PATTERSON CUSTOM HOMES, INC. | B= | C | 06/20/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6237577 |
PATTERSON CUSTOM HOMES, INC. | B= | P | 06/14/2019 | Building final OK pending fire final complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NICK | NICK | | B= | P | 6231858 |
PATTERSON CUSTOM HOMES, INC. | B= | P | 06/11/2019 | Need to install lever for main office door hardware / Need to install vertical grab bar for restrooms in show room / Need to install accessible signs at latch side of doors for all restrooms / Need fire final complete / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NICK | NICK | | B= | P | 6227300 |
PATTERSON CUSTOM HOMES, INC. | BFR | C | 06/11/2019 | | NICK | NICK | | BFR | C | 6227289 |
PATTERSON CUSTOM HOMES, INC. | BFR | P | 05/10/2019 | Framing OK pending other Roughs / discussed accessible elements and egress paths | RICHB | RICHB | | BFR | P | 6194946 |
ENCORE ELECTRIC, INC. | E= | C | 05/22/2019 | | GARYL | GARYL | | E= | C | 6207672 |
ENCORE ELECTRIC, INC. | ER | P | 05/15/2019 | all grid,ok | JOHNN | JOHNN | | ER | P | 6199817 |
ENCORE ELECTRIC, INC. | ER | P | 04/23/2019 | all walls as per prints, NOTE! much wiring on ceiling tiles, will have to remove or clean up for ceiling inspection | GARYL | GARYL | | ER | P | 6175281 |
MICK HEATING & SHEET METAL CO. | H= | C | 06/05/2019 | OK | JERRYF | JERRYF | | H= | C | 6220346 |
MICK HEATING & SHEET METAL CO. | H= | P | 06/04/2019 | NEED RTU 1 THERMOSTAT TO 48" TO TOP OF THERMOSTAT OR INSTALL LOCK BOX - OK TO ATTACH PICTURES OF CORRECTIONS TO NEXT INSPECTION REQUEST NOTES: RTU 2 THERMOSTAT IS EXISTING | JERRYF | JERRYF | | H= | P | 6220061 |
MICK HEATING & SHEET METAL CO. | H= | P | 06/04/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6218725 |
MICK HEATING & SHEET METAL CO. | H= | P | 05/08/2019 | CHANGED INSPECTION TO HEAT FINAL - PARTIAL PENDING TAB REPORT AND INSPECTION OF THERMOSTATS NOTES: ALL SA / RA GRILLES ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6193213 |
MICK HEATING & SHEET METAL CO. | HD | P | 04/30/2019 | ABOVE CEILING SA / RA MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6183081 |
CHEYENNE PLUMBING & HEATING, INC. | P= | C | 05/24/2019 | | SAMH | SAMH | | P= | C | 6209974 |
CHEYENNE PLUMBING & HEATING, INC. | P= | P | 05/13/2019 | Restroom and Mop sink OK. Need to inspect coffee bar and Drinking fountain, Need plan revision or Engineers letter for 2" waste to mop sink. And delete floor sink at coffee bar. | SAMH | SAMH | | P= | P | 6196512 |
CHEYENNE PLUMBING & HEATING, INC. | PTO | C | 04/19/2019 | By final need to revise plans to show 2" waste to mop sink, and delete floor sink and show direct connection at coffee area sink. AAV at sink. | SAMH | SAMH | | PTO | C | 6171274 |
CHEYENNE PLUMBING & HEATING, INC. | PB | C | 04/19/2019 | | SAMH | SAMH | | PB | C | 6171271 |
CHEYENNE PLUMBING & HEATING, INC. | PB | P | 04/16/2019 | Underground DWV OK to mop sink and restroom. Note: Need to change mop sink waste to 2" on plans. | SAMH | SAMH | | PB | P | 6166869 |
CHEYENNE PLUMBING & HEATING, INC. | XPS | T | 05/23/2019 | PAID (REC#1600998) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: new splice adjusted schedule added mop, drinking fountain | TCRIPPEN | TCRIPPEN | | XPS | T | 6209005 |