AZTEC GENERAL CONTRACTORS, LLC | B= | C | 08/27/2019 | | LONNYS | LONNYS | | B= | C | 6315006 |
AZTEC GENERAL CONTRACTORS, LLC | B= | P | 08/06/2019 | Temp CO: need mech and building ( Expires: 9/5/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6290162 |
AZTEC GENERAL CONTRACTORS, LLC | B= | P | 08/02/2019 | pending other required final inspections / building final OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet, External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), External Agency Inspection U= by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UBS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, EL PASO PLUMBING, INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 6286681 |
AZTEC GENERAL CONTRACTORS, LLC | BFR | P | 08/02/2019 | pending other required inspections / received engineer letter for new roof ceiling framing for RTU at rear storage room / framing OK per engineer letter | LONNYS | LONNYS | | BFR | P | 6286678 |
COLORADO SHEET METAL CO., INC. | BSP | P | 07/30/2019 | ADDITIONAL PLAN REVIEW TIME: (No Fee) From: BECKYA Additional framing changes per LB | BECKYA | BECKYA | | BSP | P | 6281351 |
AZTEC GENERAL CONTRACTORS, LLC | BSP | P | 07/26/2019 | engineer letter for repair of 2 hour exterior wall assembly on file | LONNYS | LONNYS | | BSP | P | 6277661 |
AZTEC GENERAL CONTRACTORS, LLC | BFR | P | 07/10/2019 | pending other required inspections / need to attach mechanical permit / still need engineer observation and fix for repaired CMU rated walls / front north west office framing OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 6258553 |
AZTEC GENERAL CONTRACTORS, LLC | BFR | P | 07/03/2019 | pending other required inspections / still need to inspect framing for both front north offices / still need observation for repairs at existing CMU walls / light gauge steel framing OK for south office, storage, and rest rooms / hard lid ceiling framing OK for south office, storage, and rest room / verified new lintel framing for SE door / Reviewed Accessible Elements with site rep mark | LONNYS | LONNYS | | BFR | P | 6252742 |
AZTEC GENERAL CONTRACTORS, LLC | BSP | R | 06/27/2019 | engineer letter for CMU fix requires stamp / design change for existing 2 hour CMU assembly needs to be spliced in | LONNYS | LONNYS | | BSP | R | 6245885 |
AZTEC GENERAL CONTRACTORS, LLC | BFR | P | 06/18/2019 | need to attach mechanical permit / pending other required inspections / provide engineer observation for portions CMU wall removed for capping lines on north and east perimeter walls / light gauge steel framing at north and east perimeter walls OK / training with inspector Bob F | LONNYS | LONNYS | | BFR | P | 6235157 |
AZTEC GENERAL CONTRACTORS, LLC | BSP | P | 06/18/2019 | training with Lonnie S. - reviewed light metal framing, accessible elements in multi stall rest rooms, requirements for welding at let in lintels, IIIB construction | BOBF | BOBF | | BSP | P | 6235155 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | C | 08/01/2019 | correction made / | BRIAN | BRIAN | | E= | C | 6285590 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 07/31/2019 | drinking fountains requires GFCI protection / | MIGUEL | MIGUEL | | E= | R | 6283690 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 07/25/2019 | above ceiling in 101, 102, 103, 104, and 105 ok | CRAIG | CRAIG | | ER | P | 6276568 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 07/23/2019 | above ceiling in sales floor only ok | CRAIG | CRAIG | | ER | P | 6273643 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 07/10/2019 | west office walls and bathroom hard lids ok----- Discussed accessibility requirements with contractor / | TIMA | TIMA | | ER | P | 6258345 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 06/27/2019 | walls only in bathrooms and mech room , waiting on fans | BRIAN | BRIAN | | ER | P | 6246996 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 06/21/2019 | walls only ok marked on plans | CRAIG | CRAIG | | ER | P | 6239377 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 06/13/2019 | walls see plans -- NOTE will need arc shields on final | BRIAN | BRIAN | | ER | P | 6230609 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 06/11/2019 | pendant lights / light strips -------------- marked on plans | CRAIG | CRAIG | | ER | P | 6226928 |
