ED GREEN & SON CONSTRUCTION | B= | C | 01/16/2020 | all finals done | TERRI | TERRI | | B= | C | 6454836 |
ED GREEN & SON CONSTRUCTION | B= | P | 01/15/2020 | Temp CO: Per Matt M. TCO pending mechanical final. ( Expires: 2/14/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6453971 |
ED GREEN & SON CONSTRUCTION | B= | P | 01/15/2020 | footing inspection complete. Additional Inspections Required (computer generated): NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6453287 |
ED GREEN & SON CONSTRUCTION | BFT | C | 01/15/2020 | footing and open excavation letter on file | BRIANB | BRIANB | | BFT | C | 6453284 |
ED GREEN & SON CONSTRUCTION | B= | P | 01/14/2020 | need to complete BFT inspection - see comments from BFT inspection dated 13JUN19 / pending other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6451969 |
ED GREEN & SON CONSTRUCTION | B= | P | 01/14/2020 | observation letter for roof drain penetration on file / need to complete BFT inspection / pending other final inspections. Additional Inspections Required (computer generated): NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6451965 |
ED GREEN & SON CONSTRUCTION | BSP | P | 01/03/2020 | Met on site with site superintendent, Discussed need for engineer letter accepting penetration of 6" roof drain penetrating bottom of the rated build out to be stamped by licensed design professional | DAKOTAB | DAKOTAB | | BSP | P | 6442276 |
ED GREEN & SON CONSTRUCTION | B= | R | 12/27/2019 | Need updated listing for 6" steel pipe penetrating bottom of build out at fire barrier in prep area -- Need to complete other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6437858 |
ED GREEN & SON CONSTRUCTION | BSP | P | 12/23/2019 | Firestop penetration at fire barriers inspection -- Firestop details for steel pipe, conduits, conduit bundle and head of wall detail received -- Need to review 6" steel pipe penetration listing with senior inspector, Currently have grabber firecaulk per wall listing received -- Rest of penetrations and head of wall detail OK | DAKOTAB | DAKOTAB | | BSP | P | 6435063 |
ED GREEN & SON CONSTRUCTION | BSP | P | 12/20/2019 | received observation letter for 1hr fire barrier U305 at liquor - storage room area at office | BRIANB | BRIANB | | BSP | P | 6433480 |
ED GREEN & SON CONSTRUCTION | BSP | P | 12/12/2019 | received stamped detail for portion of stl stud framing that is installed to face of existing CMU wall at west fire barrier in storage (S-2) | BRIANB | BRIANB | | BSP | P | 6425231 |
ED GREEN & SON CONSTRUCTION | BSP | R | 12/11/2019 | firestop penetration inspection for fire barriers requested / not ready for inspection - missing firestop details for multiple penetrations and firestop incomplete at penetrations / walked inspection with site superintendent | BRIANB | BRIANB | | BSP | R | 6424070 |
ED GREEN & SON CONSTRUCTION | BSP | P | 12/10/2019 | final layer of drywall per W 415 at CMU wall okay , Head of wall protection at same location okay | BOBF | BOBF | | BSP | P | 6423025 |
ED GREEN & SON CONSTRUCTION | BSP | P | 12/05/2019 | PARTIAL / GYP - MTL wall frame INSPECTION / WEST FIRE BARRIER AT STORAGE (S-2) / portion of stl stud framing is installed to face of existing CMU wall is not per design - need re-inspection for this portion of the wall / observed mtl wall framing above existing CMU block wall for fire barrier and base layer - 2nd layer of 5/8" x gyp (UL W415 - see sheet R-1 detail 1a per approved splice) / need fire stop details for all penetrations and inspected | BRIANB | BRIANB | | BSP | P | 6417329 |
ED GREEN & SON CONSTRUCTION | BSP | R | 12/03/2019 | gyp inspection cancelled onsite by Fred / reviewed UL W415 assembly with site reps | BRIANB | BRIANB | | BSP | R | 6414984 |
