STAUFFER AND SONS CONSTRUCTION | B= | C | 12/03/2019 | | TIMOTHYS | TIMOTHYS | | B= | C | 6415047 |
STAUFFER AND SONS CONSTRUCTION | B= | P | 11/14/2019 | Temp CO: pending health dept ( Expires: 12/14/2019 12:00:00 AM) | TERRI | TERRI | | B= | P | 6399720 |
STAUFFER AND SONS CONSTRUCTION | B= | P | 11/13/2019 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6397690 |
STAUFFER AND SONS CONSTRUCTION | BSP | P | 11/13/2019 | Received Retaining wall engineers observation letter for footing and wall reinforcement, retaining wall design, and open hole | TIMOTHYS | TIMOTHYS | | BSP | P | 6397164 |
STAUFFER AND SONS CONSTRUCTION | BIN | C | 11/13/2019 | Received blower door test results - Received installers certificate for blown insulation | TIMOTHYS | TIMOTHYS | | BIN | C | 6397155 |
STAUFFER AND SONS CONSTRUCTION | B= | R | 11/12/2019 | Provide 3rd party insulation certificate - Provide blower door test results - Missing CO detector outside basement bedrooms - Mech room unprotected floor > 80 square feet - Seal holes in garage ceiling at garage door opener wires - Post PPRBC compliant address numbers on house - Retaining wall left of garage requires separate permit. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | R | 6396166 |
STAUFFER AND SONS CONSTRUCTION | BSP | R | 11/12/2019 | Upload septic letter to appropriate outside agency | TIMOTHYS | TIMOTHYS | | BSP | R | 6395739 |
STAUFFER AND SONS CONSTRUCTION | BLA | C | 09/11/2019 | Lath OK. | CHUCK | CHUCK | | BLA | C | 6331080 |
STAUFFER AND SONS CONSTRUCTION | BIN | C | 08/12/2019 | Reviewed Air Leakage Testing Requirements Per 2015 IECC Section R402.4.1.2 to be Provided by Final Inspection | DAKOTAB | DAKOTAB | | BIN | C | 6296966 |
STAUFFER AND SONS CONSTRUCTION | BFR | C | 08/06/2019 | Items corrected | TIMOTHYS | TIMOTHYS | | BFR | C | 6290983 |
STAUFFER AND SONS CONSTRUCTION | BFR | P | 08/05/2019 | missing h2.5 at hip at laundry / over bored studs at laundry / missing all 99 straps / strap all plate breaks / anchors missing thru-out / need 4k at header to patio at basement / Reviewed Air Leakage Testing Requirements Per 2015 IECC Section R402.4.1.2 to be Provided by Final Inspection / | DALE | DALE | | BFR | P | 6289029 |
STAUFFER AND SONS CONSTRUCTION | BSP | P | 07/31/2019 | Rear porch lid posts ok - Rear porch lid ok - Discussed framing inspection requirements and 2017 PPRBC code changes with contractor | TIMOTHYS | TIMOTHYS | | BSP | P | 6284261 |
STAUFFER AND SONS CONSTRUCTION | BSP | P | 07/17/2019 | Deck cover truss framing OK - need to install HTS20 on left side beam to exterior wall framing and bolts/fasteners at all column to beam/rafter/rafter tie connections per plan - can verify connections/strap at framing inspection. | CHUCK | CHUCK | | BSP | P | 6266601 |
STAUFFER AND SONS CONSTRUCTION | BFD | C | 05/31/2019 | Drain daylights - no street tie in. | CHUCK | CHUCK | | BFD | C | 6215631 |
STAUFFER AND SONS CONSTRUCTION | BFT | C | 05/30/2019 | | CHUCK | CHUCK | | BFT | C | 6214227 |