COLORADO SHEET METAL CO., INC. | H= | C | 08/26/2019 | TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | H= | C | 6313487 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/02/2019 | FINAL PENDING - Install smoke duct detector in return with remote indicator, label unit on roof for suite and provide test and balance report for review | MARKB | MARKB | | H= | P | 6287033 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/02/2019 | Engineer letter received for transfer grills in place of undercut doors, still need plan splice for moving makeup unit on roof | MARKB | MARKB | | H= | P | 6286111 |
EL PASO PLUMBING, INC. | H= | C | 07/29/2019 | GAS SCOPE COMPLETE | MARKB | MARKB | | H= | C | 6279935 |
COLORADO SHEET METAL CO., INC. | HD | P | 07/29/2019 | ----CONSTRUCTION AND MECHANICAL PLAN SPLICE REQUIRED FOR NEW MAKEUP AIR UNIT AND DUCT ON ROOF. NEED STRUCTURAL ENGINEER LETTER FOR ADDED WEIGHT TO ROOF.---- SUPPLY/RETURN DUCT ON ROOF OK FOR SUPPORT SIZE PER APPROVED PLAN WRAP AT OWN RISK. | MARKB | MARKB | | HD | P | 6279930 |
EL PASO PLUMBING, INC. | HC | C | 07/26/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6278560 |
EL PASO PLUMBING, INC. | HI | C | 07/26/2019 | FOR FINAL - Support gas piping on roof at unit and remove unit heater from permit scope. 10 PRESSURE TEST ON ENTIRE GAS SYSTEM OK. MAKEUP UNIT IS ONLY APPLIANCE ON GAS METER, ALL EXISTING BRANCHES HAVE BEEN CAPPED OFF. | MARKB | MARKB | | HI | C | 6278556 |
COLORADO SHEET METAL CO., INC. | HD | P | 07/17/2019 | ----PLAN SPLICE REQUIRED FOR MOVING MAKEUP AIR UNIT---- ----NEED GAS CONTRACTOR ATTACHED TO PERMIT---- ABOVE CEILING DUCT PER PLAN | BILLS | BILLS | | HD | P | 6266843 |
COLORADO SHEET METAL CO., INC. | HD | P | 07/16/2019 | NOTE ADDED 7/17/19: After discussion with building inspector, duct and diffusers need to be hung no lower than 7'6" from the floor per 2015 IBC 1208.2 ----PLAN SPLICE REQUIRED FOR MOVING MAKEUP AIR UNIT---- ----NEED GAS CONTRACTOR ATTACHED TO PERMIT---- ABOVE CEILING DUCT PER PLAN EXCEPT: Dryer duct concealed without proper inspection. | MARKB | MARKB | | HD | P | 6265422 |
EL PASO PLUMBING, INC. | P= | C | 08/02/2019 | Corrections made. | DANR | DANR | | P= | C | 6287372 |
EL PASO PLUMBING, INC. | P= | P | 07/29/2019 | Need tempering at lavatories, need partitions installed, engineers approval letter for added floor drains in restrooms, rest ok. | DANR | DANR | | P= | P | 6280901 |
EL PASO PLUMBING, INC. | PTO | C | 07/02/2019 | Corrections made. Note: by final need engineer approval for added floor drains in bathrooms (PB note), check water heater at final. | DANR | DANR | | PTO | C | 6251947 |
EL PASO PLUMBING, INC. | PTO | P | 07/01/2019 | Insulation hot water lines, nail protection through out, support vent above water entry, anchor toilet flanges, isolation water lines to washer at top plate, rest ok. Note: check water heater at final. | DANR | DANR | | PTO | P | 6250630 |
EL PASO PLUMBING, INC. | PB | C | 06/10/2019 | Ok. Note: by final need engineer approval for added floor drains in rest rooms. | DANR | DANR | | PB | C | 6226320 |
COLORADO SHEET METAL CO., INC. | XMS | T | 07/30/2019 | PAID (REC#1618164) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for layout changes and cooling to MUA | JUSTINC | JUSTINC | | XMS | T | 6281338 |