | | P= | C | 6360964 |
SM PLUMBING & MECHANICAL, LLC | PTO | C | 10/08/2019 | Correction made. | DANR | DANR | | PTO | C | 6360962 |
SM PLUMBING & MECHANICAL, LLC | PRD | C | 10/08/2019 | Correction made. | DANR | DANR | | PRD | C | 6360960 |
SM PLUMBING & MECHANICAL, LLC | P= | P | 09/27/2019 | Need plan splice for roof drain changes at canopy's - noted PRD inspection 9/24/2019 and 9/9/2019, need plan splice on removal of floor sink column 2E noted PTO 7/31/2019, Can complete PTO and PRD when splices are in, rest ok. | DANR | DANR | | P= | P | 6350288 |
SM PLUMBING & MECHANICAL, LLC | P= | P | 09/26/2019 | S-4 sink no hot water, leak main water heater unions, need domestic hot insulation exposed at water heater and employee area, missing trap guards floor drains, need plan splice for roof drain change pharmacy canopy - noted PRD inspection 9/24/2019. need plan splice on removal of floor sink column 2E noted PTO 7/31/2019, Can complete PTO and PRD when splices are in, rest ok. | DANR | DANR | | P= | P | 6348792 |
SM PLUMBING & MECHANICAL, LLC | P= | P | 09/24/2019 | No hot water, re-inspect all. | DANR | DANR | | P= | P | 6345482 |
SM PLUMBING & MECHANICAL, LLC | PRD | P | 09/11/2019 | Need plan splice showing piping changes at pharmacy canopy, rest of corrections ok. | DANR | DANR | | PRD | P | 6331043 |
SM PLUMBING & MECHANICAL, LLC | PRD | P | 08/09/2019 | need plan splice to show changes at canopy in front eliminating one rd and overflow for top, and at pharmacy eliminating 1 rd and over flow, need plan splice to show roof drains from main building and how they are discharging out of building, need to check support at next inspection, drains were on test | JOSEPHD | JOSEPHD | | PRD | P | 6294683 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 08/08/2019 | field canceled | JOSEPHD | JOSEPHD | | PTO | P | 6292973 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 07/31/2019 | Overhead pipe support mezzanine vent, , all hose bibs need isolation valves and installed, missing floor sink by column 2E, need all over head piping complete employee area to water entry, need all roof drain installed inspected - including underground, rest of corrections ok. Note: by final need engineer approval for trap guards, at final check water heaters - vtr's to air intakes - water entry - pharmacy water filter. | DANR | DANR | | PTO | P | 6282924 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 07/30/2019 | Isolation copper at metal studs, nail protection, overhead pipe support, leak DWV mezz level, all hose bibs need isolation valves and installed, missing capped futures dwv and domestic water, missing floor sink by column 2E, back grade on moved DWV pipe underground consultation area sink, need all over head piping complete employee area to water entry, insulation hot lines, need all roof drain installed inspected - including underground, rest ok. Note: by final need engineer approval for trap guards, at final check water heaters - vtr's to air intakes - water entry. | DANR | DANR | | PTO | P | 6281547 |
SM PLUMBING & MECHANICAL, LLC | PTO | L | 07/19/2019 | No ready field cancel. Note: need test and inspection all roof drains to include underground. (PRD), noted on PB inspection 5-16-2019. | DANR | DANR | | PTO | L | 6269508 |
SM PLUMBING & MECHANICAL, LLC | PB | P | 07/03/2019 | Received engineer letter for cellcore PVC and pipe size changes, image uploaded. | DANR | DANR | | PB | P | 6252222 |
SM PLUMBING & MECHANICAL, LLC | PB | P | 05/16/2019 | Need engineer approval letter for cellcore pvc pipe, drawing shows 3" floor sinks ran 2" (floor sink by mens restroom ok), drawing shows 4" drain line to S-1 sink columns 1-3, A-B, ran 2", need roof drain inspection (PRD), cover at own risk. | DANR | DANR | | PB | P | 6201039 |