STAUFFER AND SONS CONSTRUCTION | BFN | C | 05/30/2019 | Foundation design on file - 5000# verified | CHUCK | CHUCK | | BFN | C | 6214224 |
STAUFFER AND SONS CONSTRUCTION | BFN | P | 05/30/2019 | Foundation reinforcement with UFER observation on file. - need foundation design to complete BFT/BFN. | CHUCK | CHUCK | | BFN | P | 6214086 |
STAUFFER AND SONS CONSTRUCTION | BFT | P | 05/30/2019 | Soils report and footing observation on file - 5% surface grade required - need foundation design. | CHUCK | CHUCK | | BFT | P | 6214080 |
STAUFFER AND SONS CONSTRUCTION | BFI | C | 05/29/2019 | R10 installed / | TIMOTHYS | TIMOTHYS | | BFI | C | 6213934 |
STAUFFER AND SONS CONSTRUCTION | BFD | R | 05/29/2019 | Need Open Hole and Foundation Engineering -- Need Verification of Under Drain Tie In at Street / Drain is installed usable -- Damp proofing OK / | TIMOTHYS | TIMOTHYS | | BFD | R | 6213914 |
STAUFFER AND SONS CONSTRUCTION | BFT | P | 05/29/2019 | Open ex. observation on file - 5000# / usable drain required - need soils report and footing/foundation observations to complete BFT/BFN inspections. | CHUCK | CHUCK | | BFT | P | 6212633 |
STAUFFER AND SONS CONSTRUCTION | BFT | P | 05/07/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 6191679 |
STAUFFER AND SONS CONSTRUCTION | BFN | P | 05/07/2019 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 6191678 |
ROWAN ELECTRIC LLC | E= | C | 11/04/2019 | 30 amp a/c , hot-tub prewire | TOMC | TOMC | | E= | C | 6387766 |
ROWAN ELECTRIC LLC | ES | C | 07/30/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 6282041 |
ROWAN ELECTRIC LLC | ER | C | 07/30/2019 | 200 , 100 a sub , 30 amp gen panel , 1- #8 , 3 - #6 , 1 - #2 , 2 - #10 , irreversible ufer , no mcc , no central vac , finished basement | TOMC | TOMC | | ER | C | 6282026 |
ROWAN ELECTRIC LLC | ESL | C | 06/26/2019 | 1 - floor box | TOMC | TOMC | | ESL | C | 6245288 |
ROWAN ELECTRIC LLC | EUG | C | 06/05/2019 | 250 urd | TOMC | TOMC | | EUG | C | 6221526 |
THE FURNACE GUY HEATING & COOLING | H= | C | 11/08/2019 | WHOLE HOUSE VENTILATION SWITCH AND LABEL, SEE IMAGES WHOLE HOUSE VENTILATION IS BEING ACHIEVED BY EXHAUST FAN IN LAUNDRY ROOM. WHOLE HOUSE VENTILATION MANUAL OVERRIDE SWITCH AND LABEL LOCATED IN LAUNDRY ROOM. NOTES: FINISHED BASEMENT, NO OUTSIDE AIR TO RETURN, 2 DIRECT VENT FURNACES, A/C COMPLETE | GREGV | GREGV | | H= | C | 6392643 |
THE FURNACE GUY HEATING & COOLING | H= | P | 11/07/2019 | THERE ARE THREE SWITCHES LABELED AS WHOLE HOUSE VENTILATION CONTROL SWITCH, THE WHOLE HOUSE VENTILATION CONTROL SWITCH IN THE LAUNDRY ROOM DOES NOT TURN OFF THE WHOLE HOUSE FAN IN THE LAUNDRY ROOM, CONTRACTOR TO ADDRESS THIS ISSUE AND PROVIDE LOCATION OF PROPER WHOLE HOUSE VENTILATION CONTROL SWITCH AT NEXT INSPECTION REQUEST. | GREGV | GREGV | | H= | P | 6391261 |
ALPHALETE MECHANICAL LLC | H= | L | 11/07/2019 | UPDATE NOVEMBER 7, 2019---GAS CONTRACTOR DOES NOT NEED TO REQUEST FINAL INSPECTION ON NEW CONSTRUCTION--. WHOLE HOUSE VENTILATION IS BEING ACHIEVED BY EXHAUST FAN LAUNDRY ROOM. MANUAL OVERRIDE SWITCH AND LABEL ARE LOCATED IN LAUNDRY ROOM AND MECHANICAL ROOM. NOTES: FINISHED BASEMENT, NO OUTSIDE AIR TO RETURN, 2 DIRECT VENT FURNACES, A/C COMPLETE. | GREGV | GREGV | | H= | L | 6391260 |
