MORLEY ENTERPRISES | B= | C | 10/24/2019 | All other required Final inspections are complete. (This is a computer generated result) | DAKOTAB | DAKOTAB | | B= | C | 6378838 |
MORLEY ENTERPRISES | B= | P | 10/16/2019 | Building final OK pending other finals. Additional Inspections Required (computer generated): AFFORDABLE SERVICES CORP. Mechanical Final Inspection is not Completed yet, ROOTER TOWN Plumbing Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6370073 |
MORLEY ENTERPRISES | BFR | C | 10/16/2019 | Items corrected | DAKOTAB | DAKOTAB | | BFR | C | 6370068 |
MORLEY ENTERPRISES | BFR | P | 06/28/2019 | observed light gauge wall framing / need to attach mechanical and plumbing to permit and complete other rough inspections / discussed accessible elements with the site rep / note - pre-existing restroom | BRIANB | BRIANB | | BFR | P | 6247633 |
SEDLAK ELECTRIC CO. | E= | C | 08/09/2019 | | CRAIGS | CRAIGS | | E= | C | 6294929 |
SEDLAK ELECTRIC CO. | ER | P | 06/19/2019 | knee walls OK --- ceiling fixtures need to be tied back to the structure in all 4 corners | CRAIGS | CRAIGS | | ER | P | 6236342 |
AFFORDABLE SERVICES CORP. | H= | C | 10/24/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. SCOPE OF WORK CORRECTED | BILLS | BILLS | | H= | C | 6378837 |
AFFORDABLE SERVICES CORP. | H= | P | 10/16/2019 | FINAL PENDING - Correct permit scope and provide test and balance report for review. | MARKB | MARKB | | H= | P | 6371181 |
AFFORDABLE SERVICES CORP. | HD | P | 09/16/2019 | Correct permit scope of work to include exhaust fan and duct. Remove vent from scope. No rough inspection was requested before ceiling tiles were installed - will need ceiling tiles removed to inspect all new work. Duct does not match approved plan. Will need access provided to roof to inspect exhaust fan termination. | MARKB | MARKB | | HD | P | 6337251 |
ROOTER TOWN LLC | P= | C | 10/17/2019 | Corrections made. | DANR | DANR | | P= | C | 6371618 |
ROOTER TOWN LLC | P= | P | 10/16/2019 | Need overhead pipe support and insulation noted on PTO, need hand sprayer slide bar per code, rest ok. | DANR | DANR | | P= | P | 6370141 |
ROOTER TOWN LLC | PB | C | 07/02/2019 | Shower drain ok. | DANR | DANR | | PB | C | 6252157 |
ROOTER TOWN LLC | PTO | P | 07/02/2019 | Can complete PTO after mechanical permit is attached (talked to on site G.C), Discussed accessible elements with G.C.,rest ok. Note: by final need over head pipe support hot line and insulation, water heater T&P needs 1-1/2 to 6" air gap at pan lip. | DANR | DANR | | PTO | P | 6252155 |
ROOTER TOWN LLC | PTO | T | 07/01/2019 | PAID (REC#1611134) Left list with G.C., re-inspect all. | DANR | DANR | | PTO | T | 6249882 |
ROOTER TOWN LLC | P= | R | 06/26/2019 | Wrong address and scope of work should be 4337 - 110. Need permit attached for plumbing work to proper address. | DANR | DANR | | P= | R | 6247797 |
AFFORDABLE SERVICES CORP. | XMS | T | 09/17/2019 | PAID (REC#1630447) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: reroute bath exhaust to side wall | TCRIPPEN | TCRIPPEN | | XMS | T | 6337600 |
MORLEY ENTERPRISES | XMS | P | 06/19/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised for added shower in backgrounds with new EF | JUSTINC | JUSTINC | | XMS | P | 6236881 |
MORLEY ENTERPRISES | XPS | P | 06/19/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 6/19/19: Plumbing page P1 added shower and piping | SHANEN | SHANEN | | XPS | P | 6236874 |
MORLEY ENTERPRISES | XBS | T | 06/19/2019 | PAID (REC#1607792) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor plan and added roll-in shower. | SHELLEY | SHELLEY | | XBS | T | 6236859 |