GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 11/15/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6400396 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/24/2019 | pending other finals/rest ok. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6241149 |
STURGEON ELECTRIC CO INC | E= | C | 06/07/2019 | | RANDY | RANDY | | E= | C | 6224219 |
STURGEON ELECTRIC CO INC | ER= | C | 06/07/2019 | ceilings ok | RANDY | RANDY | | ER= | C | 6224196 |
STURGEON ELECTRIC CO INC | ER | P | 05/09/2019 | walls only | RANDY | RANDY | | ER | P | 6193885 |
COLORADO SHEET METAL CO., INC. | H= | C | 11/15/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6400395 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/15/2019 | TEST AND BALANCE REPORT : OUTSIDE AIR READING ARE NOT PER THE MECHANICAL VENTILATION SCHEDULE PLAN PAGE M001. NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. | LIDO | LIDO | | H= | P | 6400227 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/07/2019 | TEST AND BALANCE REPORT IS MISSING THE OUTSIDE AIR READINGS. | LIDO | LIDO | | H= | P | 6390993 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/06/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 6389701 |
COLORADO SHEET METAL CO., INC. | H= | P | 10/31/2019 | PARTIAL PENDING : TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6384381 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/21/2019 | PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6240399 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/22/2019 | ABOVE CEILING DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6207314 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/25/2019 | correction made | TED | TED | | P= | C | 6242488 |
OLSON PLUMBING & HEATING COMPANY | P=S | C | 06/25/2019 | 3/4'' R.P. on cold supply to Dialysis Boxes | TED | TED | | P=S | C | 6242486 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/24/2019 | still need backflow device added to permit scope, rest ok, 3/4'' R.P. install | TED | TED | | P= | P | 6241541 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 05/15/2019 | under ground test and design ok | TED | TED | | PB | C | 6200094 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 05/15/2019 | dwv and water in walls test and design ok (need to add backflow to scope of work) | TED | TED | | PTO | C | 6200086 |