THE FURNACE GUY HEATING & COOLING | H= | P | 11/06/2019 | NEED WHOLE HOUSE VENTILATION SWITCH AND LABEL INSTALLED. OK TO SUBMIT PICTURES OF SWITCH AND LABEL. WHOLE HOUSE VENTILATION IS BEING ACHIEVED BY EXHAUST FAN IN LAUNDRY ROOM. NOTES: FINISHED BASEMENT, NO OUTSIDE AIR TO RETURN, 2 DIRECT VENT FURNACES, A/C COMPLETE | GREGV | GREGV | | H= | P | 6389923 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 08/05/2019 | Fireplace and vent ok, lower level. | JEFFL | JEFFL | | HV | C | 6288489 |
ALPHALETE MECHANICAL LLC | HC | C | 08/02/2019 | RELEASE METER | JEFFL | JEFFL | | HC | C | 6286814 |
ALPHALETE MECHANICAL LLC | HI | C | 08/02/2019 | 10 lb test ok. | JEFFL | JEFFL | | HI | C | 6286807 |
ALPHALETE MECHANICAL LLC | HI | P | 08/01/2019 | Low test. Gas lines required to be capped or installed to appliance for HI completion. 1 1/2'' main.. 2 furnace.. 1 water heater.. 2 fireplace.. 1 bbq.. | JEFFL | JEFFL | | HI | P | 6284796 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 07/25/2019 | | JEFFL | JEFFL | | HRR | C | 6276529 |
THE FURNACE GUY HEATING & COOLING | HRR | P | 07/24/2019 | Line set needs nail protection on main level- just before line set enters garage attic on top left side of wall. Water heater vent needs nail protection on main level. Notes-- direct vent furnace x2. AC rough coil and line set. Finished basement. No outside air to return. Whole house ventilation achieved with laundry exhaust fan, location of switch yet to be determined. | JEFFL | JEFFL | | HRR | P | 6275826 |
ALPHALETE MECHANICAL LLC | P= | C | 11/11/2019 | Potable Water Certificate uploaded. | MALYNDA | MALYNDA | | P= | C | 6394193 |
ALPHALETE MECHANICAL LLC | P= | P | 11/07/2019 | Need Certificate of potable water. Rest OK. Note: Bar Dishwasher not installed at time of inspection. No Irrigation stub. | SAMH | SAMH | | P= | P | 6391944 |
HOMEOWNER | PWO | C | 08/20/2019 | Need potable water certificate by final | MALYNDA | MALYNDA | | PWO | C | 6306658 |
ALPHALETE MECHANICAL LLC | PTO | C | 08/01/2019 | Corrections made. | SAMH | SAMH | | PTO | C | 6285295 |
ALPHALETE MECHANICAL LLC | PTO | P | 07/24/2019 | need freeze protection at washer, no test H2O, anchor closet flange, need to insulate hot water lines 3/4 inch and larger, rest ok, finished basement, aav's at laundry and bar sinks, all basement lavs, note: check water service connections and water heater by final. | TAYLOR | TAYLOR | | PTO | P | 6274863 |
ALPHALETE MECHANICAL LLC | PB | C | 06/25/2019 | | TAYLOR | TAYLOR | | PB | C | 6243077 |
ALPHALETE MECHANICAL LLC | PB | P | 06/24/2019 | need sleeve through foundation wall, rest ok, note: no water service at this time. | TAYLOR | TAYLOR | | PB | P | 6241190 |
STAUFFER AND SONS CONSTRUCTION | XBS | T | 11/12/2019 | PAID (REC#1643910) PLAN SPLICE FEE: $50 by: DANM for Construction: Added retaining wall that is doweled into foundation of home | DANM | DANM | | XBS | T | 6396819 |