ED GREEN & SON CONSTRUCTION | BFR | P | 12/03/2019 | PARTIAL / observed in-fill wall framing at existing CMU wall between storage and market area in (2) locations | BRIANB | BRIANB | | BFR | P | 6414973 |
ED GREEN & SON CONSTRUCTION | B= | R | 12/02/2019 | not ready for final inspection / still need to complete fire barriers and inspections / went over inspection history and fire barrier assemblies with site superintendent / also discussed needing fire stop details for all penetrations at fire barriers and inspected. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | R | 6413193 |
ED GREEN & SON CONSTRUCTION | BSP | P | 11/18/2019 | PARTIAL / 1ST - 2ND LAYER GYP / EXISTING MARKET AREA - S-2 / NORTH FIRE BARRIER WALL / observed 1st and 2nd layer 5/8" x gyp at north fire barrier wall / see detail 2a on sheet R-1 from approved plan splice dated 29OCT19 / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 6402342 |
ED GREEN & SON CONSTRUCTION | BFR | P | 11/18/2019 | PARTIAL / STL STUD WALL FRAME RE-INSPECTION / EXISTING MARKET AREA - S-2 / NORTH FIRE BARRIER WALL / frame corrections okay - BFR dated 22OCT19 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6402292 |
ED GREEN & SON CONSTRUCTION | BSP | P | 11/06/2019 | PARTIAL / observed 3rd - face layer 5/8" gyp at steel beam along top of existing CMU wall for east - north east fire barrier at existing market - S-2 seafood area only / see approved plan splice dated 29OCT19 - (sheet R1 detail 1B - UL W415) / will need fire stop details for all through penetrations and inspected / pending other rough inspections / discussed 703.7 marking and identification at accessible concealed space at fire barriers with site rep Pat | BRIANB | BRIANB | | BSP | P | 6389943 |
ED GREEN & SON CONSTRUCTION | BSP | P | 11/01/2019 | PARTIAL / observed 1st and 2nd layer 5/8" gyp at steel beam along top of existing CMU wall for east - north east fire barrier at existing market - S-2 seafood area / see approved plan splice dated 29OCT19 - (sheet R1 detail 1B - UL W415) / will need fire stop details for all through penetrations and inspected at 3rrd layer - face layer / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 6386428 |
ED GREEN & SON CONSTRUCTION | BFR | P | 10/30/2019 | PARTIAL / observed mtl wall framing at steel beam along top of existing CMU wall for east - north east fire barrier at existing market - S-2 seafood area / see approved plan splice dated 29OCT19 - (sheet R1 detail 1B - UL W415) / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6384007 |
ED GREEN & SON CONSTRUCTION | BSP | R | 10/28/2019 | need to update design to reflect as built condition for fire barrier wall at existing vegetable - prep (s-2) area for inspection / fire barrier wall does not match existing condition / need complete re-inspection | BRIANB | BRIANB | | BSP | R | 6381679 |
ED GREEN & SON CONSTRUCTION | BFR | R | 10/28/2019 | need to update design to reflect as built condition for fire barrier wall at existing vegetable - prep (s-2) area for inspection / fire barrier wall does not match existing condition / need complete re-inspection | BRIANB | BRIANB | | BFR | R | 6381674 |
ED GREEN & SON CONSTRUCTION | BSP | P | 10/28/2019 | GYP INSPECTION / gyp inspection requested for north west - south west fire barrier wall at existing market area - S-2 area (see approved plan splice dated 21OCT19 sheet A-3a) observed 2nd and 3rd layer 5/8" AGX gyp - UL W415 | BRIANB | BRIANB | | BSP | P | 6381669 |
