DREAM TEAM CONSTRUCTION, INC | B= | C | 11/01/2019 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6386108 |
DREAM TEAM CONSTRUCTION, INC | B= | P | 11/01/2019 | Finished basement / No decks installed. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | ADAML | ADAML | | B= | P | 6385578 |
DREAM TEAM CONSTRUCTION, INC | BLA | C | 07/31/2019 | Items corrected | CHRISTINEH | CHRISTINEH | | BLA | C | 6282718 |
DREAM TEAM CONSTRUCTION, INC | BIN | C | 07/25/2019 | Insulation OK / NOTE: observed R-19 at all exterior walls of garage - unconditioned | JUSTINL | JUSTINL | | BIN | C | 6277369 |
DREAM TEAM CONSTRUCTION, INC | BFR | C | 07/25/2019 | Frame corrections complete | JUSTINL | JUSTINL | | BFR | C | 6277364 |
DREAM TEAM CONSTRUCTION, INC | BFR | P | 07/23/2019 | Finished basement / Add ST22 straps per note A / Fireblock fireplace pipe at attic / | SHAUN | SHAUN | | BFR | P | 6273131 |
DREAM TEAM CONSTRUCTION, INC | BLA | P | 07/11/2019 | Need to seal electrical service entrance | TIMOTHYS | TIMOTHYS | | BLA | P | 6259983 |
DREAM TEAM CONSTRUCTION, INC | BFT | C | 06/27/2019 | Engineer letter for footing on file / | DALE | DALE | | BFT | C | 6245821 |
DREAM TEAM CONSTRUCTION, INC | BFN | C | 06/27/2019 | Engineer letter for foundation on file -- Eufer noted / | DALE | DALE | | BFN | C | 6245820 |
DREAM TEAM CONSTRUCTION, INC | BFD | C | 06/27/2019 | eng. observation for bft bfn on file | DALE | DALE | | BFD | C | 6245818 |
DREAM TEAM CONSTRUCTION, INC | BSP | P | 06/19/2019 | Front and Rear Porch Post and Lid OK -- Narrow Braced Wall OK / complete bft bfn bfd | DALE | DALE | | BSP | P | 6236652 |
DREAM TEAM CONSTRUCTION, INC | BFD | P | 05/10/2019 | Damp proofing OK / Drain is habitable to sump pit / still need eng. observation and soils report | PARKER | PARKER | | BFD | P | 6195705 |
DREAM TEAM CONSTRUCTION, INC | BFT | P | 05/10/2019 | need eng. observation, soils / foundation design and open hole on file / 2500 psf | DALE | DALE | | BFT | P | 6194509 |
DREAM TEAM CONSTRUCTION, INC | BFT | P | 04/15/2019 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 6165642 |
DREAM TEAM CONSTRUCTION, INC | BFN | P | 04/15/2019 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 6165641 |
DEPAUL ELECTRIC | E= | C | 10/08/2019 | | JOSEPH | JOSEPH | | E= | C | 6361290 |
DEPAUL ELECTRIC | E= | T | 10/07/2019 | PAID (REC#1635624): My punch list is ---------- no power to half of master bedroom and bedroom in basement under master ------------ TC ER cable needs to be in conduit ------------ no power to exterior plug by master bedroom exterior door ------------- hot tub pre wire ---------- ac ok 30 amp | CRAIG | CRAIG | | E= | T | 6360766 |
DEPAUL ELECTRIC | E= | R | 10/04/2019 | Not ready complete reinspection, Hot check before recalling | JOSEPH | JOSEPH | | E= | R | 6357662 |
DEPAUL ELECTRIC | ES | C | 07/17/2019 | Residential Overhead: 200 amp 3w new res meter in need reseal | JOSEPH | JOSEPH | | ES | C | 6267572 |
DEPAUL ELECTRIC | ER | C | 07/15/2019 | no mcc 2 - 10/3 4 - 6/3 al No Cent Vac / Non Irreversible UFER connection / Finished Basement / | CRAIG | CRAIG | | ER | C | 6264166 |
J2D ELECTRIC, INC. | EUG | C | 05/24/2019 | 250 KCMIL URD | JOSEPH | JOSEPH | | EUG | C | 6209707 |
