CRADDOCK DEVELOPMENT COMPANY, INC. | B= | C | 08/20/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6680353 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | L | 08/18/2020 | Renewed online for 1/2 Fee at 8/18/2020 1:37:24 PM (RECEIPT #: 1705458) | WEBSITE | WEBSITE | | BE | L | 6676727 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 08/21/2019 | pending completion f plumb, mech and fire finals, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6308948 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BSP | P | 07/01/2019 | request was for drywall screw inspection no rated walls with in suite, screw inspection not required | BOBF | BOBF | | BSP | P | 6250139 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 06/20/2019 | Could not locate site rep - pending other required inspections, interior wall framing okay | BOBF | BOBF | | BFR | P | 6237733 |
RYBA ELECTRIC, INC. | ES | C | 08/16/2019 | Commercial Service: 200-amp 4-wire service, no action required by utility. / | CRAIG | CRAIG | | ES | C | 6303311 |
RYBA ELECTRIC, INC. | E= | C | 08/16/2019 | | CRAIG | CRAIG | | E= | C | 6303309 |
RYBA ELECTRIC, INC. | ER | C | 08/16/2019 | drop ceiling in both bathrooms ok | CRAIG | CRAIG | | ER | C | 6303297 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 08/06/2019 | FIRE ALARM INSPECTION: F A complete | CRAIG | CRAIG | | E= | C | 6290213 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 08/06/2019 | FIRE ALARM INSPECTION: 14/2 fplp cable to 5 new devices ok | CRAIG | CRAIG | | ER | C | 6290205 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 08/06/2019 | FIRE ALARM INSPECTION: 14/2 fplp cable to 5 new devices ok | CRAIG | CRAIG | | E= | C | 6290206 |
RYBA ELECTRIC, INC. | ES | P | 07/24/2019 | Commercial Service: Pre release ok / | CRAIG | CRAIG | | ES | P | 6275168 |
RYBA ELECTRIC, INC. | ER | P | 06/14/2019 | walls ok / Discussed accessibility requirements with contractor / contractor to lower switches and restroom gfci's verify on final / | BRIAN | BRIAN | | ER | P | 6232361 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 09/24/2019 | TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | H= | C | 6345219 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/23/2019 | FINAL PENDING - Provide test and balance report for review | MARKB | MARKB | | H= | P | 6311638 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/20/2019 | FINAL PENDING - Replace broken thermostat missing face and provide test and balance report. OTHER ITEMS ADDRESSED. | MARKB | MARKB | | H= | P | 6307155 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/08/2019 | FINAL PENDING - Replace broken thermostat on east wall, address duct for rtu-13(supplies not in correct room), undercut doors per plan, address return air for rm 102 and provide test and balance report for review. DUCT/DIFFUSER INSTALLED ABOVE FRONT ENTRY | MARKB | MARKB | | H= | P | 6293428 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 08/06/2019 | FOR FINAL - Install supply duct/grill over west entry door/entry area. Replace missing thermostat on east wall. Provide test and balance report for review. ABOVE CEILING DUCT - SUPPLY/EXHAUST (except for mentioned above & rtu-13) DUCT INSTALLED PER PLAN. ROOF EQUIPMENT AND PENETRATIONS COMPLETE. | MARKB | MARKB | | HD | C | 6290310 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 09/26/2019 | Ok. | DANR | DANR | | P= | C | 6349641 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 09/26/2019 | Vent test ok. | DANR | DANR | | PTO | C | 6349631 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 09/25/2019 | Need safe ladder access to roof and PTO complete. | DANR | DANR | | P= | P | 6347674 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 09/25/2019 | Need test overhead VTR. | DANR | DANR | | PTO | P | 6347645 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 08/22/2019 | Need PTO completed, need access to roof vtr to air intake, rest ok. | DANR | DANR | | P= | P | 6311249 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 07/15/2019 | Need test dwv overhead to vtr, rest ok. Note: at final check water heater, vtr to air intakes, over head insulation. | DANR | DANR | | PTO | P | 6263351 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 07/11/2019 | Women's accessible toilet side clearance 19" off dry wall, no test on overhead DWV and domestic water, rest ok. Note: check water heater and vtr to air intakes at final. | DANR | DANR | | PTO | P | 6260300 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/18/2019 | In wall DWV and domestic water inspection: Mens restroom toilet water line needs nail protection, rest ok in wall, ok to insulate domestic water hot lines. Note: need all over head piping and toilet flanges glued and anchored. | DANR | DANR | | PTO | P | 6235354 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/04/2019 | | DANR | DANR | | PB | C | 6219730 |