ED GREEN & SON CONSTRUCTION | BFR | P | 10/22/2019 | PARTIAL / STL STUD WALL FRAME / EXISTING MARKET AREA - S-2 / NORTH FIRE BARRIER WALL / mtl studs installed flat over east end of wall not per design / observed other light gauge wall framing above existing stl stud wall at north end of existing market area only (see approved plan splice dated 21OCT19) / need mechanical inspections for fire dampers - pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6376465 |
ED GREEN & SON CONSTRUCTION | BSP | R | 10/22/2019 | GYP INSPECTION / gyp inspection requested for north west - south west fire barrier wall at existing market area - S-2 area (see sheet A-3a) / approved design reflects existing 8" CMU wall to deck with in-fill at door areas only - CMU wall does not extend to roof deck as shown on design - need to revise design to reflect as-built condition with light gauge wall framing above existing CMU wall / observed base layer 5/8" AGX-1 gyp only | BRIANB | BRIANB | | BSP | R | 6376464 |
ED GREEN & SON CONSTRUCTION | BFR | R | 10/14/2019 | PARTIAL / STL STUD WALL FRAME / EXISTING MARKET AREA / NORTH WALL / wall framing does not extend to roof deck - fire barrier continuity is interrupted by steel beam at top of wall / have mechanical penetrations through wall and need to be inspected by mechanical inspector / need complete re-inspection - reviewed fire barrier wall assembly UL U465 with site superintendents | BRIANB | BRIANB | | BFR | R | 6367777 |
ED GREEN & SON CONSTRUCTION | BSP | R | 10/14/2019 | PARTIAL / BASE LAYER GYP / EXISTING MARKET AREA - N.W CORNER / base layer gyp incomplete at stl columns at fire barrier wall UL U465 / need complete re-inspection | BRIANB | BRIANB | | BSP | R | 6367769 |
ED GREEN & SON CONSTRUCTION | BFR | P | 10/04/2019 | Interior light gauge framing at Northwest corner of building OK -- Reviewed rated assembly and inspection process with contractor | DAKOTAB | DAKOTAB | | BFR | P | 6357728 |
ED GREEN & SON CONSTRUCTION | BSP | P | 09/11/2019 | observed 2nd layer 5/8" x gyp at beam per detail 1b on sheet R-1 of approved plan splice in b area at 1hr fire barrier | BRIANB | BRIANB | | BSP | P | 6332311 |
ED GREEN & SON CONSTRUCTION | BSP | P | 08/26/2019 | observed first layer of listing W415 along area B at top of masonry wall per details 1A/B/C on R1 splice/gypsum and screw pattern per listing/provide listing for I beam through penetrations of assembly -- observed 1st layer of drywall and screw pattern for infill of masonry wall per detail 2 on R1 splice and listing U420/gypsum and screw pattern per listing | SCOTTS | SCOTTS | | BSP | P | 6313702 |
ED GREEN & SON CONSTRUCTION | BSP | P | 08/16/2019 | observed steel channel stud framing at beam per detail 1b on sheet R-1 in b area at 1hr fire barrier / observed in-fill framing at 1hr fire barrier in area b per details 1a - 2 - 3 on sheet R-1 of the approved design / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 6304389 |
ED GREEN & SON CONSTRUCTION | BFR | P | 08/16/2019 | PARTIAL / observed drop soffit framing in new market area / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6304385 |
ED GREEN & SON CONSTRUCTION | BFR | P | 07/25/2019 | Interior framing inspection/no fire rated assemblies inspected this visit -- observed framing per plan at veggie prep/closet by veggie prep room/liquor store/liquor department -- complete other rough inspections -- Reviewed Accessible Elements / | SCOTTS | SCOTTS | | BFR | P | 6276454 |