J2D ELECTRIC, INC. | EUG | R | 05/21/2019 | remove snow ------------- | CRAIG | CRAIG | | EUG | R | 6206020 |
MECHANICAL CONCEPTS INC. | H= | C | 10/17/2019 | CORRECTIONS MADE. SEE IMAGES. | KYLEW | KYLEW | | H= | C | 6372283 |
MECHANICAL CONCEPTS INC. | H= | P | 10/14/2019 | FURNACE VENT TERMINATIONS NEED TO BE PRIMED AND GLUED. | KYLEW | KYLEW | | H= | P | 6367615 |
MECHANICAL CONCEPTS INC. | H= | P | 10/09/2019 | install furnace condensate vent riser. complete furnace vent condensate drain. complete furnace vent terminations. notes: finished basement, outside air to return, direct vent furnace, direct vent water heater, high/low grilles, a/c complete. | KYLEW | KYLEW | | H= | P | 6363368 |
MECHANICAL CONCEPTS INC. | H= | L | 10/07/2019 | locked. please notify builder of next inspection request. | KYLEW | KYLEW | | H= | L | 6359641 |
ROCKY MOUNTAIN MECHANICAL, LLC | HC | C | 07/22/2019 | RELEASE METER | RANDYB | RANDYB | | HC | C | 6271616 |
ROCKY MOUNTAIN MECHANICAL, LLC | HI | C | 07/22/2019 | 10 LB Test okay. | RANDYB | RANDYB | | HI | C | 6271612 |
ROCKY MOUNTAIN MECHANICAL, LLC | HI | P | 07/19/2019 | NEED NEW PRESSURE TEST TO BE ABLE TO VERIFY COMPLETED FIREPLACE LINE. | KYLEW | KYLEW | | HI | P | 6269552 |
MECHANICAL CONCEPTS INC. | HRR | C | 07/15/2019 | Equipment installed does not match equipment listed on approved duct design. Contractor must fill out the Equipment Change Form (Residential) and attach form to an inspection request by final. Form can be found on the PPRBD website under Downloads, Residential Handouts, Equipment Change Residential Duct Design. / NOTES: FINISHED BASEMENT, OUTSIDE AIR TO RETURN, DIRECT VENT FURNACE AND WATER HEATER, A/C ROUGH LINE SET AND COIL. | KYLEW | KYLEW | | HRR | C | 6263259 |
ROCKY MOUNTAIN MECHANICAL, LLC | HI | P | 07/09/2019 | CAP WATER HEATER GAS LINE. FIREPLACE NEEDS TO BE INSTALLED SO GAS LINE CAN BE RAN INTO FIREPLACE CABINET. 10 LB TEST OK. 1" MAIN, 1 FURNACE, 1 WATER HEATER, 1 RANGE 1 FIREPLACE, 1 BBQ. | KYLEW | KYLEW | | HI | P | 6256771 |
AFAB PLUMBING LLC | P= | C | 11/01/2019 | Potable Water Certificate attached | MALYNDA | MALYNDA | | P= | C | 6385319 |
AFAB PLUMBING LLC | P= | P | 10/25/2019 | Need Certificate of potable water. Rest OK. Note: No Irrigation stub. | SAMH | SAMH | | P= | P | 6380535 |
AFAB PLUMBING LLC | P= | R | 10/21/2019 | not ready, garage service sink not anchored, need anchor wall faucet, need to freeze protect trap, no water to kitchen faucet, reinspect all of basement, sewage ejector not working, pit not sealed, need certificate of potable water | TED | TED | | P= | R | 6375521 |
HOMEOWNER | PWO | C | 09/11/2019 | need certificate of potable water by final | TED | TED | | PWO | C | 6331882 |
AFAB PLUMBING LLC | PTO | C | 07/12/2019 | correction made | TED | TED | | PTO | C | 6262200 |
AFAB PLUMBING LLC | PTO | P | 07/11/2019 | need to insulate hot water lines 3/4'' and larger (iecc prescritive ), note: finished basement, all basement lavs aav, aav bar sink, hall lav aav, master lavs cwv, still no outside water line run into house | TED | TED | | PTO | P | 6260801 |
AFAB PLUMBING LLC | PB | C | 05/15/2019 | basement drains to sewage ejector, no water under footer or through wall at this time | TED | TED | | PB | C | 6200576 |