PINE CONSTRUCTION, INC. | B= | C | 06/14/2019 | | BOBF | BOBF | | B= | C | 6232081 | PINE CONSTRUCTION, INC. | B= | P | 06/13/2019 | need accessible landing at entry / need 18" grab swing bar at existing bathroom / swing bar at new restroom to be between 39 and 41" from back wall / bottom of mirror cannot be greater than 40" above finished floor remove threshold from door leading to new rest room -- Schedule a new Building Final when above items are complete. | BOBF | BOBF | | B= | P | 6230751 | PINE CONSTRUCTION, INC. | BFR | P | 05/01/2019 | pending completion of plumb and mech roughs, frame okay / reviewed egress and door requirements / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6184504 | THE WIRE NINJA LLC | E= | C | 05/30/2019 | Phase 1 is complete. | CHIPO | CHIPO | | E= | C | 6214431 | THE WIRE NINJA LLC | ER | C | 05/01/2019 | walls and ceilings rough in okay----open ceilings everywhere except bathrooms and office | CHIPO | CHIPO | | ER | C | 6183568 | ERNST ENTERPRISES | H= | C | 06/04/2019 | ABOVE CEILING DUCT, EXHAUST, AIR HANDLERS AND CONDENSERS PER PLAN. | MARKB | MARKB | | H= | C | 6219725 | PLUMBING AND GAS, LLC | P= | C | 06/13/2019 | | SAMH | SAMH | | P= | C | 6229833 | PLUMBING AND GAS, LLC | P= | P | 06/05/2019 | Need engineer splice for changing existing water heater over mop sink to electric tankless Bosch E8 with piping design, rest ok. | DANR | DANR | | P= | P | 6221301 | PLUMBING AND GAS, LLC | P= | P | 06/03/2019 | Need engineer splice for changing existing water heater over mop sink to electric tankless Bosch E8 with piping design, need installed per Bosch manual page 6, lavatory missing tempering valve, need 1" back flow claimed and installed - drawing P1.2, rest ok. | DANR | DANR | | P= | P | 6218285 | PLUMBING AND GAS, LLC | PTO | C | 05/23/2019 | Note: at final check re-located water heater, new recirc pump above bathroom by mop sink, and water entry, need someone to claim re-located water heater by mop sink, add new 1" backflow to scope of work (drawing P1.2). | DANR | DANR | | PTO | C | 6209030 | PLUMBING AND GAS, LLC | PTO | P | 05/17/2019 | Need test new DWV to drinking fountain and lavatory, anchor toilet flange, missing hot water recirc line to lavatory (drawing P1.2), need insulation new hot and recirc lines, need someone to claim re-located water heater by mop sink, add new 1" backflow to scope of work (drawing P1.2). Note: at final check re-located water heater, new recirc pump above bathroom by mop sink, and water entry | DANR | DANR | | PTO | P | 6203234 | PINE CONSTRUCTION, INC. | XBS | P | 06/06/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Layout of restroom reversed | DANM | DANM | | XBS | P | 6222901 | PLUMBING AND GAS, LLC | XPS | T | 06/06/2019 | PAID (REC#1606106) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 6/6/19: Delta 1 revisions P0.0 revised water heater schedule for tankless, P1.0, P1.2 key note 4 | SHANEN | SHANEN | | XPS | T | 6222871 |
|
|