ED GREEN & SON CONSTRUCTION | BSP | R | 06/13/2019 | PARTIAL / partial frame inspection for fire barrier U415 at AREA B ONLY / new wall framing for 1 hr fire barrier does not bear on top of existing 1hr wall and meet fire barrier supporting construction requirements per 707.5.1 / observed C - H shaped stud framing and USG type slx gyp panels at area b only / will need to provide firestop details for stl beam through penetrations and head of wall and both inspected / still need to inspect gyp and framing for areas of in-fill at existing fire barrier at area b as well / note - need to attach electrical and plumbing to permit / updated for clarification 6/14 - need to revise design to match as built condition - U415 wall assembly does not apply to this condition at steel beam in area b / will need fire rated assembly for beam wrap - see sheet A-3a / called site superintendent and went over updated comments | BRIANB | BRIANB | | BSP | R | 6230966 |
ED GREEN & SON CONSTRUCTION | BFT | R | 06/13/2019 | need open hole letter to verify bearing capacity / okay to use licensed design professional to perform inspection / stamped observation letter to follow / no inspection performed | BRIANB | BRIANB | | BFT | R | 6230963 |
STILSON ELECTRIC SYSTEMS, INC. | E= | C | 01/08/2020 | FIRE ALARM INSPECTION: | CRAIG | CRAIG | | E= | C | 6446794 |
STILSON ELECTRIC SYSTEMS, INC. | ER | C | 01/08/2020 | FIRE ALARM INSPECTION: 14/2 and 16/2 fplp cable ok | CRAIG | CRAIG | | ER | C | 6446761 |
RIVIERA ELECTRIC, LLC | E= | C | 11/18/2019 | interior remodel complete | CHIPO | CHIPO | | E= | C | 6402051 |
RIVIERA ELECTRIC, LLC | EP | C | 11/18/2019 | Bonding verified | CHIPO | CHIPO | | EP | C | 6402046 |
RIVIERA ELECTRIC, LLC | E= | R | 11/15/2019 | Made automated call ahead, arrived at 25 minute mark, manually called call ahead number at 27 minute mark and got voicemail. Left message giving call ahead additional time and waited, but no return call no contractor showed up. | CHIPO | CHIPO | | E= | R | 6400391 |
RIVIERA ELECTRIC, LLC | EP | P | 10/09/2019 | 300 amp 4/w new sub panel 250.104 3 D verify on final | CRAIG | CRAIG | | EP | P | 6363601 |
RIVIERA ELECTRIC, LLC | ER | P | 10/09/2019 | cold prep area above ceiling ok ------------------------- 175 amp disconnect 112.5 xfmr 300 amp sub panel ok 250.104 3 D verify bonding on final | CRAIG | CRAIG | | ER | P | 6363581 |
RIVIERA ELECTRIC, LLC | ER | P | 07/24/2019 | walls ok | CRAIG | CRAIG | | ER | P | 6274711 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 01/16/2020 | TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | H= | C | 6454667 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 12/05/2019 | NOTE: Notified Fire engineer Chip of three added fire/smoke dampers and duct detectors. He put a note in the system so fire will look at them. FINAL PENDING - Provide test and balance report for review. | MARKB | MARKB | | H= | P | 6417095 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/03/2019 | AREA "C" DAMPER INSTALL - 3 DAMPERS COMPLETE WITH ANGLES, ACCESS DOORS AND BREAK AWAY. Still need to label grid and access doors. | MARKB | MARKB | | HD | P | 6414376 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 11/15/2019 | NEW SPLICE INTO PLANS ADDS ADDITIONAL AREA OF WORK. AREA "C" DAMPER FRAMING COMPLETE FOR 3 DAMPERS IN S-2 AREA WALL BETWEEN EXISTING MARKET AND STORAGE IN NEW FIRE BARRIER. AREA "B" DUCT CAPS COMPLETE. | MARKB | MARKB | | HD | P | 6401304 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 10/01/2019 | FOR FINAL - Cap area (B) trunks and provide test and balance report for review. PLAN SPLICE SHOW F/S DAMPERS 1,2 & 3 BEING REMOVED A DUCT CAPPED OFF. ALL FLEX AND DIFFUSERS FOR AREAS (A) & (B) COMPLETE. | MARKB | MARKB | | H= | P | 6354148 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 08/28/2019 | AREA (A): FIRE/SMOKE DAMPERS, DUCT CONNECTIONS, ACCESS DOORS AND EXHAUST COMPLETE. AREA (B): DAMPER INSTALL - ANNULAR SPACE, ANGLES, DUCT CONNECTION AND ACCESS DOOR FOR FSD-4 IN MASONRY WALL COMPLETE. Still need other dampers installed. | MARKB | MARKB | | HD | P | 6317470 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/26/2019 | AREA (A): Annular spacing for dampers (3) at CMU wall ok. Damper framing above double door openings (2) ok, still need to see damper installations at metal stud walls | MARKB | MARKB | | HD | P | 6245459 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HSP | P | 06/24/2019 | ENGINEER LETTER FOR DAMPER FRAMING ABOVE A DOUBLE DOOR RECEIVED AND SCANNED, SEE IMAGES. STILL NEED ON SITE INSPECTION OF DAMPER FRAMING. | NANCY | NANCY | | HSP | P | 6241687 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/13/2019 | ----Need engineer to address damper support for FSD-4 mounted over double door---- AREA (A): Damper framing in metal stud - Need to verify screws inside damper frame do not encroach into required annular space. Dampers in block wall - need one side of angles removed on all dampers to verify annular space. | MARKB | MARKB | | HD | P | 6230903 |
R AND D PLUMBING | P= | C | 11/21/2019 | new market area, cold case area | TED | TED | | P= | C | 6406580 |
R AND D PLUMBING | PTO | C | 08/02/2019 | Domestic water over head in new market area ok. Note: at final check vtr to air intake. | DANR | DANR | | PTO | C | 6286836 |
R AND D PLUMBING | PTO | P | 07/31/2019 | Veggi prep area to mop sink in wall and over head DWV inspection: Nail protection and domestic water test this area ok. Note: at final check vtr to air intake. | DANR | DANR | | PTO | P | 6284046 |
R AND D PLUMBING | PTO | P | 07/30/2019 | Veggi prep area to mop sink in wall and over head DWV inspection: Need nail protection, low domestic water test, rest ok this area. Note: at final check vtr to air intake. | DANR | DANR | | PTO | P | 6281983 |
R AND D PLUMBING | PB | C | 07/12/2019 | under ground for floor drains to sanitary, test and design ok, | TED | TED | | PB | C | 6261339 |
R AND D PLUMBING | PB | P | 06/14/2019 | need plan spice for plumbing changes and added or removed floor sinks, under ground for grease drain lines test and design ok | TED | TED | | PB | P | 6231421 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | T | 11/15/2019 | PAID (REC#1644773) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: new sheet added M-3 | DALEH | DALEH | | XMS | T | 6400671 |
ED GREEN & SON CONSTRUCTION | XBS | T | 10/29/2019 | PAID (REC#1640638) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added notes for existing demising walls | LBENNETT | LBENNETT | | XBS | T | 6382543 |
ED GREEN & SON CONSTRUCTION | XBS | T | 10/21/2019 | PAID (REC#1639013) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Rated wall details | SHELLEY | SHELLEY | | XBS | T | 6375589 |
RIVIERA ELECTRIC, LLC | XES | T | 09/27/2019 | PAID (REC#1634327): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised plans to reflect removal | BERTHA | BERTHA | | XES | T | 6350364 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | T | 08/02/2019 | PAID (REC#1619303) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice page addressing fire Damper and schedule | TCRIPPEN | TCRIPPEN | | XMS | T | 6286603 |
ED GREEN & SON CONSTRUCTION | XBS | T | 07/23/2019 | PAID (REC#1622609) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Specified occupancy separations | LBENNETT | LBENNETT | | XBS | T | 6273808 |
R AND D PLUMBING | XPS | T | 07/09/2019 | PAID (REC#1613621) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 7/9/19: Delta R1 P1 reroute FS drains and added FS, P3 adjust waste and vent isometric. | SHANEN | SHANEN | | XPS | T | 6256702 |
NIELSEN MECHANICAL CONTRACTORS, INC. | XMS | T | 06/13/2019 | PAID (REC#1606243) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice adding FIRE/SMOKE Dampers | TCRIPPEN | TCRIPPEN | | XMS | T | 6230185 |